HOCKEY STICK,LEG GAURD,HEAD MASSGER MACHINE,HAIR CUTTING MACHINE,SMPS RO,PUMP RO,RO MEMBERS,ELEMENT
Indian Army
Ajmer, RAJASTHAN
Bid Publish Date
08-Oct-2025, 6:02 pm
Bid End Date
01-Nov-2025, 6:00 pm
EMD
₹10,500
Location
Progress
Quantity
1458
Category
JHOOL
Bid Type
Two Packet Bid
A tender has been published for Uttar Pradesh Police JHOOL, RAKAAB, RAAS, BIT SPORTS, NUKTA, LINSEED OIL, HORSE HAIR CUTTING in MORADABAD, UTTAR PRADESH. Quantity: 1458 by. Submission Deadline: 01-11-2025 18: 00: 00. Check eligibility and apply.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Ajmer, RAJASTHAN
N/a
N/a
N/a
N/a
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | JHOOL | Size Full Color Black Material Polyester Filling Yes Chest and Leg Straps Yes Type Winter Blanket | 27 | pieces | ripolacademy | 30 |
| 2 | RAKAAB | Stainless Steel Stirrups 4.75 inch Leather Stirrups Width 1 inch Leather Stirrups Length 54 inch Leather Stirrups Color Brown or Red Leather Stirrups Stitching Double Side | 27 | pairs | ripolacademy | 30 |
| 3 | RAAS | Length 137 152 cm Width 2 cm Material Leather Color Brown or Red Bit Hook Stud Yes Style Type Split | 54 | pieces | ripolacademy | 30 |
| 4 | BIT SPORTS | Material Copper Joint Type Double Mouthpiece Thickness 10 20 mm | 27 | pieces | ripolacademy | 30 |
| 5 | NUKTA | Material Leather Color Brown or Red Width 1 cm Finish Stitched Fringe Yes Fringe Type Cotton Cord | 27 | pieces | ripolacademy | 30 |
| 6 | LINSEED OIL | Packing size 5kg Color Yellow FSSAI Certified Yes Shelf Life 9 months Trans fat No | 972 | kilograms | ripolacademy | 365 |
| 7 | HORSE HAIR CUTTING | With Material or Equipment Yes Contract Duration Yearly Hair Cutting Monthly Number Of Horse 27 | 324 | times | ripolacademy | 365 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
01-Nov-2025, 6:00 pm
Opening Date
01-Nov-2025, 6:30 pm
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS