Progress
Quantity
66
Category
PTZ Camera
Bid Type
Two Packet Bid
Public procurement opportunity for Inland Waterways Authority Of India (iwai) PTZ Camera, Bullet Camera, 8 CH NVR, HDD, Router, Switch, Rack, Cat6 Wire, Monitor, UPS, Installation in KAMRUP, ASSAM. Quantity: 66 issued by. Submission Deadline: 17-07-2026 15: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PTZ Camera , Bullet Camera , 8 CH NVR , HDD , Router , Switch , Rack , Cat6 Wire , Monitor , UPS , Installation
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
PTZ Camera
2 MP PTZ Camera with 100 Mtr IR and 25X Zoom
Bullet Camera
4 MP 50 Mtr IR Bullet Camera
8 CH NVR
8 Ch NVR with 2 Sata Port
HDD
6 TB Surveillance HDD
Router
SIM Router for Internet with 1 Year of Internet Pack ( IoT SIM Card)
Switch
8 Port POE Switch
Rack
Rack with PDU
Cat6 Wire
Cat6 Cable (100 Mtr Roll)
Monitor
19 inch Monitor with Mounting kit
UPS
1 KVA Online UPS with 30 Mtr Backup
Installation
Installation of NVR Switch , rack UPS with all acessories and iron soldering work
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | PTZ Camera | 2 MP PTZ Camera with 100 Mtr IR and 25X Zoom | 6 | pieces | [email protected] | 10 | |
| 2 | Bullet Camera | 4 MP 50 Mtr IR Bullet Camera | 6 | pieces | [email protected] | 15 | |
| 3 | 8 CH NVR | 8 Ch NVR with 2 Sata Port | 6 | pieces | [email protected] | 10 | |
| 4 | HDD | 6 TB Surveillance HDD | 6 | pieces | [email protected] | 10 | |
| 5 | Router | SIM Router for Internet with 1 Year of Internet Pack ( IoT SIM Card) | 6 | pieces | [email protected] | 10 | |
| 6 | Switch | 8 Port POE Switch | 6 | pieces | [email protected] | 15 | |
| 7 | Rack | Rack with PDU | 6 | pieces | [email protected] | 10 | |
| 8 | Cat6 Wire | Cat6 Cable (100 Mtr Roll) | 6 | pieces | [email protected] | 10 | |
| 9 | Monitor | 19 inch Monitor with Mounting kit | 6 | pieces | [email protected] | 10 | |
| 10 | UPS | 1 KVA Online UPS with 30 Mtr Backup | 6 | pieces | [email protected] | 10 | |
| 11 | Installation | Installation of NVR Switch , rack UPS with all acessories and iron soldering work | 6 | job | [email protected] | 10 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
17-Jul-2026, 3:00 pm
Opening Date
17-Jul-2026, 3:30 pm
Extended Deadline
29-Jun-2026, 12:00 pm
Opening Date
29-Jun-2026, 12:30 pm
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS