Progress
Organization: Indian Army, Department Of Military Affairs. Procurement focuses on multiple electronic sensors and gauges including O2 sensor, RPM pickup sensor, magnetic sensor, and pressure gauge, with a listed 5 BOQ items. Located in Alwar, Rajasthan 301001. Estimated value and EMD are not disclosed in the available data. The tender emphasizes flexible quantity options up to 25% during award and currency, and a delivery timeline linked to order dates. A key differentiator is the option clause allowing adjusted quantities at contracted rates, plus required service presence within the state. This tender requires service-provider documentation and adherence to Bastion terms. Keywords: tender in Alwar, Rajasthan government procurement, SBI-style equipment procurement, military sensor components, 2026 opportunity.
Product categories: O2 sensor, RPM pickup sensor, magnetic sensor, pressure gauge, thinner
BOQ: 5 items; exact quantities not disclosed
Compliance: Material Test Certificate to be submitted with delivery
Delivery framework: option to increase quantity up to 25% during contract; delivery period extendable with minimum 30 days
Service presence: office of service provider within consignee state required
Option clause allows 25% quantity variation during award and currency
EMD and submission must align with vendor code creation requirements
Material Test Certificate and End User Certificate handling as per buyer formats
Demurrage penalties: 0.5% daily; disposal after 1 month if unlifted
GST treatment at actuals or applicable rate; no explicit advance terms stated
Delivery period begins after last date of original order; extension based on increased quantity with minimum 30 days
Demurrage 0.5% of total contract value per day for unlifted items; destruction after 1 month if not lifted
Must submit PAN, GSTIN, cancelled cheque, EFT mandate
Must have a service office within the consignee state
Material Test Certificate to accompany supply
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ADITYA ENTERPRISES Under PMA | - | 16-08-2026 18:51:10 | |
| 2 | BALAJI ASSOCIATES Under PMA | - | 16-08-2026 19:09:48 | |
| 3 | KRISHNA TRADING CO. Under PMA | - | 16-08-2026 20:06:53 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ADITYA ENTERPRISES(MSE)( MSE Social Category:General ) Under PMA | Item Categories : ELEC VOLTAGE REGULATOR,O2 SENSOR,RPM PICKUP SENSOR MAGNETIC SENSOR,PRESSURE GAUGE,THINNER | |
| L2 | KRISHNA TRADING CO. (MSE)( MSE Social Category:General ) Under PMA | Item Categories : ELEC VOLTAGE REGULATOR,O2 SENSOR,RPM PICKUP SENSOR MAGNETIC SENSOR,PRESSURE GAUGE,THINNER | |
| L3 | BALAJI ASSOCIATES (MSE)( MSE Social Category:General ) Under PMA | Item Categories : ELEC VOLTAGE REGULATOR,O2 SENSOR,RPM PICKUP SENSOR MAGNETIC SENSOR,PRESSURE GAUGE,THINNER |
Quantity
10
Category
ELEC VOLTAGE REGULATOR
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ELEC VOLTAGE REGULATOR , O2 SENSOR , RPM PICKUP SENSOR MAGNETIC SENSOR , PRESSURE GAUGE , THINNER
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Alwar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Alwar | Alwar | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
ELEC VOLTAGE REGULATOR
ELEC VOLTAGE REGULATOR
O2 SENSOR
O2 SENSOR
RPM PICKUP SENSOR MAGNETIC SENSOR
RPM PICKUP SENSOR MAGNETIC SENSOR
PRESSURE GAUGE
PRESSURE GAUGE
THINNER
THINNER
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | ELEC VOLTAGE REGULATOR | ELEC VOLTAGE REGULATOR | 1 | nos | 820wkspoffr | 30 | |
| 2 | O2 SENSOR | O2 SENSOR | 1 | nos | 820wkspoffr | 30 | |
| 3 | RPM PICKUP SENSOR MAGNETIC SENSOR | RPM PICKUP SENSOR MAGNETIC SENSOR | 1 | nos | 820wkspoffr | 30 | |
| 4 | PRESSURE GAUGE | PRESSURE GAUGE | 1 | nos | 820wkspoffr | 30 | |
| 5 | THINNER | THINNER | 6 | ltr | 820wkspoffr | 30 |
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by Bank
End User Certificate (buyer format, if requested)
Material Test Certificate with supply
Proof of service office in state of consignee
Any certificates/documentation requested in bid/ATC/Corrigendum
Key insights about RAJASTHAN tender market
Bidders must register, submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide Material Test Certificate with supply and ensure an in-state service office. The option clause allows quantity adjustment up to 25%, and delivery timing starts after the original delivery date. GST handling follows actual or applicable rates.
Required documents include PANCard, GSTIN, CancelledCheque, EFT Mandate, End User Certificate if applicable, Material Test Certificate, and proof of local service presence; submit these along with technical bid per ATC and corrigenda.
Eligibility includes valid GST registration, PAN, bank EFT mandate, and demonstrable ability to supply sensors with Material Test Certificate. Office in-state of consignee is required; End User Certificate processing may be requested by the buyer.
Delivery timing may extend based on increased quantity: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Original delivery period may be extended up to the total original duration.
Demurrage charges are 0.5% of total contract value per day for items not lifted within 48 hours, and if not lifted within a month, items are destroyed with no claim admitted.
A Material Test Certificate must accompany the supply; tests are conducted by the buyer’s lab and results are the sole criteria for acceptance.
GST reimbursement is based on actuals or applicable rates, whichever is lower, with the constraint that bidders must determine GST applicability themselves; the tender clarifies no responsibility for GST calculation.
Specific IS/ISO standards are not listed in the data; bidders should ensure general compliance and be prepared to supply Material Test Certificates and OEM documentation as required.