TenderDekho Logo
Closed GEM

Nlc Tamil Nadu Power Limited Coupling Hub & Booster Pump Components Tender Tuticorin Tamil Nadu 2026

Bid Publish Date

09-Sep-2026, 9:35 pm

Bid End Date

30-Sep-2026, 3:00 pm

Generate Docs

Progress

Issue09-Sep-2026, 9:35 pm
Corrigendum24-Sep-2026
AwardPending

Key Highlights

  • • Critical items include coupling hub, bearing housing, thrust collar, oil retaining rings for BHEL FA1B75 booster pump
  • • Warranty: 12 months from commissioning or 18 months from receipt; advance warranty certificate required
  • • Delivery extensions: option to increase quantity up to 25% with equal contracted rates
  • • Inspection: post-receipt inspection at NTPL Tuticorin; pre-dispatch not applicable

Tender Overview

Nlc Tamil Nadu Power Limited invites bids for the supply of BHEL-made booster pump components and associated hardware, including coupling hubs (MOC-steel), oil retaining rings (finish machined), impeller nuts (CW/ACW), bearing housings (DE/NDE, BS-1452 Gr 430), and related items for Booster Pump Model FA1B75 under BHEL drawings HY-DG-1-18000-57143. The scope is for supply of Goods to NTPL at Tuticorin, Tamil Nadu, with a potential 25% quantity variation during contract execution. A 12‑month warranty from commissioning (or 18 months from receipt, whichever earlier) is required. Inspection will be at NTPL stores, Tuticorin; pre-dispatch inspection is not applicable. Delivery terms include option-based extensions, with minimum 30 days for any extended period. Only NTPL/NLCIL-approved vendors may be considered.

Key Specifications

    • Product names: coupling hub (MOC-steel), oil retaining ring (finish machined), impeller nut CW/ACW
    • BoM reference: BHEL FA1B75, DRG HY-DG-1-18000-57143 Rev 0
    • Bearing housing: DE/NDE, BS-1452 Gr 430
    • Thrust collar and lock nut for Booster pump FA1B75
    • Air breather adaptor for BHEL booster pump FA1B75

Terms & Conditions

  • Option clause permitting up to 25% quantity variation at contracted rates

  • Delivery schedule linked to original/extended delivery period with minimum 30 days

  • Warranty: 12 months from commissioning or 18 months from receipt; firm on letterhead

Important Clauses

Payment Terms

Not specified in provided data; follow standard supplier payment terms as per ATC

Delivery Schedule

Delivery period can extend by 25% for additional quantity; extended period time formula provided; minimum extension 30 days

Penalties/Liquidated Damages

Not specified in provided data; apply standard NTPL terms if stated in ATC

Bidder Eligibility

  • NTPL/NLCIL approved vendor status required

  • Manufacturer of identical items with Govt./PSU purchase orders in last 10 years preferred

  • Compliance with warranty and post-dispatch inspection requirements

Advertisement

Authority & Contact

Office Name

Tuticorin 628004

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

32

Category

ST020080285 -Bearing Housing -NDE, Material -BS-1452 Gr 430 for Booster pump Model no FA1B75 BHELs Drg no HY- DG-1-18000-57143 Rev 0 Part no 7

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

12 months

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

ST020080898 -COUPLING HUB, MOC-Steel for BHEL make BP Model No FA1B75, BHEL Drg no. HY-DG-1 -18000-57143. Rev 0, Part no.14 , ST020080899 -OIL RETAINING RING DE FINISH MACHINED for BHEL make BP Model No.FA1B75, BHEL Drg no. HY-DG-1-18000-57143, Rev 0 , ST020011925 - Impeller Nut. One set consist of two nut CW and ACW, MOC- BS-970 Pt4. 431,S29 for BHEL make Booster Pump Model No FA1B75 Part no 13 as per BHEL Drg no HY-DG-1-18000- 57143 Rev 0 , ST020080284 -Bearing Housing -DE, Material -BS-1452 Gr 430 for Booster pump Model no FA1B75 BHEL Drg no HY-DG-1-18000-57143 Rev 0 Part no 6 , ST020080285 -Bearing Housing -NDE, Material -BS-1452 Gr 430 for Booster pump Model no FA1B75 BHELs Drg no HY- DG-1-18000-57143 Rev 0 Part no 7 , ST020080068 -Thrust collar for BFP Drive turbine booster pump FA 1B 75 , ST020080288 -Thrust Collar lock nut for Booster pump Model no FA1B75 BHEL Drg no HY-DG-1-18000 -57143 Rev 0 , ST020080897 -Air breather and Adaptor for BHEl make Booster pump Model no FA1B75 BHEL Drg no HY-DG-1- 18000-57143 Rev 0

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Tuticorin

Delivery Pincodes

628004

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Manivannan Selvaraj628004,NLC TAMILNADU POWER LIMITED 2X500 MW THERMAL POWER PLANT HORBOUR ESTATE, TUTICORINTuticorinTamil Nadu6280041120-

Authority Records

MINISTRY OF COALNLC TAMIL NADU POWER LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9780418.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 8 Items Sign in for GEM prices

#1

ST020080898 -COUPLING HUB, MOC-Steel for BHEL make BP Model No FA1B75, BHEL Drg no. HY-DG-1 -18000-57143. Rev 0, Part no.14

ST020080898 -COUPLING HUB, MOC-Steel for BHEL make BP Model No FA1B75, BHEL Drg no. HY-DG-1 -18000-57143. Rev 0, Part no.14

1 nos Delivery: 120 days
#2

ST020080899 -OIL RETAINING RING DE FINISH MACHINED for BHEL make BP Model No.FA1B75, BHEL Drg no. HY-DG-1-18000-57143, Rev 0

ST020080899 -OIL RETAINING RING DE FINISH MACHINED for BHEL make BP Model No.FA1B75, BHEL Drg no. HY-DG-1-18000-57143, Rev 0

8 nos Delivery: 120 days
#3

ST020011925 -Impeller Nut. One set consist of two nut CW and ACW, MOC-BS-970 Pt4. 431,S29 for BHEL make Booster Pump Model No FA1B75 Part no 13 as per BHEL Drg no HY-DG-1-18000-57143 Rev 0

ST020011925 -Impeller Nut. One set consist of two nut CW and ACW, MOC-BS-970 Pt4. 431,S29 for BHEL make Booster Pump Model No FA1B75 Part no 13 as per BHEL Drg no HY-DG-1-18000-57143 Rev 0

3 set Delivery: 120 days
#4

ST020080284 -Bearing Housing -DE, Material -BS-1452 Gr 430 for Booster pump Model no FA1B75 BHEL Drg no HY-DG-1-18000-57143 Rev 0 Part no 6

ST020080284 -Bearing Housing -DE, Material -BS-1452 Gr 430 for Booster pump Model no FA1B75 BHEL Drg no HY-DG-1-18000-57143 Rev 0 Part no 6

2 nos Delivery: 120 days
#5

ST020080285 -Bearing Housing -NDE, Material -BS-1452 Gr 430 for Booster pump Model no FA1B75 BHELs Drg no HY-DG-1-18000-57143 Rev 0 Part no 7

ST020080285 -Bearing Housing -NDE, Material -BS-1452 Gr 430 for Booster pump Model no FA1B75 BHELs Drg no HY-DG-1-18000-57143 Rev 0 Part no 7

2 nos Delivery: 120 days
#6

ST020080068 -Thrust collar for BFP Drive turbine booster pump FA 1B 75

ST020080068 -Thrust collar for BFP Drive turbine booster pump FA 1B 75

2 nos Delivery: 120 days
#7

ST020080288 -Thrust Collar lock nut for Booster pump Model no FA1B75 BHEL Drg no HY-DG-1-18000 -57143 Rev 0

ST020080288 -Thrust Collar lock nut for Booster pump Model no FA1B75 BHEL Drg no HY-DG-1-18000 -57143 Rev 0

2 nos Delivery: 120 days
#8

ST020080897 -Air breather and Adaptor for BHEl make Booster pump Model no FA1B75 BHEL Drg no HY-DG-1-18000-57143 Rev 0

ST020080897 -Air breather and Adaptor for BHEl make Booster pump Model no FA1B75 BHEL Drg no HY-DG-1-18000-57143 Rev 0

12 nos Delivery: 120 days

Categories 48

Corrigendum Updates

1 Update
#1

Update

24-Sep-2026

Extended Deadline

30-Sep-2026, 9:30 am

Opening Date

01-Oct-2026, 9:30 am

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT mandate certified by bank

5

Vendor registration documents for NTPL/NLCIL (if existing)

6

OEM authorization or purchase orders of similar items from Govt/PSUs in last 10 years

7

Warranty certificate on firm's letterhead (to be submitted before dispatch)

8

Technical compliance certificates and inspection/test reports if applicable

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for coupling hub and booster pump components tender Tuticorin Tamil Nadu 2026

Bidders must register with NTPL/NLCIL as vendors or prove OEM authorization for FA1B75 components, submit PAN, GSTIN, cancelled cheque, and EFT mandate, plus warranty and OEM purchase orders from govt entities in the last 10 years. Ensure compliance with the HY-DG-1-18000-57143 drawings and BS-1452 Gr 430 material where applicable.

What documents are required for NTPL booster pump parts tender submission

Submit PAN, GSTIN, cancelled cheque, EFT mandate, vendor code creation documents, OEM authorization, and purchase orders for similar items with govt/Govt‑owned entities in last 10 years. Include warranty certificate on firm letterhead before dispatch and any technical compliance certificates.

What are the technical standards for bearing housings in this tender

Bearings housings must use BS-1452 Gr 430 material for DE/NDE variants and conform to BHEL FA1B75 drawings HY-DG-1-18000-57143 Rev 0. Impeller nuts use 431 S29 grade steel; ensure MOC-steel coupling hub compatibility with FA1B75 pump.

When is the delivery schedule and quantity variation allowed for this tender

Delivery can be extended for up to 25% additional quantity at contracted rates. The extended delivery time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum 30 days, subject to ATC and option clauses.

What warranties are required for BHEL FA1B75 components

Warranty is 12 months from commissioning or 18 months from receipt, whichever comes first. Submit a warranty certificate on the bidder’s letterhead prior to dispatch and maintain post-sale support as per ATC terms.

What eligibility criteria ensure qualification for NTPL/NLCIL vendors

Only vendors approved by NTPL/NLCIL or manufacturers of identical items with govt purchase orders in the last 10 years may be evaluated. Additional criteria include compliance with warranty obligations and post-receipt inspection at NTPL Tuticorin.

Which inspections occur before/after delivery for this tender

Post-receipt inspection occurs at NTPL stores in Tuticorin before acceptance. Pre-dispatch inspection is not applicable unless specified by ATC; ensure all certificates and test reports accompany delivery.