TenderDekho Logo
GEM

Hindustan Aeronautics Limited Laser Wire Marking Machine Tender Bangalore Karnataka IS/ISI Compliant 2026

Bid Publish Date

17-Jul-2026, 8:30 am

Bid End Date

07-Aug-2026, 12:00 pm

Progress

Issue17-Jul-2026, 8:30 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Key Highlights

  • Specific brand/OEM requirements: Not explicitly specified in data
  • Technical certifications/standards: ISI/ISI-like compliance not stated; IS 550/ISO not mentioned
  • Special clauses: 50% quantity variation allowance under option clause; delivery time formula with minimum 30 days
  • Eligibility criteria: GSTIN, PAN, EFT mandate, integrity pact submission
  • Warranty/AMC: PBG 10% during warranty; SDBG 5% within 15 days
  • Penalties/terms: No explicit LD/penalty listed beyond PBG/SDBG requirements
  • Delivery/installation: Includes training of operators; statutory clearances if any required

Categories 2

Tender Overview

Hindustan Aeronautics Limited ( Department Of Defence Production ) invites bids for a LASER WIRE MARKING MACHINE to be supplied, installed, tested and commissioned in BANGALORE, KARNATAKA. Bid scope includes delivery, installation, testing, commissioning, operator training and obtaining any required statutory clearances. The contract supports option to increase/decrease quantity up to 50% at contracted rates, with delivery timelines linked to original and extended periods. Payment schedule specifies 100% payment within 30 days after successful installation. Final acceptance triggers Performance Bank Guarantee (PBG) of 10% during warranty; a Security Deposit 5%, via BG, is due within 15 days of contract award and valid through acceptance. This procurement emphasizes turnkey delivery and post-installation support from HAL.

Technical Specifications & Requirements

  • Product category: LASER WIRE MARKING MACHINE
  • Scope: Supply, installation, testing, commissioning, and operator training; statutory clearances (if any)
  • Delivery terms: Commensurate with last date of original delivery order; option to adjust time using the formula (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
  • Financial terms: 5% SDBG (within 15 days of contract award), 10% PBG during warranty; 100% payment within 30 days after installation
  • ATC requirements: Include scanned Integrity Pact with technical bid; hard copy IP to HAL post-acceptance
  • Other commitments: Bidder must provide EFT mandate, PAN, GSTIN, cancelled cheque; GST as actuals or applicable rates, whichever is lower

Terms, Conditions & Eligibility

  • EMD/BG: Security Deposit 5% of total basic contract value; PBG 10% during warranty
  • Payment terms: 100% within 30 days after successful installation and commissioning
  • Delivery timeline: Time period for delivery and installation to be specified by bidder; adherence to extended delivery rules if option exercised
  • Integrity Pact: Submit scanned IP in technical bid; hard copy with tender reference post-award
  • Repeat orders: HAL may issue repeat orders within 1 year from delivery/acceptance
  • GST: Bidders to self-assess GST; reimbursement as actuals or as per applicable rates (max quoted GST %)

Key Specifications

  • Product: LASER WIRE MARKING MACHINE

  • Quantity: not specified in BOQ (scope single procurement for HAL Bangalore)

  • Estimated value: not disclosed

  • Standards/Compliance: IS/ISI certification requirements not specified in data

  • Delivery/Installation: turnkey with training and statutory clearances if required

  • Warranty/PBG: 10% PBG during warranty; 5% SDBG due within 15 days of award

Terms & Conditions

  • EMD/SDBG: 5% security deposit and 10% PBG during warranty

  • Payment: 100% within 30 days after installation

  • Delivery: quantity adjustment up to 50% and extended delivery rules

Important Clauses

Payment Terms

100% payment within 30 days after successful installation and commissioning

Delivery Schedule

Bidder must specify delivery and installation time; option clause allows extended delivery as per formula

Penalties/Liquidated Damages

PBG 10% during warranty; SDBG 5% within 15 days of award; no explicit LD percentage listed

Bidder Eligibility

  • GSTIN valid and operational

  • PAN card provided

  • EFT mandate with bank certification

  • Integrity Pact submitted digitally

  • Capability to supply, install, test and train for Laser Wire Marking Machine

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

LASER WIRE MARKING MACHINE

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Bangalore

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BangaloreBangalore--1120-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9619829.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate duly certified by Bank

5

GST certificate and PAN as required

6

Integrity Pact (scanned) in technical bid, hard copy post-acceptance

7

Proof of capability to supply, install, test and commission Laser Wire Marking Machine

8

Any OEM authorization or technical compliance certificates (if applicable)

Frequently Asked Questions

Key insights about KARNATAKA tender market

How to bid in HAL laser wire marking tender in Bangalore 2026?

Bidders must prepare PAN, GSTIN, cancelled cheque, and EFT mandate; submit Integrity Pact scanned; provide delivery, installation, testing and commissioning plans; ensure 5% SDBG within 15 days and 10% PBG during warranty; bid must include 100% payment terms after installation.

What documents are required for HAL laser machine procurement in Karnataka?

Required documents include PAN card, GSTIN, cancelled cheque, EFT mandate certified by bank, Integrity Pact (scanned) in technical bid, OEM authorizations if applicable, and proof of capability to deliver turnkey installation and operator training in Bangalore.

What are the payment terms for HAL laser wire marking supply contract?

Payment is 100% within 30 days after successful installation and commissioning. Additionally, a 5% Security Deposit via BG is due within 15 days and a 10% PBG is applicable during the warranty period. GST shall be charged as actuals or at quoted rate.

What are the delivery and quantity variation terms for this HAL tender?

The buyer may increase or decrease quantity up to 50% of bid quantity at contract placement and during the currency, with delivery time adjusted using the specified formula, minimum 30 days, starting from the last date of the original delivery order.

What are the essential technical expectations for the laser marking machine tender?

The tender specifies a LASER WIRE MARKING MACHINE with turnkey delivery, installation, testing, commissioning and operator training. While no explicit IS/ISI standard is listed, the bidder should reference industry standards in their technical bid and ensure integration capability with HAL's processes in Bangalore.

What is required for Integrity Pact submission in HAL procurement?

Submit a scanned Integrity Pact in the technical bid via GeM portal; provide the hard copy referencing tender details after award, ensuring alignment with HAL's procurement compliance and audit requirements.

When will HAL release payments after installation for this laser machine bid?

Payment terms specify 100% payment within 30 days post successful installation and commissioning, contingent on HAL's acceptance and commissioning validation as per contract terms.

What are the GST considerations for HAL laser marking equipment tender?

GST is bidder-specific; bidders must assess GST on their own. HAL will reimburse GST at actuals or per applicable rates, whichever is lower, not exceeding the quoted GST percentage in the bid.