TenderDekho Logo
Closed GEM

Contract Bidding Open For Fume Extractor in BANGALORE, KARNATAKA

Bid Publish Date

30-Dec-2024, 2:09 pm

Bid End Date

09-Jan-2025, 3:00 pm

Generate Docs

Progress

Issue30-Dec-2024, 2:09 pm
Technical01-Sep-2025, 12:10 pm
Financial
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

4

Bid Type

Two Packet Bid

Categories 4

Public procurement opportunity for Bharat Electronics Limited (bel) Fume Extractor in BANGALORE, KARNATAKA. Quantity: 4 issued by. Submission Deadline: 09-01-2025 15: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Fume Extractor

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENTBHARAT ELECTRONICS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-7313458.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC)

4

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

10-Jan-2025

Extended Deadline

13-Jan-2025, 9:00 am

Opening Date

13-Jan-2025, 9:30 am

Technical Results

S.No Seller Item Date Status
1
ADVANCE TECH SERVICES PRIVATE LIMITED   Under PMA
Make : TOKii Model : TOKii-1DFAD Title : Fume Extractor09-01-2025 12:10:06
2
ELECTROWING TECHNOLOGIES PRIVATE LIMITED   Under PMA
Make : WELLER Model : ZERO SMOG TL KIT1 WF FUNNEL 230V F/G Title : Fume Extractor08-01-2025 16:08:24
3
k tech solutions   Under PMA
Make : SEHA Model : SINGLE DUCT FUME EXTRACTOR SE-SDFA-AS Title : Fume Extractor12-01-2025 09:07:27

Financial Results

Rank Seller Price Item
L1
ADVANCE TECH SERVICES PRIVATE LIMITED(MII)   Under PMA
Item Categories : Fume Extractor
L2
k tech solutions (MII)   Under PMA
Item Categories : Fume Extractor
L3
ELECTROWING TECHNOLOGIES PRIVATE LIMITED (MII)   Under PMA
Item Categories : Fume Extractor

Frequently Asked Questions

Key insights about KARNATAKA tender market

What are the eligibility requirements for this tender?

The eligibility requirements include being a registered entity capable of manufacturing or supplying fume extractors, with suitable experience in similar projects. Documentation proving qualifications must be submitted, including any claims for exemption from the standard experience criteria.

What certificates are required for this tender?

Bidders need to present an OEM Authorization Certificate along with a certificate that complies with the specifications requested in the terms and conditions. Compliance with additional documentation requests must also be met as specified in the main document.

How do I register for this tender?

Registration involves creating an account on the designated procurement portal and submitting the requisite documentation for verification. Ensure all documents are prepared in accepted formats to facilitate a smooth registration process.

What document formats are accepted for submissions?

Documents must be submitted in formats widely accepted in electronic submissions, such as PDF, DOCX, and images in JPEG or PNG. It’s essential to follow specifications detailed in the attached documentation.

What are the technical specifications for the Fume Extractor?

The technical specifications detail the standards required for performance, efficiency, and safety. Bidders are advised to refer to the linked specification documents to understand all necessary technical details.

What quality standards must be adhered to?

Bidders must ensure that their offerings align with the specified quality standards indicated in the tender documentation. This includes compliance with industry standards for safety and functionality of fume extraction systems.

Are there compliance requirements?

Yes, compliance requirements include adherence to safety and operational standards as stipulated in the technical documents. Providing certificates proving compliance is a fundamental part of the bid submission process.

What are the testing criteria for the Fume Extractors?

Testing criteria will reflect the operational efficiency and safety measures of the Fume Extractors as specified in the technical documentation. Successful bidders may be required to demonstrate compliance through testing results presented in their offers.

What are the details of the Earnest Money Deposit (EMD)?

Potential bidders must review the tender documentation for EMD details, which are typically necessary to ensure serious bidding. The amount required will be outlined in the official tender conditions.

What are the performance security requirements?

Bidders must provide a performance security guarantee if awarded the tender. This is usually a percentage of the contract value and aims to safeguard the fulfillment of contract obligations.

What are the payment terms for this tender?

Payment terms generally specify full payment upon successful delivery and acceptance of the Fume Extractors. Refer to the main document for any specific terms surrounding payment.

How will the price evaluation be conducted?

The price evaluation will assess the total value of the bids submitted. Bidders are encouraged to provide competitive pricing while adhering to the specifications to enhance their evaluation score.

How do I submit my bid?

Bids must be submitted electronically through the designated procurement portal, ensuring all required documents are uploaded in the accepted formats before the submission deadline.

What are the key timelines and deadlines I need to be aware of?

Specific timelines and deadlines for bid submission and evaluation will be detailed in the main tender document. Ensure to refer to it regularly for any updates or changes.

How is the evaluation and selection process carried out?

The evaluation and selection process will follow a structured method based on compliance with technical requirements and the overall financial proposal. Bids will be evaluated in accordance with the stated Total Value Wise Evaluation method.

How will results be communicated?

Results of the evaluation will typically be communicated through the procurement portal or via email notifications to the bidders outlining the outcomes of their submissions.

What benefits are available for MSEs?

MSEs may benefit from exemptions in certain eligibility criteria and potentially receive priority consideration in the evaluation process, as stipulated in the tender documentation.

What provisions exist for startups?

Startups may be eligible for special considerations in terms of experience and minimum turnover requirements, encouraging participation in national procurement through this tender.

Are there requirements related to 'Make in India' policies?

Bidders must ensure compliance with 'Make in India' policies, sourcing materials and manufacturing processes within India where applicable, as part of the commitment to local manufacturing and procurement.

What local content rules apply?

Local content and procurement rules may require bidders to meet specific local sourcing percentages to foster local production capabilities, as specified in government procurement guidelines.