Bid Publish Date
15-Jul-2026, 5:08 pm
Bid End Date
25-Jul-2026, 6:00 pm
EMD
₹5,72,563
Location
Progress
RAA tender has been published for Hindustan Petroleum Corporation Ltd Pre Mitigation Data logging, Installation of Coupons 1 cm2, Soil Resistivity Measurement, Collection of Data from Utility owner, Computer Modelling and Simulation, Second Phase Computer Simulation and Validation, Post Mitigation Data Logging Phase 1, Final Report Submission Phase 1, Profiling of AC Power Lines or Foreign Pipeline, Training to HPCL Officers, Post Mitigation Data Logging Phase 2, Final Report Submission Phase 2 in WEST GODAVARI, ANDHRA PRADESH. Quantity: 1407 by. Submission Deadline: 25-07-2026 18: 00: 00. Check eligibility and apply.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | CONSULTECH Under PMA | - | 25-07-2026 17:04:17 | |
| 2 | DEHN INDIA PRIVATE LIMITED Under PMA | - | 25-07-2026 10:53:38 | |
| 3 | HAZZALE BLUE TRADING PRIVATE LIMITED Under PMA | - | 25-07-2026 16:48:03 | |
| 4 | JEF TECHNO SOLUTIONS PRIVATE LIMITED Under PMA | - | 24-07-2026 19:13:53 | |
| 5 | SARK EPC PROJECTS PRIVATE LIMITED Under PMA | - | 24-07-2026 17:47:40 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | JEF TECHNO SOLUTIONS PRIVATE LIMITED(MSE,MII) Under PMA Winner | ₹2,35,11,580 | Item Categories : Pre Mitigation Data logging,Installation of Coupons 1 cm2,Soil Resistivity Measurement,Collection o |
| L2 | DEHN INDIA PRIVATE LIMITED (MII) Under PMA | ₹2,35,46,826 | Item Categories : Pre Mitigation Data logging,Installation of Coupons 1 cm2,Soil Resistivity Measurement,Collection o |
| L3 | SARK EPC PROJECTS PRIVATE LIMITED (MSE) Under PMA | ₹2,65,12,830 | Item Categories : Pre Mitigation Data logging,Installation of Coupons 1 cm2,Soil Resistivity Measurement,Collection o |
🎉 L1 Winner
JEF TECHNO SOLUTIONS PRIVATE LIMITED(MSE,MII) Under PMA
Final Price: ₹2,35,11,580
Start
24-Sep-2026, 12:00 pm
End
25-Sep-2026, 12:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
1407
Category
Computer Modelling and Simulation
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
5 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
85
Past Performance
40 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Pre Mitigation Data logging , Installation of Coupons 1 cm2 , Soil Resistivity Measurement , Collection of Data from Utility owner , Computer Modelling and Simulation , Second Phase Computer Simulation and Validation , Post Mitigation Data Logging Phase 1 , Final Report Submission Phase 1 , Profiling of AC Power Lines or Foreign Pipeline , Training to HPCL Officers , Post Mitigation Data Logging Phase 2 , Final Report Submission Phase 2
Advisory Bank
ICICI
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
720
Delivery Locations
1
Delivery Cities
Eluru
Delivery Pincodes
534449
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Yadavali Nagesh | 534449,JK GUDEM BOOSTER STATION, Guntupalli, Kamavarapukota, West Godavari - 534449 | Eluru | Andhra Pradesh | 534449 | 350 | 720 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Pre Mitigation Data logging
As per tender doc
Installation of Coupons 1 cm2
As per tender doc
Soil Resistivity Measurement
As per tender doc
Collection of Data from Utility owner
As per tender doc
Computer Modelling and Simulation
As per tender doc
Second Phase Computer Simulation and Validation
As per tender doc
Post Mitigation Data Logging Phase 1
As per tender doc
Final Report Submission Phase 1
As per tender doc
Profiling of AC Power Lines or Foreign Pipeline
As per tender doc
Training to HPCL Officers
As per tender doc
Post Mitigation Data Logging Phase 2
As per tender doc
Final Report Submission Phase 2
As per tender doc
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Pre Mitigation Data logging | As per tender doc | 350 | eac | knprajasekhar | 720 | |
| 2 | Installation of Coupons 1 cm2 | As per tender doc | 250 | eac | knprajasekhar | 720 | |
| 3 | Soil Resistivity Measurement | As per tender doc | 500 | eac | knprajasekhar | 720 | |
| 4 | Collection of Data from Utility owner | As per tender doc | 1 | eac | knprajasekhar | 720 | |
| 5 | Computer Modelling and Simulation | As per tender doc | 1 | eac | knprajasekhar | 720 | |
| 6 | Second Phase Computer Simulation and Validation | As per tender doc | 1 | eac | knprajasekhar | 720 | |
| 7 | Post Mitigation Data Logging Phase 1 | As per tender doc | 150 | eac | knprajasekhar | 720 | |
| 8 | Final Report Submission Phase 1 | As per tender doc | 1 | eac | knprajasekhar | 720 | |
| 9 | Profiling of AC Power Lines or Foreign Pipeline | As per tender doc | 1 | eac | knprajasekhar | 720 | |
| 10 | Training to HPCL Officers | As per tender doc | 1 | eac | knprajasekhar | 720 | |
| 11 | Post Mitigation Data Logging Phase 2 | As per tender doc | 150 | eac | knprajasekhar | 720 | |
| 12 | Final Report Submission Phase 2 | As per tender doc | 1 | eac | knprajasekhar | 720 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer