TenderDekho Logo
Active GEM

Indian Army SRINAGAR Water Separator and 15KVA Adopter Lock Supply Tender 2026

Bid Publish Date

14-Oct-2026, 7:28 pm

Bid End Date

24-Oct-2026, 8:00 pm

Progress

Issue14-Oct-2026, 7:28 pm
AwardPending

Key Highlights

  • • Defense procurement of 15KVA spares including water separator, fuel pipe, spark plug, and related assemblies
  • • OEM warranty certificates required at delivery; 1-year warranty post-acceptance
  • • Advance sample approval mandatory within 5 days; modifications issued within 5 days
  • • Service centers and installation/training capability must be established in INDIA

Tender Overview

Indian Army invites bids for a broad category of 15KVA-related components including water separator, adopter lock, fuel motor assembly, battery terminal, oil pressure sensor, carburetor assembly, spark plug, packing kit, starter assembly recoil, fuel pipe, fuse, and related items for installation and maintenance. Location: Srinagar, Jammu & Kashmir - 190001. Scope: Supply of Goods only, covering 15 distinct items as per BOQ. The contract emphasizes advance sample approval within 5 days of award, with modification lists issued within 5 days of sample submission. The tender notes a 1-year warranty from final acceptance/commissioning and requires OEM warranty certifications at delivery. Turnover criteria and installation/training support are specified through standard procurement terms. Unique emphasis on after-sales service presence across India and established service centers near consignee destinations. This procurement targets defense logistics optimization, with a multi-item spares kit approach, and ties quality to adherence to contract specifications as approved by the Buyer. Hard delivery milestones will hinge on sample approval timelines and any Buyer delays.

Technical Specifications & Requirements

  • Scope of supply: Only supply of goods; no design work.
  • Warranty: 1 year from final acceptance or after installation/testing; OEM warranty certificates required at delivery.
  • Service capability: Must have established Installation, Commissioning, Training, Troubleshooting and Maintenance network in India; list service centers near consignee locations.
  • Sample process: Submit 1 sample within 5 days of award; Buyer to approve or request modifications within 5 days; bulk supply must align with approved sample; delays in buyer approval may extend delivery period without LD.
  • Documents required: PAN, GSTIN, cancelled cheque, EFT mandate; turnover evidence via audited statements or CA certificate for last 3 years; vendor code creation documents.

Terms, Conditions & Eligibility

  • EMD/financials: Not explicitly stated in the terms; turnover must meet the bidder’s stated three-year average financial turnover.
  • Turnover criteria: Minimum average annual turnover for last 3 years as specified in bid document; provide audited balance sheets or CA certificate.
  • Delivery terms: Delivery timeline contingent on sample approval; no LD described for buyer delays in sample approval.
  • Payment terms: Not specified in buyer terms; payment schedule to be confirmed during bid negotiations.
  • Documentation: Submit PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorizations if required; evidence of after-sales network.

Key Specifications

  • Product category: 15KVA spare parts and accessories list (water separator, adopter lock, fuel motor assembly, battery terminal, oil pressure sensor, carburetor assembly, spark plug, packing kit, starter assembly recoil/85, fuel pipe, fuse, etc.)

  • Delivery: goods-only supply; sample approval within 5 days of contract award

  • Warranty: 1-year OEM warranty; post-installation warranty applicable

  • Service capability: India-wide installation, commissioning, training, troubleshooting, maintenance with local centers

  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; turnover evidence for last 3 years

Terms & Conditions

  • Advance sample approval required within 5 days of award with a 5-day modification cycle

  • 1-year OEM warranty with service centers established in INDIA

  • Turnover proof for last 3 years and standard vendor-code documentation

Important Clauses

Payment Terms

Payment terms to be confirmed; current terms do not specify schedule or milestones in provided data

Delivery Schedule

Delivery tied to approved advance sample; potential extension if Buyer delays approval, with no LD for Buyer delay

Penalties/Liquidated Damages

No LD details provided in available terms; contract may include standard performance-related penalties per final agreement

Bidder Eligibility

  • Last 3-year average annual turnover meeting bidder's stated criterion with audited statements or CA certificate

  • Demonstrated installation, commissioning, training and maintenance capability within INDIA

  • Compliance with PAN, GSTIN, EFT mandate and vendor code creation requirements

Advertisement

Tender Data

Bid Details

Quantity

71

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

WATER SEPRATOR 15 KVA , ADOPTER LOCK 15KV , FUEL MOTOR ASSY 15KVA , BATTER TERMINAL 15KVA , EING OIL PRESSURE SENSOR 15KVA , CARBURATOR ASSY 6.5KVA , SPRAK PLUG 6.5KVA , PACKING KIT 6.5KVA , STARTER ASSY RECOIL 6.5KVA , FUEL PIPE 6.5KVA , FUSE 1AMP , SPARK PLUG 7KVA , STARTER ASSY RECOIL 7KVA , FUEL PIPE 7KVA , FUSE 3AMP

Pre-Bid & Qualification

Pre-Bid Date

16-10-2026 09:00:00

Pre-Bid Venue

753 EW WKSP COY BB CANTT SRINAGAR MOB 8899355756

Delivery Details

Max Delivery Days

21

Delivery Locations

1

Delivery Cities

Srinagar

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SrinagarSrinagar--821-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10037325.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

WATER SEPRATOR 15 KVA

WATER SEPRATOR 15 KVA

8 nos Delivery: 21 days
#2

ADOPTER LOCK 15KV

ADOPTER LOCK 15KV

8 nos Delivery: 21 days
#3

FUEL MOTOR ASSY 15KVA

FUEL MOTOR ASSY 15KVA

3 nos Delivery: 21 days
#4

BATTER TERMINAL 15KVA

BATTER TERMINAL 15KVA

20 nos Delivery: 21 days
#5

EING OIL PRESSURE SENSOR 15KVA

EING OIL PRESSURE SENSOR 15KVA

2 nos Delivery: 21 days
#6

CARBURATOR ASSY 6.5KVA

CARBURATOR ASSY 6.5KVA

1 nos Delivery: 21 days
#7

SPRAK PLUG 6.5KVA

SPRAK PLUG 6.5KVA

7 nos Delivery: 21 days
#8

PACKING KIT 6.5KVA

PACKING KIT 6.5KVA

1 nos Delivery: 21 days
#9

STARTER ASSY RECOIL 6.5KVA

STARTER ASSY RECOIL 6.5KVA

3 nos Delivery: 21 days
#10

FUEL PIPE 6.5KVA

FUEL PIPE 6.5KVA

1 nos Delivery: 21 days
#11

FUSE 1AMP

FUSE 1AMP

4 nos Delivery: 21 days
#12

SPARK PLUG 7KVA

SPARK PLUG 7KVA

4 nos Delivery: 21 days
#13

STARTER ASSY RECOIL 7KVA

STARTER ASSY RECOIL 7KVA

2 nos Delivery: 21 days
#14

FUEL PIPE 7KVA

FUEL PIPE 7KVA

3 nos Delivery: 21 days
#15

FUSE 3AMP

FUSE 3AMP

4 nos Delivery: 21 days
Advertisement

Categories 14

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by Bank

5

Audited Balance Sheets or CA/Cost Accountant turnover certificate for last 3 years

6

Vendor code creation documents

7

OEM authorizations or certificates (if applicable)

8

Proof of service network and center locations

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for the water separator 15KVA spares tender in Srinagar?

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate, along with turnover evidence for the last 3 years. Provide OEM authorizations if required, and demonstrate installation, commissioning, and maintenance capability across India. Sample must be approved within 5 days of award, and warranty applicable for 1 year post-acceptance.

What documents are required for Indian Army spares tender in Srinagar?

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, turnover certificates (audited statements or CA certificate for last 3 years), OEM authorization, and proof of service centers; ensure vendor code creation documents are included with the bid.

What are the technical expectations for 15KVA spare parts procurement?

Technical expectations specify supply of goods only; maintain 1-year OEM warranty; ensure samples are approved within 5 days of award and align bulk supply with approved sample; warranty and after-sales capability across India are critical.

When is the sample approval deadline for the 15KVA spares tender?

Advance sample must be submitted within 5 days of contract award; Buyer will approve or issue modification lists within 5 days; delay in approval extends the delivery period without liquidated damages as per terms.

What is the warranty period for the supplied 15KVA components?

A 1-year warranty from the date of final acceptance or after completion of installation/commissioning, with OEM warranty certificates required at delivery; vendor must demonstrate post-warranty service capabilities in India.

What turnover documentation proves eligibility for this defense tender?

Provide the minimum average annual turnover for the last 3 years ending 31 March, supported by audited balance sheets or CA certificate; if the bidder is under 3 years old, turnover of completed years post-constitution is considered.

What fees or deposits are required to participate in this Srinagar tender?

Terms require standard vendor documents with vendor code creation (PAN, GSTIN, cancelled cheque, EFT mandate); EMD amount is not specified in the available terms and will be defined in the formal bid document.

How are delivery delays due to buyer sample approval handled in this tender?

Delivery period may be refixed without LD for the period of buyer sample approval delay; bulk supply must follow the approved sample with any communicated modifications.

Advertisement