TenderDekho Logo
GEM

Zilla Parishad Satara ADSS Optical Fibre Cable Tender Satara Maharashtra 412801 25% Quantity Option Clause 2025

Bid Publish Date

20-Dec-2025, 4:32 pm

Bid End Date

30-Dec-2025, 5:00 pm

Progress

Issue20-Dec-2025, 4:32 pm
Technical27-12-2025 14:23:18
Financial
Award06-Jan-2026, 4:52 am
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 4

Tender Overview

Organization: Zilla Parishad Satara, Department: Rural Development Department, Location: Satara, Maharashtra 412801. Tender for ADSS Optical Fibre Cable For laying along Power line alignments (Q3). No BOQ items listed and no explicit quantity or estimated value provided. The tender includes an Option Clause allowing up to a 25% increase or decrease in bid quantity at contract award and during the currency of the contract at contracted rates. Delivery timelines hinge on last date of original delivery order, with extended time calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. This highlights procurement of backbone telecom cabling for rural infrastructure under the Rural Development mandate.

Technical Specifications & Requirements

  • Product/category: ADSS Optical Fibre Cable for installation along power line right-of-ways.
  • No explicit technical specifications, capacities, lengths, or certifications are provided in the tender data.
  • Key implication: bidders must rely on standard industry practices for ADSS fibre cables and align with the option clause for quantity fluctuations; ensure compatibility with existing power-line corridor installations and rural access networks. Communication with the buyer is advised to obtain missing specs, installation methods, and compatibility checks before bidding.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may adjust quantity by up to 25% at contract placement and during contract period at contracted rates.
  • Delivery period: Calculated as described; minimum extension of 30 days when applying option clause.
  • Other specific terms (EMD, delivery timeframes, documents) are not detailed in the published data; bidders should request complete ATC and logistics terms prior to bid submission.

Key Specifications

    • Product/service name: ADSS Optical Fibre Cable for power line alignments
    • Quantity/Value: Not specified in tender; 25% quantity variation permitted
    • Standards/Certifications: Not specified; confirm required standards with buyer
    • Delivery/Installation: Based on last date of original delivery order; extended time formula provided
    • Warranty/Support: Not specified

Terms & Conditions

  • Option Clause allows ±25% quantity adjustment at contract award and during contract term

  • Delivery period extends from last delivery order date with a minimum 30-day extension

  • No explicit EMD amount or delivery timeframe published; seek ATC for complete terms

Important Clauses

Payment Terms

Not specified in the tender data; verify with buyer and ATC documents during bid submission

Delivery Schedule

Delivery period starts from the last date of the original delivery order; option-based extension uses (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in the published data; confirm LD clauses in ATC or contract

Bidder Eligibility

  • Eligibility criteria not fully disclosed; bidders should obtain complete ATC and terms from the buyer

  • Experience in supplying ADSS fibre cables or rural telecom infrastructure recommended

  • GST registration and financial capability documentation likely required

Documents 3

GeM-Bidding-8743929.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

ADSS Optical Fiber Cable (Defence)

Pune District Panchayats

PUNE, MAHARASHTRA

Posted: 10 December 2025
Closed: 20 December 2025
GEM

ADSS Optical Fiber Cable (Defence)

Munitions India Limited

CHANDRAPUR, MAHARASHTRA

Posted: 17 August 2025
Closed: 27 August 2025
GEM

ADSS Optical Fiber Cable (Defence)

Indian Air Force

BHOPAL, MADHYA PRADESH

Posted: 20 March 2025
Closed: 11 April 2025
GEM

ADSS Optical Fiber Cable (Defence)

East Central Railway

DHANBAD, JHARKHAND

Posted: 15 April 2025
Closed: 26 April 2025
GEM

ADSS Optical Fiber Cable (Defence)

North Eastern Railway

SARAN, BIHAR

Posted: 21 February 2025
Closed: 5 March 2025
GEM

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (relevant to ADSS fibre cables or rural telecom deployments)

4

Financial statements (audited, if available)

5

EMD/Security deposit details (amount not specified in tender; confirm requirement with buyer)

6

Technical bid documents (compliance with ADSS fibre cable standards, installation methods)

7

OEM authorizations or certifications (if applicable to fibre cable supply)

Technical Results

S.No Seller Item Date Status
1GLOBAL THOUGHT INFOTECH   Under PMAMake : NA Model : STCSL/24F/ADSS/AT/SDA/0127-12-2025 14:23:18Qualified
2IMAGICA   Under PMAMake : NA Model : PCL ADSS OFC26-12-2025 14:24:02Qualified
3Vidhya Enterprises   Under PMAMake : NA Model : Fiber 12Core ADSS Armoured Cable27-12-2025 14:04:45Qualified

Financial Results

Rank Seller Price Item
L1Vidhya Enterprises   Under PMA₹67,800Item Categories : ADSS Optical Fibre Cable For laying along Power line alignments
L2IMAGICA   Under PMA₹68,980Item Categories : ADSS Optical Fibre Cable For laying along Power line alignments
L3GLOBAL THOUGHT INFOTECH   Under PMA₹78,900Item Categories : ADSS Optical Fibre Cable For laying along Power line alignments

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for ADSS fibre cable tender in Satara Maharashtra 2025?

Bidders should obtain the complete ATC from Zilla Parishad Satara, submit GST and PAN, provide experience certificates for similar fibre deployments, and comply with the option clause allowing +/-25% quantity adjustments. Ensure understanding of delivery timelines tied to the original delivery order and minimum 30-day extensions.

What documents are required for Satara fibre cable procurement bid 2025?

Submit GST certificate, PAN card, experience certificates for ADSS fibre or rural telecom, financial statements, EMD details (amount not specified—confirm), technical bid with compliance notes, and OEM authorizations if applicable. Include installation and testing capabilities.

What is the delivery timeline for the ADSS fibre cable contract in Satara?

Delivery starts from the last date of the original delivery order; any extension uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Ensure readiness for mid-term quantity changes as per clause.

Are there specific technical standards for the fibre cable tender in Satara?

The tender data does not list explicit standards; bidders should seek ATC for required specifications (ADSS fibre type, core count, jacket material) and ensure compatibility with rural power-line corridor installations.

What is the eligibility criteria for supply of ADSS fibre cables in Satara 2025?

At minimum, demonstrate prior experience in delivering similar fibre cable projects, possess valid GST, and provide financial documentation. Comply with the purchaser's option clause and seek clarification on EMD amount and warranty terms in ATC.

How to verify EMD and payment terms for Satara fibre cable tender?

The published data does not specify EMD amount or payment terms. Contact Zilla Parishad Satara for exact EMD value, mode of submission, and payment schedule; verify whether security deposit is required with the ATC and contract documents.

What installation considerations are required for ADSS cable along power lines?

Bidders should confirm with the buyer the installation method, permissible spans, clearance distances, and safety standards for working near power lines, plus testing procedures after installation as part of the technical bid.

When will the tender evaluation occur for the Satara fibre cable bid?

Tender evaluation timelines are not provided in the data. Bidders should obtain the ATC for the evaluation methodology, including technical compliance, past performance, and price bid evaluation criteria from Zilla Parishad Satara.