Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1
Central Railway
PUNE, MAHARASHTRA
Progress
Quantity
98
Category
Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1
Bid Type
Single Packet Bid
National Aluminium Company Limited (Nalco), Bhubaneswar, invites bids for Circuit Breakers with Integral Overcurrent Protection (RCBO) aligned to IS 12640 (Part 2) and IEC 61009-1. The scope centers on procurement of RCBO units for Nalco’s smelter stores, with a delivery timeline of 120 days from order placement. The contract includes 12-month warranty from material receipt and requires inclusion of the annexed specification sheet for offer submission. Payment terms specify 100% payment via e-mode within 10 days of CRAC and GST treatment per GSTIN reflection, with TDS considerations under Section 194q. A GST/compliance framework is noted, and bidders must adhere to the price basis covering all costs (P&F, freight, insurance, GST). The tender emphasizes supplier eligibility and debarment conditions, plus weight tolerance of ±0.5% for weighable items. Unique factors include alignment to Nalco’s tax and IT compliance obligations and a requirement to quote against the annexed Excel specifications.
Product category: RCBOs with integral overcurrent protection
Standards: IS 12640 (Part 2), IEC 61009-1
Delivery: 120 days from order date
Warranty: 12 months from receipt at Nalco store
Payment: 100% on CRAC via e-mode within 10 days; GST as per GST return
Tax: 0.1% TDS under section 194q if applicable
Weight tolerance: +/- 0.5% at weighbridge
Payment terms specify 100% within 10 days of CRAC via electronic mode
Delivery requirement mandates completion within 120 days of order
GST treatment and IT compliance per Nalco policy with annexed specs
100% payment through e-mode within 10 days of CRAC; GST reflected in GSTR-2A/ANX-2
Complete supply within 120 days of order placement; weighment tolerance ±0.5%
12 months warranty from receipt; adherence to IS 12640 (Part 2) and IEC 61009-1; submit annexure specifications
Eligibility to supply RCBOs meeting IS 12640 (Part 2) / IEC 61009-1
Compliance with Nalco’s GST, TDS, and IT declaration requirements
No debarment or negative-list status as of bid due date
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Central Railway
PUNE, MAHARASHTRA
Central Railway
PUNE, MAHARASHTRA
Central Railway
PUNE, MAHARASHTRA
Central Railway
PUNE, MAHARASHTRA
Uttar Pradesh Power Corporation Limited (uppcl)
Tender Results
Loading results...
GST registration certificate
Permanent Account Number (PAN)
Experience certificates for RCBO or similar electrical protective equipment
Financial statements or turnover proof per Nalco norms
EMD/Security deposit documentation (as applicable per Nalco terms)
Technical bid documents referencing IS 12640 (Part 2) / IEC 61009-1 compliance
OEM authorizations or manufacturer certifications for RCBOs
Quotation against annexed Excel specification annexure
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | BENTEC BHARTIA ENGINEERS PVT LTD Under PMA | ₹1,78,600 | Item Categories : Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 |
| L2 | OM SAI TRADERS Under PMA | ₹2,42,595 | Item Categories : Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 |
| L3 | APIC Under PMA | ₹2,62,059 | Item Categories : Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 |
| L4 | D S ENTERPRISES Under PMA | ₹3,00,467 | Item Categories : Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 |
| L5 | BROSIS TECHNOLOGY Under PMA | ₹5,23,648 | Item Categories : Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 |
Please sign in or create an account to view contract details and download result documents.
Key insights about ODISHA tender market
Bidders must submit GST registration, PAN, experience certificates for RCBO/protective equipment, financial statements, EMD documents, OEM authorizations, and technical bid referencing IS 12640 (Part 2) / IEC 61009-1, along with the annexed Excel specifications. Ensure compliance with Nalco payment terms (100% within 10 days of CRAC) and delivery within 120 days.
Required documents include GST certificate, PAN, experience certificates for RCBO-type equipment, financial statements, EMD proof, technical bid aligned to IS 12640/IEC 61009-1, OEM authorization, and references to annexed Excel specifications for exact quantities and ratings.
RCBOs must comply with IS 12640 (Part 2) and IEC 61009-1. Bidders should reference the annexed Excel specification sheet for ratings, current, breaking capacity, and installation requirements, ensuring compatibility with Nalco smelter store conditions.
Nalco processes 100% payment via e-mode within 10 days of CRAC. GST is released after the seller’s invoice reflects in GSTR-2A. Ensure GST alignment and accurate invoicing to avoid delays.
The complete supply must be delivered within 120 days from order placement. Bidders should plan production, packaging, and shipping accordingly and comply with the weighment tolerance of ±0.5% at the Smelter Plant weighbridge.
Bids from bidders on Nalco’s holiday/negative list are considered ineligible and will not proceed to bid opening or evaluation. Ensure current vendor eligibility and clearance prior to submission.
GST is reimbursed per actuals with invoice reflection; TDS under section 194q may apply at 0.1% on purchases exceeding Rs. 50 lakh in a financial year. Ensure PAN-Aadhaar linkage and proper IT compliance documentation.
Refer to the annexed Excel sheet in the bid document for exact RCBO ratings, current, breaking capacity, and installation instructions. Ensure your bid aligns with those precise values and attach OEM certificates.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS