Supply of 100 Split Acs,Installation Testing and Commissioning,Refrigerant Pipings,Electrical Cable
Jawaharlal Nehru Port Trust
RAIGAD, MAHARASHTRA
Bid Publish Date
22-Feb-2026, 5:05 pm
Bid End Date
04-Mar-2026, 6:00 pm
Location
Progress
Quantity
512
Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2)
Bid Type
Two Packet Bid
The opportunity is issued by the Marketing Division, Indian Oil Corporation Limited (IOCL) for procurement and installation of HVAC systems, including split and cassette AC units, PVC drainage with nitrile foam insulation, and electrical cabling between condenser and evaporator. The scope includes supply, installation, testing and commissioning of refrigerant liquid lines, insulated suction lines, and associated accessories. Expected involvement covers IS 1391 (Part 2) compliant wall-mounted units, installation charges for split and cassette configurations, and related testing. The tender emphasizes standard warranties on major components and compliance with energy efficiency norms. The contracting approach allows volume adjustments up to 25% of bid quantity and extended delivery periods within contract terms, signaling flexible procurement with performance-based delivery tied to OCC terms.
Product/service: Split Air Conditioners and Cassette AC units, ISI Marked
Capacities: Nominal capacity in tons; BEE Star Rating; compressor type per BEE label
Performance: Size of air conditioner; IS 1391 (Part 2) compliance; 32mm PVC drain piping with nitrile foam insulation
Durability: Minimum standard warranty on air conditioner, compressor, and PCB
Installation: Installation charges for split and cassette units; testing & commissioning
Electrical: 3Cx2.5 cabling between condenser and evaporator; adherence to safety and ISI guidelines
Volume variation: up to 25% increase/decrease at contract placement and during currency
Delivery: timeline aligned with last delivery order; extended time formula with minimum 30 days
Documentation: mandatory PAN, GST, Annexures A–I; anti-tamper and holiday-list declarations
Not explicitly specified; bidders should prepare for IOCL standard payment terms upon delivery and acceptance, with reference to AMC/Warranty settlements
Delivery may be extended by option clause; additional time = (Increased quantity / Original quantity) × Original delivery period, minimum 30 days
LD terms not fully defined in data; standard IOCL procurement penalties likely applicable for late delivery or non-conformance
Pan and GST registration valid and up to date
OEM authorization for supplied AC units (as per Annexure I)
Compliance with Annexures A–F and I; no holiday listing and no multi-bid tendency
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Jawaharlal Nehru Port Trust
RAIGAD, MAHARASHTRA
Gurukula Kangri Deemed To Be University
HARIDWAR, UTTARAKHAND
State Bank Of India (sbi)
VARANASI, UTTAR PRADESH
Indian Army
JAIPUR, RAJASTHAN
State Bank Of India (sbi)
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Description of Stores | Wall Mount Type Split Air Conditioner with copper evaporator and condenser, reusable air filter and standard accessories [3 meter Refrigerant Interconnecting Copper Pipe, 1 meter PVC insulated sheathed power cable(as per IS 694), Drain pipe, Remote] |
| Performance Parameters | Size of Air Conditioner | Small [suitable for room area upto 120 sq. ft.], Medium [suitable for room area between 130-180 sq. ft.] |
| Performance Parameters | Compressor Type as per BEE Star Rating Label | Inverter - Variable Speed |
| Performance Parameters | Nominal Capacity of Air Conditioner (in Ton) | 0.8 Ton - 1.2 Ton, 1.3 Ton - 1.7 Ton |
| Performance Parameters | Classification By Function | Cooling Only |
| Performance Parameters | BEE Star Rating | 5 Star |
| Warranty and Test Reports | Minimum Standard Warranty on Air Conditioner (in years) | 1.0 |
| Warranty and Test Reports | Warranty on Compressor | 10.0 Or higher |
| Warranty and Test Reports | Warranty on PCB | 5 Or higher |
Discover companies most likely to bid on this tender
PAN card copy
GST registration certificate copy
Annexure A: Undertakings and Declarations on Acceptance of Tender Terms and Conditions
Annexure B: Declaration on NCLT/NCLAT/DRT/DRAT, receivership or liquidation
Annexure D: Tender not tampered declaration
Annexure E: Undertakings for Holiday Listing
Annexure F: Declaration on A, B, C, D
Annexure I: Undertaking of No Multiple Bidding
Key insights about UTTAR PRADESH tender market
Bidders should submit PAN, GST, Annexure A–F and I declarations, OEM authorization, and holiday listing proof. Ensure ISI Marked AC units meet IS 1391 (Part 2) and BEE star ratings. Include installation charges, testing, and 3Cx2.5 cabling details. Follow option clause rules for quantity adjustments.
Required documents include PAN, GST certificate, Annexure A–F and I declarations, NCLT/NCLAT/DRT statement, tender tamper-proof declaration, holiday listing, and OEM authorization. Ensure all documents are in bidder’s name and reflect current validity and compliance.
Units must be ISI Marked and IS 1391 (Part 2) compliant. Specify nominal capacity in tons, BEE Star Rating, and compressor type per label. Include 32mm PVC drain piping with nitrile foam insulation and 3Cx2.5 electrical cabling between condenser and evaporator.
Delivery terms allow ±25% quantity variation. The extended delivery time formula is (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days, starting from the last date of the original delivery order.
Bids require a minimum standard warranty on the air conditioner and separate warranties for the compressor and PCB. Ensure warranty terms align with IOCL procurement expectations and are clearly stated in the technical bid.
Submit OEM authorization as per Annexure I, ensuring the bidder can supply and service ISI-marked AC units. Authorization must be in the bidder’s name and cover post-installation support and warranty validation.
Scope includes supply, installation, testing and commissioning of refrigerant liquid lines, insulated suction lines, PVC drainage with nitrile foam insulation, and electrical cabling between condenser and evaporator. Installation charges for split and cassette units are included.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS