TenderDekho Logo
Closed GEM

Contract Bidding Open For LED TUBE LIGHTS 230V AC,40 WATTS,LED TUBE LIGHTS 230V AC,22 WATTS,110V DC INDICATION BULBS RED COLO in NALGONDA, TELANGANA

Bid Publish Date

02-Dec-2025, 2:30 pm

Bid End Date

12-Dec-2025, 4:00 pm

EMD

₹30,000

Progress

Issue02-Dec-2025, 2:30 pm
Technical12-Dec-2025, 2:42 pm
Financial
Award04-Jun-2026, 12:57 am
Explore all 4 tabs to view complete tender details

Quantity

6087

Category

LED TUBE LIGHTS 230V AC,40 WATTS

Bid Type

Two Packet Bid

Categories 123

COPPER WIRE LIGHTNING ARRESTER TELEMETRY NATURAL FUELS VOLTAGE METERS UNDERGROUND CABLE APFC PANEL FUSES DISPENSING TOOLS SWITCHES AND RELAY COPPER COIL RING COPPER CABLE POWER CABLE CABBING EQUIPMENTS AIR CYLINDERS TUBE AND FITTING ELECTROMECHANICAL MACHINERY ELECTRICAL PRODUCTS SWITCH YARD WIRING ASSEMBLY EYE WASH CUTTING CRIMPING AND PUNCHING TOOLS LED STREET LIGHT SCHOOL UNIFORMS HYDRAULIC TOOLS VIDEO OUTPUT DEVICE AMPS AGRICULTURE EQUIPMENT SWITCHING APPARATUS HARDWARE AND FASTENERS GEYSER JOINTING OF PIPE WELDING BRAZING AND SOLDERING SERVICES RIVETS TOOLS AND GENERAL MACHINERY STRIP DISCRETE COMPONENTS ELECTRICAL WIRE XLPE CABLE STEEL WIRE CIRCUIT PROTECTION DEVICE LIGHTENING PROTECTION DEVICE INSULATED WIRE TELECOM EQUIPMENT ROTARY SWITCHES WEARING PIECE INSULATORS SUPERVISORY CONTROL TIME RELAYS GI WIRE ELECTRICAL SUBSTATION VOLTAGE STABILISER IP PHONE IMPACT DRILL PANEL STEEL MILK CANS ELECTRONIC COMMUNICATION MEASURING AND TESTING INSTRUMENT IMPACT HAMMERS SOCKET POWER WIRE SUPPLY JAR DESICCATORS SEALING RING CLOCK TIMERS LAN HIGH TENSION PANEL LED LUMINARIES ATM LOCAL AREA NETWORK CABLING SWITCH GEAR INTERCOM VOLTMETER GOGGLES HOOK UP WIRES PVC CABLE GLUCOMETER CARDS SWITCH BOX ELECTRONIC PRODUCTS AND APPLIANCES GOLF EQUIPMENT GL WIRE LED LIGHT DESICCANTS WIRING HARNESS ELECTRICAL MEASURING AND TESTING EQUIPMENT ACID ANIMAL LABORATORY EQUIPMENT BELL CONTROLLER TUBE DISTILLED WATER BOX RODS SAFETY SWITCHES VOLT METER WIRE CABLE TIES PACKAGING TUBES AND LABEL BRONZE PIPE GALVANIZED WIRE HAMMER DRILL BARE CABLE WHITE WASH TRANSITION METALS SOLID AND GEL FUELS TOOL KIT CABLE LIMIT SWITCHES BATTERY FLEXIBLE PIPE BASE METALS SCREWS TIMER HYDRAULIC FIRST AID BOX PEB MASTIC CABLE THIMBLE SURGE PROTECTION DEVICE DISTRIBUTION TRANSFORMER POWER TOOLS MONITORING SYSTEM DATA WALL DISPLAY

Hindustan Petroleum Corporation Ltd has released a public tender for LED TUBE LIGHTS 230V AC, 40 WATTS, LED TUBE LIGHTS 230V AC, 22 WATTS, 110V DC INDICATION BULBS RED COLO in NALGONDA, TELANGANA. Quantity: 6087. Submission Deadline: 12-12-2025 16: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8662449.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 164 Items Sign in for GEM prices

#1

LED TUBE LIGHTS 230V AC,40 WATTS

LED TUBE LIGHTS 230V AC,40 WATTS

50 ea Delivery: 730 days
#2

LED TUBE LIGHTS 230V AC,22 WATTS

LED TUBE LIGHTS 230V AC,22 WATTS

30 ea Delivery: 730 days
#3

110V DC INDICATION BULBS RED COLOUR

110V DC INDICATION BULBS RED COLOUR

25 ea Delivery: 730 days
#4

230V AC INDICATION BULBS BLUE COLOUR

230V AC INDICATION BULBS BLUE COLOUR

25 ea Delivery: 730 days
#5

220V AC INDICATION BULBS RED COLOUR

220V AC INDICATION BULBS RED COLOUR

25 ea Delivery: 730 days
#6

220V AC INDICATION BULBS YELLOW COLOUR

220V AC INDICATION BULBS YELLOW COLOUR

25 ea Delivery: 730 days
#7

LED BULBS 230V AC,18 WATTS

LED BULBS 230V AC,18 WATTS

100 ea Delivery: 730 days
#8

LED BULBS 230V AC,9 WATTS

LED BULBS 230V AC,9 WATTS

50 ea Delivery: 730 days
#9

RTU Panel Lights 48V DC ,20 Watt LED

RTU Panel Lights 48V DC ,20 Watt LED

10 ea Delivery: 730 days
#10

RTU Panel Lights 230V AC ,20 Watt LED

RTU Panel Lights 230V AC ,20 Watt LED

10 ea Delivery: 730 days
#11

Emergency Lights 48V DC 60 Watt

Emergency Lights 48V DC 60 Watt

50 ea Delivery: 730 days
#12

Emergency Lights 110V DC 60 Watt

Emergency Lights 110V DC 60 Watt

50 ea Delivery: 730 days
#13

Supply of LED Flood Light for Highmast 200W

Supply of LED Flood Light for Highmast 200W

3 ea Delivery: 730 days
#14

INSULATION TAPES RED COLOUR

INSULATION TAPES RED COLOUR

50 rl Delivery: 730 days
#15

INSULATION TAPES BLUE COLOUR

INSULATION TAPES BLUE COLOUR

50 rl Delivery: 730 days
#16

INSULATION TAPES YELLOW COLOUR

INSULATION TAPES YELLOW COLOUR

50 rl Delivery: 730 days
#17

INSULATION TAPES GREEN COLOUR

INSULATION TAPES GREEN COLOUR

50 rl Delivery: 730 days
#18

INSULATION TAPES BLACK COLOUR

INSULATION TAPES BLACK COLOUR

50 rl Delivery: 730 days
#19

HT TAPES

HT TAPES

3 rl Delivery: 730 days
#20

200mm CABLE TIES 12 INCHLength

200mm CABLE TIES 12 INCHLength

10 ea Delivery: 730 days
#21

400mm CABLE TIES 12 INCHLength

400mm CABLE TIES 12 INCHLength

10 ea Delivery: 730 days
#22

1.5 SQ.MM GREEN EARTHING COPPER CABLE

1.5 SQ.MM GREEN EARTHING COPPER CABLE

1 bundle Delivery: 730 days
#23

2.5 SQ.MM GREEN EARTHING COPPER CABLE

2.5 SQ.MM GREEN EARTHING COPPER CABLE

1 bundle Delivery: 730 days
#24

35 SQ.MM GREEN EARTHING COPPER CABLE

35 SQ.MM GREEN EARTHING COPPER CABLE

10 meter Delivery: 730 days
#25

COPPER RED WIRE BUNDLE 1.5 SQ.MM

COPPER RED WIRE BUNDLE 1.5 SQ.MM

1 ea Delivery: 730 days
#26

Earthing Cable 10 sqmm Green wire

Earthing Cable 10 sqmm Green wire

50 mtr Delivery: 730 days
#27

BLACK COPPER WIRE BUNDLE 1.5 SQ.MM

BLACK COPPER WIRE BUNDLE 1.5 SQ.MM

1 ea Delivery: 730 days
#28

GI wire 6 sqmm light weight

GI wire 6 sqmm light weight

50 kg Delivery: 730 days
#29

RING TYPE COPPER LUGS 1.5 SQ.MM

RING TYPE COPPER LUGS 1.5 SQ.MM

50 ea Delivery: 730 days
#30

RING TYPE COPPER LUGS 2.5 SQ.MM

RING TYPE COPPER LUGS 2.5 SQ.MM

50 ea Delivery: 730 days
#31

RING TYPE COPPER LUGS 4 SQ.MM

RING TYPE COPPER LUGS 4 SQ.MM

50 ea Delivery: 730 days
#32

RING TYPE COPPER LUGS 6 SQ.MM

RING TYPE COPPER LUGS 6 SQ.MM

25 ea Delivery: 730 days
#33

RING TYPE COPPER LUGS 10 SQ.MM

RING TYPE COPPER LUGS 10 SQ.MM

25 ea Delivery: 730 days
#34

RING TYPE COPPER LUGS 35 SQ.MM

RING TYPE COPPER LUGS 35 SQ.MM

25 ea Delivery: 730 days
#35

RING TYPE COPPER LUGS 90 SQ.MM

RING TYPE COPPER LUGS 90 SQ.MM

15 ea Delivery: 730 days
#36

RING TYPE COPPER LUGS 120 SQ.MM

RING TYPE COPPER LUGS 120 SQ.MM

15 ea Delivery: 730 days
#37

U TYPE COPPER LUGS 1.5 SQ.MM

U TYPE COPPER LUGS 1.5 SQ.MM

50 ea Delivery: 730 days
#38

EARTH LEAKAGE CIRCUIT BREAKER ELCB Phase 2 POLE ,30 mA 40 A

EARTH LEAKAGE CIRCUIT BREAKER ELCB Phase 2 POLE ,30 mA 40 A

2 ea Delivery: 730 days
#39

EARTH LEAKAGE CIRCUIT BREAKER ELCB 4 POLE ,30 mA 40A

EARTH LEAKAGE CIRCUIT BREAKER ELCB 4 POLE ,30 mA 40A

2 ea Delivery: 730 days
#40

4 POLE ISOLATOR 63A , 415 V AC

4 POLE ISOLATOR 63A , 415 V AC

5 ea Delivery: 730 days
#41

4 POLE MCB 32A, 415 V AC

4 POLE MCB 32A, 415 V AC

5 ea Delivery: 730 days
#42

SINGLE POLE MCB 10A , 230 V AC

SINGLE POLE MCB 10A , 230 V AC

10 ea Delivery: 730 days
#43

SINGLE POLE MCB 16A ,230V AC

SINGLE POLE MCB 16A ,230V AC

10 ea Delivery: 730 days
#44

VCHF TYPE FUSES CYLINDRICAL,40A ,415 V AC

VCHF TYPE FUSES CYLINDRICAL,40A ,415 V AC

10 ea Delivery: 730 days
#45

VCHF TYPE FUSES CYLINDRICAL,25 AMP,415 V AC

VCHF TYPE FUSES CYLINDRICAL,25 AMP,415 V AC

10 ea Delivery: 730 days
#46

VCHF TYPE FUSES CYLINDRICAL,10 AMP,415V AC

VCHF TYPE FUSES CYLINDRICAL,10 AMP,415V AC

15 ea Delivery: 730 days
#47

NS TYPE FUSES 16 AMP, 415V AC

NS TYPE FUSES 16 AMP, 415V AC

15 ea Delivery: 730 days
#48

NS TYPE FUSES 25 AMP, 415 AV AC

NS TYPE FUSES 25 AMP, 415 AV AC

15 ea Delivery: 730 days
#49

NS TYPE FUSES 4 AMP , 415 AV AC

NS TYPE FUSES 4 AMP , 415 AV AC

15 ea Delivery: 730 days
#50

NS TYPE FUSES 6 AMP , 415 V AC

NS TYPE FUSES 6 AMP , 415 V AC

15 ea Delivery: 730 days
#51

HRC TYPE FUSES 6 AMP ,415V AC

HRC TYPE FUSES 6 AMP ,415V AC

10 ea Delivery: 730 days
#52

HRC TYPE FUSES 10 AMP ,415 V AC

HRC TYPE FUSES 10 AMP ,415 V AC

10 ea Delivery: 730 days
#53

HRC TYPE FUSES 16 AMP , 415 V AC

HRC TYPE FUSES 16 AMP , 415 V AC

10 ea Delivery: 730 days
#54

HRC TYPE FUSES 20 AMP , 415 V AC

HRC TYPE FUSES 20 AMP , 415 V AC

10 ea Delivery: 730 days
#55

HRC TYPE FUSES 32 AMP ,415 V AC

HRC TYPE FUSES 32 AMP ,415 V AC

15 ea Delivery: 730 days
#56

HRC TYPE FUSES 63 AMP

HRC TYPE FUSES 63 AMP

15 ea Delivery: 730 days
#57

HRC B2 SCREW TYPE FUSES 160 AMP , 415 V AC

HRC B2 SCREW TYPE FUSES 160 AMP , 415 V AC

5 ea Delivery: 730 days
#58

HRC A2 SCREW TYPE FUSES 10 AMP , 415V AC

HRC A2 SCREW TYPE FUSES 10 AMP , 415V AC

10 ea Delivery: 730 days
#59

GANG BOX WITH 2 NO 16 AMP ,230 V AC SOCKETS AND CONTROLLING SWITCHES

GANG BOX WITH 2 NO 16 AMP ,230 V AC SOCKETS AND CONTROLLING SWITCHES

15 ea Delivery: 730 days
#60

AC PLUG AND SOCKET TOPS 20A

AC PLUG AND SOCKET TOPS 20A

15 ea Delivery: 730 days
#61

16 AMP SOCKETS INCLUDING MCB

16 AMP SOCKETS INCLUDING MCB

25 ea Delivery: 730 days
#62

6 AMPS SWITCHES

6 AMPS SWITCHES

25 ea Delivery: 730 days
#63

FUSE BOXES 415V AC

FUSE BOXES 415V AC

2 ea Delivery: 730 days
#64

SUPPLY OF RCCBS 40A ,30 milli Amp 2 pole

SUPPLY OF RCCBS 40A ,30 milli Amp 2 pole

2 ea Delivery: 730 days
#65

DCDB ROTARY SWITCH 63A 3 POLE

DCDB ROTARY SWITCH 63A 3 POLE

1 ea Delivery: 730 days
#66

SPDs Series connected 48V DC

SPDs Series connected 48V DC

3 ea Delivery: 730 days
#67

AC Surge Protector Uc 230V AC , In 20kA , Imax 40kA, Up 1.5kV 4 Pole

AC Surge Protector Uc 230V AC , In 20kA , Imax 40kA, Up 1.5kV 4 Pole

5 ea Delivery: 730 days
#68

48V DC Surge Protector Un 48 Vdc , Uc 65Vdc ,In 15kA,Imax 30kA,Up 300V

48V DC Surge Protector Un 48 Vdc , Uc 65Vdc ,In 15kA,Imax 30kA,Up 300V

5 ea Delivery: 730 days
#69

MCCBs 100A 3 pole ,415V AC

MCCBs 100A 3 pole ,415V AC

2 ea Delivery: 730 days
#70

POP SCREWS 1 INCH

POP SCREWS 1 INCH

250 ea Delivery: 730 days
#71

POP SCREWS 1.5 INCH

POP SCREWS 1.5 INCH

250 ea Delivery: 730 days
#72

ALLUMINIUM SCREWS 0.5 INCH

ALLUMINIUM SCREWS 0.5 INCH

250 ea Delivery: 730 days
#73

ALLUMINIUM SCREWS 1 INCH

ALLUMINIUM SCREWS 1 INCH

250 ea Delivery: 730 days
#74

ALLUMINIUM SCREWS 1.5 INCH

ALLUMINIUM SCREWS 1.5 INCH

250 ea Delivery: 730 days
#75

ALLUMINIUM SCREW 2 INCH

ALLUMINIUM SCREW 2 INCH

250 ea Delivery: 730 days
#76

DISTILLED WATER FOR BATTERIES

DISTILLED WATER FOR BATTERIES

500 liter Delivery: 730 days
#77

ACID and SHOCK PROOF GLOVES SET

ACID and SHOCK PROOF GLOVES SET

5 ea Delivery: 730 days
#78

ACID PROOF GOGGLES SET

ACID PROOF GOGGLES SET

5 ea Delivery: 730 days
#79

HYDRO METERS

HYDRO METERS

2 ea Delivery: 730 days
#80

Portable eye wash 1 liter

Portable eye wash 1 liter

2 ea Delivery: 730 days
#81

ACID PROOF APRON

ACID PROOF APRON

5 ea Delivery: 730 days
#82

SILICA GEL BREATHER WITH SILICA GEL 2KG

SILICA GEL BREATHER WITH SILICA GEL 2KG

2 ea Delivery: 730 days
#83

SILICA GEL BREATHER WITH SILICA GEL 1KG

SILICA GEL BREATHER WITH SILICA GEL 1KG

2 ea Delivery: 730 days
#84

SILICA GEL BREATHER WITH SILICA GEL 0.5 KG

SILICA GEL BREATHER WITH SILICA GEL 0.5 KG

2 ea Delivery: 730 days
#85

SILICA GEL

SILICA GEL

50 kilogram Delivery: 730 days
#86

INSULATING SEALANT GUN BLACK COLOUR

INSULATING SEALANT GUN BLACK COLOUR

5 ea Delivery: 730 days
#87

SUPPORTING BASE INSULATORS

SUPPORTING BASE INSULATORS

50 ea Delivery: 730 days
#88

SUPPLY OF EARTH PIT BOARDS 1.5 X 1.0

SUPPLY OF EARTH PIT BOARDS 1.5 X 1.0

10 ea Delivery: 730 days
#89

EARTH PIT FUNNELS

EARTH PIT FUNNELS

20 ea Delivery: 730 days
#90

D Type Batteries 1.5V

D Type Batteries 1.5V

15 ea Delivery: 730 days
#91

9V Batteries Durocell

9V Batteries Durocell

15 ea Delivery: 730 days
#92

1.5 Volt AA Batteries

1.5 Volt AA Batteries

25 ea Delivery: 730 days
#93

33 KV HT Gloves

33 KV HT Gloves

2 ea Delivery: 730 days
#94

11 KV HT Gloves

11 KV HT Gloves

8 ea Delivery: 730 days
#95

MULTIMETER PROBES SET

MULTIMETER PROBES SET

5 ea Delivery: 730 days
#96

GI Earthing Strip 25 X 1.5 mm

GI Earthing Strip 25 X 1.5 mm

50 kg Delivery: 730 days
#97

GI Earthing Strip 25 X 3 mm

GI Earthing Strip 25 X 3 mm

50 kg Delivery: 730 days
#98

GI Earthing Strip 50 X 6 mm

GI Earthing Strip 50 X 6 mm

50 kg Delivery: 730 days
#99

L and Key Set in mm

L and Key Set in mm

1 ea Delivery: 730 days
#100

L and Key set in inches

L and Key set in inches

1 ea Delivery: 730 days
#101

White Wash for Neutralisation Pit

White Wash for Neutralisation Pit

100 kilogram Delivery: 730 days
#102

Charcoal for Earthpits

Charcoal for Earthpits

50 kilogram Delivery: 730 days
#103

Crystal Salt for Earthpit

Crystal Salt for Earthpit

100 kilogram Delivery: 730 days
#104

WD40 200ml

WD40 200ml

10 ea Delivery: 730 days
#105

Cable glands 21 mm FLP

Cable glands 21 mm FLP

10 ea Delivery: 730 days
#106

Cable glands 28 mm FLP

Cable glands 28 mm FLP

10 ea Delivery: 730 days
#107

Cable glands 17 mm FLP

Cable glands 17 mm FLP

10 ea Delivery: 730 days
#108

Cable glands 32 mm FLP

Cable glands 32 mm FLP

10 ea Delivery: 730 days
#109

ANALOG TIMER ,230V AC ,50 Hz

ANALOG TIMER ,230V AC ,50 Hz

5 ea Delivery: 730 days
#110

EXHAUST FANS 4 INCH 230V AC

EXHAUST FANS 4 INCH 230V AC

10 ea Delivery: 730 days
#111

EXHAUST FANS 6 INCH 230V AC

EXHAUST FANS 6 INCH 230V AC

10 ea Delivery: 730 days
#112

INSULATION MATS 2 MM THICKNESS

INSULATION MATS 2 MM THICKNESS

15 sm Delivery: 730 days
#113

INSULATION MATS 2.5 MM THICKNESS

INSULATION MATS 2.5 MM THICKNESS

10 sm Delivery: 730 days
#114

INSULATION MATS 3 MM THICKNESS

INSULATION MATS 3 MM THICKNESS

5 sm Delivery: 730 days
#115

LAN CABLE

LAN CABLE

600 meter Delivery: 730 days
#116

LAN TO OFC CONVERTERS Multimode

LAN TO OFC CONVERTERS Multimode

5 ea Delivery: 730 days
#117

48V DC TO 12V DC CONVERTERS

48V DC TO 12V DC CONVERTERS

7 ea Delivery: 730 days
#118

TSV locks 38mm

TSV locks 38mm

20 ea Delivery: 730 days
#119

Replacement of Non FLP with FLP EXHAUST FANS 300mm ,230V AC

Replacement of Non FLP with FLP EXHAUST FANS 300mm ,230V AC

12 ea Delivery: 730 days
#120

Zone Defenders Power SPD for AC Surge Protection In 10kA, MCOV 320, Voltage Protection Rating L N 1200V, N G equals 1000V,L G 1200 VV

Zone Defenders Power SPD for AC Surge Protection In 10kA, MCOV 320, Voltage Protection Rating L N 1200V, N G equals 1000V,L G 1200 VV

2 ea Delivery: 730 days
#121

230V AC TO 5V DC Adopters FOR IP PHONE

230V AC TO 5V DC Adopters FOR IP PHONE

10 ea Delivery: 730 days
#122

230V AC TO 5V DC CONVERTERS FOR VIDEO WALL CONVERTERS Adopters Input 240V 50Hz 0.6A Output 5V DC 2.6A ,Switch mode Power Supply

230V AC TO 5V DC CONVERTERS FOR VIDEO WALL CONVERTERS Adopters Input 240V 50Hz 0.6A Output 5V DC 2.6A ,Switch mode Power Supply

3 ea Delivery: 730 days
#123

OFC Patch Cords 5 METERS

OFC Patch Cords 5 METERS

15 ea Delivery: 730 days
#124

OFC Cleaner Bottles 50ml

OFC Cleaner Bottles 50ml

5 ea Delivery: 730 days
#125

Cable Identification Tags 4 inch length

Cable Identification Tags 4 inch length

250 ea Delivery: 730 days
#126

3 core 2.5 Sqmm PVC cable

3 core 2.5 Sqmm PVC cable

25 meter Delivery: 730 days
#127

Door Limit Switches

Door Limit Switches

20 ea Delivery: 730 days
#128

Humidity Sensors 24V DC ,4 20 mA Output, 0 100percent rh Range

Humidity Sensors 24V DC ,4 20 mA Output, 0 100percent rh Range

2 ea Delivery: 730 days
#129

60W LED FLP Lights in Battery room

60W LED FLP Lights in Battery room

7 ea Delivery: 730 days
#130

Intercom Land line Telephones

Intercom Land line Telephones

5 ea Delivery: 730 days
#131

Electric HT LT Discharging rods

Electric HT LT Discharging rods

1 ea Delivery: 730 days
#132

FLP 90W Drivers

FLP 90W Drivers

10 ea Delivery: 730 days
#133

FLP 90W LED Cards

FLP 90W LED Cards

10 ea Delivery: 730 days
#134

Non FLP 90W Drivers

Non FLP 90W Drivers

10 ea Delivery: 730 days
#135

Non FLP 90W LED Cards

Non FLP 90W LED Cards

10 ea Delivery: 730 days
#136

SFU Switch Knobs

SFU Switch Knobs

10 ea Delivery: 730 days
#137

1INCH Rivets

1INCH Rivets

150 ea Delivery: 730 days
#138

1.5INCH Rivets

1.5INCH Rivets

150 ea Delivery: 730 days
#139

6mm Hammer Drill bits

6mm Hammer Drill bits

5 ea Delivery: 730 days
#140

8mm Hammer Drill bits

8mm Hammer Drill bits

5 ea Delivery: 730 days
#141

10mm Hammer Drill bits

10mm Hammer Drill bits

5 ea Delivery: 730 days
#142

6mm Iron Ms Drill bits

6mm Iron Ms Drill bits

5 ea Delivery: 730 days
#143

8mm Iron Ms Drill bits

8mm Iron Ms Drill bits

5 ea Delivery: 730 days
#144

10mm Iron Ms Drill bits

10mm Iron Ms Drill bits

5 ea Delivery: 730 days
#145

12mm Iron Ms Drill bits

12mm Iron Ms Drill bits

5 ea Delivery: 730 days
#146

Silver Paint

Silver Paint

50 ltr Delivery: 730 days
#147

40mm Locks

40mm Locks

20 ea Delivery: 730 days
#148

60mm Locks

60mm Locks

15 ea Delivery: 730 days
#149

D Spanner set Tapparia upto 32 mm

D Spanner set Tapparia upto 32 mm

1 ea Delivery: 730 days
#150

Soldering Rod

Soldering Rod

1 set Delivery: 730 days
#151

32A ,415 V 4 Pole MCB

32A ,415 V 4 Pole MCB

2 ea Delivery: 730 days
#152

1INCH Flexible pipe

1INCH Flexible pipe

50 meters Delivery: 730 days
#153

16A Switch ,

16A Switch ,

10 ea Delivery: 730 days
#154

16A Socket

16A Socket

10 ea Delivery: 730 days
#155

4 Way FLP Junction Boxes

4 Way FLP Junction Boxes

5 ea Delivery: 730 days
#156

CRC Cleaner Bottles of 500ml

CRC Cleaner Bottles of 500ml

10 ea Delivery: 730 days
#157

Hydraulic Crimping Tool 0 to 250

Hydraulic Crimping Tool 0 to 250

1 ea Delivery: 730 days
#158

8mmx 50mm SS Nut Bolt and DWasher

8mmx 50mm SS Nut Bolt and DWasher

100 ea Delivery: 730 days
#159

6mmx 50mm SS Nut Bolt and Dwasher

6mmx 50mm SS Nut Bolt and Dwasher

100 ea Delivery: 730 days
#160

10mmx 50mm SS Nut Bolt and Dwasher

10mmx 50mm SS Nut Bolt and Dwasher

100 ea Delivery: 730 days
#161

AC Voltmeter 0 to 300 V Analog

AC Voltmeter 0 to 300 V Analog

20 ea Delivery: 730 days
#162

AC Voltmeter 0 to 415 V Analog

AC Voltmeter 0 to 415 V Analog

5 ea Delivery: 730 days
#163

230V AC Contactor

230V AC Contactor

7 ea Delivery: 730 days
#164

Ethernet Surge Protection Device

Ethernet Surge Protection Device

10 ea Delivery: 730 days

Technical Results

S.No Seller Item Date Status
1
B RAJASHEKAR ENGINEERS & CONTRACTORS   Under PMA
-12-12-2025 14:42:01
2
HARSHA CONTRACTORS   Under PMA
-09-12-2025 21:22:24
3
MANAS ELECTRIC CO   Under PMA
-12-12-2025 12:52:50
4
MUNDHRA LIGHTING CENTRE   Under PMA
-10-12-2025 19:34:31

Financial Results

Rank Seller Price Item
L1
HARSHA CONTRACTORS(MSE,MII)( MSE Social Category:OBC )    Under PMA
Item Categories : LED TUBE LIGHTS 230V AC,40 WATTS,LED TUBE LIGHTS 230V AC,22 WATTS,110V DC INDICATION BULBS RED COLO
L2
B RAJASHEKAR ENGINEERS & CONTRACTORS (MSE,MII)( MSE Social Category:OBC )    Under PMA
Item Categories : LED TUBE LIGHTS 230V AC,40 WATTS,LED TUBE LIGHTS 230V AC,22 WATTS,110V DC INDICATION BULBS RED COLO
L3
MUNDHRA LIGHTING CENTRE (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : LED TUBE LIGHTS 230V AC,40 WATTS,LED TUBE LIGHTS 230V AC,22 WATTS,110V DC INDICATION BULBS RED COLO
L4
MANAS ELECTRIC CO (MII)( MSE Social Category:OBC )    Under PMA
Item Categories : LED TUBE LIGHTS 230V AC,40 WATTS,LED TUBE LIGHTS 230V AC,22 WATTS,110V DC INDICATION BULBS RED COLO

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.