Dome Camera,Bullet Camera,32 ch NVR,6TB HDD,8 port PoE Switch,8 Port managed SFP Switch,4 port PoE
Indian Army
NORTH 24 PARGANAS, WEST BENGAL
Bid Publish Date
17-Feb-2026, 4:59 pm
Bid End Date
10-Mar-2026, 5:00 pm
Progress
Quantity
4115
Category
L3 Managed Switch 24 port
Bid Type
Two Packet Bid
Department Of Posts invites bids for L3 Managed Switch 24 port, L2 Managed PoE Switch 24 port, SFP Module 10G, Fiber Patch cord, L2 non-PoE Switch 16 port, 6 core armoured fiber cable, Cable lying with conduit pipe, Installation and configuration, Hardware Firewall. Quantity: 4115. Submission Deadline: 10-03-2026 17: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
NORTH 24 PARGANAS, WEST BENGAL
N/a
DHAR, MADHYA PRADESH
Indian Army
JABALPUR, MADHYA PRADESH
Assam University
Prasar Bharati Broadcasting Corporation Of India
HYDERABAD, TELANGANA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | L3 Managed Switch 24 port | Asper BoQ Specification | 2 | pieces | adtowb | 15 |
| 2 | L2 Managed PoE Switch 24 port | Asper BoQ Specification | 8 | pieces | adtowb | 15 |
| 3 | SFP Module 10G | Asper BoQ Specification | 32 | pieces | adtowb | 15 |
| 4 | Fiber Patch cord | Asper BoQ Specification | 50 | pieces | adtowb | 15 |
| 5 | L2 non-PoE Switch 16 port | Asper BoQ Specification | 21 | pieces | adtowb | 15 |
| 6 | 6 core armoured fiber cable | Asper BoQ Specification | 2,000 | meter | adtowb | 15 |
| 7 | Cable lying with conduit pipe | Asper BoQ Specification | 2,000 | meter | adtowb | 15 |
| 8 | Installation and configuration | Asper BoQ Specification | 1 | pieces | adtowb | 15 |
| 9 | Hardware Firewall | Asper BoQ Specification | 1 | pieces | adtowb | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
National Institute Of Technology (nit)
📍 EAST KHASI HILLS, MEGHALAYA
Hqids
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS