TenderDekho Logo
Active GEM

Urban Development And Housing Department Bihar Tubular Street Light Poles Tender 2026 ISO 9001 9001 Light Poles

Bid Publish Date

05-Oct-2026, 2:25 pm

Bid End Date

15-Oct-2026, 3:00 pm

EMD

₹50,000

Location

Progress

Issue05-Oct-2026, 2:25 pm
AwardPending

Tender Overview

Urban Development And Housing Department Bihar invites bids for Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3). The scope includes supply, installation, testing, commissioning, and operator training with any required statutory clearances. The EMD is ₹50,000. The term allows a 25% quantity variation during contractual execution. The project targets urban lighting infrastructure enhancements within Bihar, leveraging certified suppliers capable of meeting delivery timelines and ISO 9001 standards. This tender emphasizes flexibility in order quantity and adherence to quality standards for municipal street lighting assets.

Technical Specifications & Requirements

  • Product category: Tubular street light poles (V2), Q3 configuration, lighting pole hardware.
  • Scope: Supply, installation, testing, commissioning, and operator training; includes statutory clearances if required.
  • Standards/quality: ISO 9001 certification required for bidder or OEM.
  • Experience evidence: Past project proof accepted via contract copies, client execution certificates, or third-party notes.
  • Delivery/installation: Delivery schedule linked to original delivery order with option to extend as per 25% quantity clause.
  • Financial/turnover: Minimum average annual turnover criteria described in bid document; audited balance sheets or CA certificate acceptable.
  • GST: Bid quoting must consider applicable GST; reimbursement as per actuals up to quoted rate.

Terms, Conditions & Eligibility

  • EMD: ₹50,000.
  • Quantity variation: +/− 25% during contract; extension rules defined by formula with minimum 30 days.
  • Certification: ISO 9001; bidder or OEM must hold it.
  • Scope of supply: Price must include supply, installation, testing, commissioning, operator training, and statutory clearances if any.
  • Turnover: 3-year average turnover requirement; documented via audited statements or CA certificate.
  • Past experience: Acceptable proofs include contract copies with invoices and client execution certificates.
  • GST: Supplier responsible for GST applicability; reimbursement as per actuals or quoted rate.

Key Specifications

  • Product: Tubular Street Light Poles (V2) (Q3)

  • EMD: ₹50,000

  • Scope: Supply, Installation, Testing & Commissioning, Operator Training

  • Standards: ISO 9001 certification required

  • Delivery: Extended delivery period possible with 25% quantity variation

  • Experience: Documentation via contract copies or client certificates

Terms & Conditions

  • EMD of ₹50,000 required with bid submission

  • Bidder must have ISO 9001 certification (bidder or OEM)

  • Scope includes installation, testing, commissioning and training

  • Quantity may increase/decrease by up to 25% during contract

  • Turnover evidence: 3-year average turnover as per bid document

Important Clauses

Payment Terms

GST payable by bidder; reimbursement as actuals or at quoted rate; payment terms not specified beyond GST handling

Delivery Schedule

Delivery period begins after original delivery order; extended time calculated as (increased quantity ÷ original quantity) × original delivery period with a minimum 30 days

Penalties/Liquidated Damages

Not specified; LD/penalties may be implied under standard contract terms linked to delivery delays

Bidder Eligibility

  • ISO 9001 certification holder (bidder or OEM)

  • Minimum average turnover as specified in bid document (3-year period)

  • Ability to supply, install, test, and commission street lighting poles with operator training

Advertisement

Tender Data

Bid Details

Quantity

100

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

25

OEM Avg. Turnover

50

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3)

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Munger

Delivery Pincodes

811214

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Prem Shankar811214,At - Albert Road, East Colony, JamalpurMungerBihar81121410030-

Authority Records

URBAN DEVELOPMENT AND HOUSING DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-9983521.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Nagar Parishad Jamalpur

Grievance Contact

[email protected]

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for last 3 years or CA certificate indicating turnover

4

ISO 9001 certification (bidder or OEM)

5

Past project experience documents (contracts, invoices, client certificates)

6

Technical bid documents and OEM authorization (if applicable)

7

EMD payment proof (₹50,000)

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for tubular street light poles tender in Bihar 2026

Bidders should ensure ISO 9001 certification (bidder or OEM), prepare GST details, and submit audited turnover for last 3 years, EMD ₹50,000, and past project proofs. The bid covers supply, installation, testing, commissioning, and operator training with 25% quantity variation rights.

What documents are required for Bihar street light pole procurement

Required documents include GST certificate, PAN, audited financials or CA turnover certificate, ISO 9001 certificate, past experience proofs (contracts/invoices/client certificates), OEM authorization if applicable, technical bid details, and EMD receipt for ₹50,000.

What standards and certifications are demanded for poles bidding

Bid must comply with ISO 9001 certification for bidder or OEM. No ISI/IS standards are specified in this tender data; however, ISO 9001 is required as a minimum quality management standard.

What is the delivery flexibility for quantity under the contract

The purchaser may adjust quantity by ±25% at contract placement and during currency. Extended delivery time uses the formula (increased quantity ÷ original quantity) × original period, with a minimum 30 days.

What are the payment and GST terms for the Bihar tender

GST is to be paid by the bidder; reimbursement will be as per actuals or the quoted rate, whichever is lower. Payment terms beyond GST handling are not detailed in the data; bidders should confirm with the procuring entity.

What past experience proofs are acceptable for eligibility

Acceptable proofs include contract copies with invoices and bidder self-certification, client execution certificates, or third-party release notes. These documents establish project experience for the street lighting poles procurement.

When does the bid evaluation consider turnover figures

Evaluation considers the average turnover for the last three financial years ending 31st March of the previous year, using audited balance sheets or CA-certified turnover certificates submitted with the bid.

What is the scope of supply for this poles tender

The scope includes supply, installation, testing, commissioning, operator training, and any required statutory clearances. Bid prices must include all cost components for the complete lifecycle delivery.