Quantity

57

Category

Industrial Dustbin

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirements: OEM authorizations may be used by bidders/ resellers
  • Technical standards or certifications: Explicit standards not listed; data sheets and design approvals are mandatory
  • Special clauses: Option clause allows up to 25% quantity variation during and after contract
  • Eligibility: 3 years of govt sector manufacturing/supply experience required
  • Warranty/AMCs: Not specified in provided data
  • Penalties/LD: No explicit LD details; delivery extensions possible with no liquidated damages for design delays
  • Delivery/Installation: Delivery linked to approval of Detailed Design Drawings within 5 days of award
  • Other: Data sheet alignment is mandatory; non-conforming bids may be rejected

Categories 33

Tender Overview

The procurement is issued by the Indian Army under the Department Of Military Affairs, covering 17 distinct items including industrial dustbins, hand operated riveting machines, soldering stations, pumping machines for FOL, safety shoes in sizes 7-10, various gauges, carbide end mills, PVC water pipes, and other hardware. No explicit location or start/end dates are provided; the estimated value and EMD are not disclosed. A broad product mix signals a comprehensive facilities and safety equipment upgrade, with a notable emphasis on non-obsolete items with minimum two years of remaining market life. A key differentiator is the requirement to align with detailed design drawings prior to fabrication and a formal drawings approval window. An option clause allows quantity adjustments up to 25% during contract execution, affecting delivery planning and timeline management.

Technical Specifications & Requirements

  • No explicit technical specifications are listed; bidders must rely on BOQ items and data sheets.
  • A mandatory data sheet upload is required to enable buyer verification against offered parameters.
  • Detailed Design Drawings must be submitted within 5 days of award; buyer to approve or provide modification list within 5 days. Delay in approval extends delivery without LD.
  • Bidder must demonstrate 3 years of manufacturing/supply experience for similar govt category products. OEM or authorized resellers may apply.
  • Bids must ensure products are not end-of-life within two years residual market life. If found obsolete, bid may be rejected.
  • Documentation for Bidder onboarding includes PAN, GSTIN, cancelled cheque, EFT mandate, and vendor code creation; data sheet alignment is mandatory.

Terms, Conditions & Eligibility

  • EMD and exact payment terms are not disclosed in the tender data.
  • The bidder must not be in liquidation or similar distress; provide an undertaking.
  • Delivery terms hinge on approved drawings; extension for design approval delays is allowed without LD.
  • If an item is not obsolete, it must be delivered per approved drawings with modifications as communicated.
  • Section requires 3 years of regular govt sector supply experience and non-obsolete product lifecycle with OEM support.

Key Specifications

  • 17-item BOQ with diverse categories including industrial dustbins, riveting machines, soldering stations, and PPE footwear

  • Upload Data Sheet for each offered product to validate technical parameters

  • Approval of Detailed Design Drawings within 5 days of contract award

  • Delivery extension possible if drawings approval is delayed, with no LD

  • 3 years of regular manufacture/supply experience in similar Govt category products

  • Not-Obsolete policy: offered items must have at least 2 years residual market life

Terms & Conditions

  • Option clause allows up to 25% quantity variations during contract

  • DA drawing approvals trigger delivery timelines and potential schedule shifts

  • Bidder must demonstrate 3 years govt procurement experience and data sheet alignment

Important Clauses

Payment Terms

Not specified in data; bidders should anticipate standard govt terms awaiting vendor clarification

Delivery Schedule

Delivery start tied to approved drawings; extended period allowed for design delays without LD

Penalties/Liquidated Damages

No explicit LD details provided; schedule adjustments described via option clause and drawing approvals

Bidder Eligibility

  • 3 years of govt/PSU procurement experience for similar category products

  • Not under liquidation or bankruptcy; provide undertaking

  • Not declared end-of-life by OEM within the next 2 years

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Industrial Dustbin , Hand Operated Riveting Machine , Soldering Station , Pumping Machine for FOL Mechanical , Safety Shoes Size 7 , Safety Shoes Size 8 , Safety Shoes Size 9 , Safety Shoes Size 10 , Horizontal Dial Gauge Lever Type Least Count 0 and minus 01 mm , Universal Magnetic Stand , End Mill Cutter Carbide 9 mm size 9 into 9 into 25 into 75 , PVC Flexible Water Pipe Dia 1 by 2 inch , Cell of Digital engine bore Gauge Star power AG 13 0 percent Hg , SR 44 SW 1 point 55V Cell , Policing Wheel , Scrubbing Wheel , Cast Iron Rod 3 point 15mm

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9391188.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 17 Items Sign in for GEM prices

#1

Industrial Dustbin

Industrial Dustbin

10 nos Delivery: 30 days
#2

Hand Operated Riveting Machine

Hand Operated Riveting Machine

2 nos Delivery: 30 days
#3

Soldering Station

Soldering Station

2 nos Delivery: 30 days
#4

Pumping Machine for FOL Mechanical

Pumping Machine for FOL Mechanical

1 nos Delivery: 30 days
#5

Safety Shoes Size 7

Safety Shoes Size 7

4 pair Delivery: 30 days
#6

Safety Shoes Size 8

Safety Shoes Size 8

3 pair Delivery: 30 days
#7

Safety Shoes Size 9

Safety Shoes Size 9

2 pair Delivery: 30 days
#8

Safety Shoes Size 10

Safety Shoes Size 10

3 pair Delivery: 30 days
#9

Horizontal Dial Gauge Lever Type Least Count 0 and minus 01 mm

Horizontal Dial Gauge Lever Type Least Count 0 and minus 01 mm

2 nos Delivery: 30 days
#10

Universal Magnetic Stand

Universal Magnetic Stand

1 nos Delivery: 30 days
#11

End Mill Cutter Carbide 9 mm size 9 into 9 into 25 into 75

End Mill Cutter Carbide 9 mm size 9 into 9 into 25 into 75

5 nos Delivery: 30 days
#12

PVC Flexible Water Pipe Dia 1 by 2 inch

PVC Flexible Water Pipe Dia 1 by 2 inch

2 roll Delivery: 30 days
#13

Cell of Digital engine bore Gauge Star power AG 13 0 percent Hg

Cell of Digital engine bore Gauge Star power AG 13 0 percent Hg

5 nos Delivery: 30 days
#14

SR 44 SW 1 point 55V Cell

SR 44 SW 1 point 55V Cell

4 nos Delivery: 30 days
#15

Policing Wheel

Policing Wheel

5 nos Delivery: 30 days
#16

Scrubbing Wheel

Scrubbing Wheel

5 nos Delivery: 30 days
#17

Cast Iron Rod 3 point 15mm

Cast Iron Rod 3 point 15mm

1 pkt Delivery: 30 days

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

Vendor code creation documents

6

Data Sheet of offered products

7

Evidence of 3-year govt/PSU supply experience

8

OEM authorization (if applicable)

Reverse Auction Schedule

Completed

Start

12-Jun-2026, 7:00 pm

End

13-Jun-2026, 7:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-08-06-2026 12:13:24
2
**********   Under PMA
-08-06-2026 11:47:37
3
**********   Under PMA
-07-06-2026 17:02:43

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1RINGO ENTERPRISES(MSE)   Under PMA Winner ₹1,76,423Item Categories : Industrial Dustbin,Hand Operated Riveting Machine,Soldering Station,Pumping Machine for FOL Mechani
L2TRINITY ENTERPRISES   Under PMA₹1,76,603Item Categories : Industrial Dustbin,Hand Operated Riveting Machine,Soldering Station,Pumping Machine for FOL Mechani
L3GURU NANAK ENTERPRISES   Under PMA₹1,84,980Item Categories : Industrial Dustbin,Hand Operated Riveting Machine,Soldering Station,Pumping Machine for FOL Mechani

🎉 L1 Winner

RINGO ENTERPRISES(MSE)   Under PMA

Final Price: ₹1,76,423

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the Indian Army industrial equipment tender 2026

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and vendor code documents, along with Data Sheets for all offered items. Ensure 3 years of govt procurement experience and non-obsolete lifecycle. Drawings must be approved within 5 days of award, or modifications supplied within 5 days.

What documents are required for the Army safety footwear bid 2026

Submit PAN, GSTIN, cancelled cheque, EFT mandate, data sheets for safety shoe models in sizes 7-10, and OEM authorizations if applicable. Ensure the supplier has 3 years of govt supply experience and that products remain non-end-of-life for at least two years.

What are the design drawing approval requirements for Army procurement

Within 5 days of contract award, submit Detailed Design Drawings. The buyer will approve or provide a modification list within 5 days; delays in approval extend the delivery period with no LD penalties for the delay caused by the buyer.

What is the 25% option clause in the Army tender

The purchaser may increase or decrease quantity up to 25% at contract placement and during currency at contracted rates. Extended delivery time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.

How to demonstrate 3 years govt procurement experience for Army bids

Provide evidence of regular manufacture and supply of similar category products to Central/State Government or PSUs for at least 3 years prior to bid opening, including reference orders, client contact details, and completion certificates.

What happens if a data sheet does not match offered product

Mismatch between data sheet and product specifications can lead to bid rejection. Ensure the data sheet precisely reflects dimensions, materials, performance, and standards of the offered items before submission.

Are there any mandatory standards or certifications for the Army items

The tender requires Data Sheet alignment and evidence of govt-grade compliance. Specific standards are not listed; ensure documents demonstrate product reliability, non-obsolescence, and OEM support for the 2-year residual life requirement.

What is the delivery release condition for the Army items

Delivery commences after approval of Detailed Design Drawings. If drawing approval is delayed by the buyer, the delivery period is adjusted accordingly with no liquidated damages for buyer-caused delays.