Progress
The procurement is issued by the Indian Army under the Department Of Military Affairs for multiple components including AVR, ARMATURE ASSEMBLY, MASIBUS PID CONTROLLER, SHAFT, HYDRAULIC PUMP ASSEMBLY, FEED PUMP ASSEMBLY, CONTROL UNIT, BEARING, and ALTERNATOR. The BoQ lists 9 items, but specific quantity and unit details are not disclosed. The tender hints at flexible quantities with a 25% option to increase or decrease at the contracted rates, and delivery timelines tied to the original and extended delivery periods. This procurement targets suppliers capable of delivering complex electromechanical assemblies with military-grade tolerance and compatibility. The absence of explicit specifications suggests bidders should prepare to demonstrate compatibility with listed categories and provide robust BOMs and certifications in line with industry standards. The opportunity comes with unique clause handling quantity adjustments and delivery extensions during contract execution, requiring careful planning on production capacity and logistics.
Delivery quantity may vary by ±25% at contracted rates with minimum 30 days additional time
9 BoQ items across AVR and related components; exact quantities not published
No explicit EMD or payment terms provided; verify during bid submission
No explicit payment terms published; standard defense procurement terms likely apply; bidders should confirm schedule and milestones
Delivery period commences from last date of original delivery order; optioned quantities extend accordingly with minimum 30 days
Not specified in data; defense tenders typically include LDs; bidders should seek exact LD rates and caps during clarification
Experience in supplying electromechanical military-grade assemblies
Ability to provide OEM authorizations and technical compliance certificates
Financial stability evidenced by audited financial statements
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | M T ENTERPRISES Under PMA | - | 05-10-2026 13:38:57 | |
| 2 | M/S ASSAM ENGINEERING WORKS,N.T. ROAD, TEZPUR Under PMA | - | 05-10-2026 12:24:49 | |
| 3 | SHANKAR ELECTRICALS WORKS Under PMA | - | 05-10-2026 11:16:42 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SHANKAR ELECTRICALS WORKS(MSE)( MSE Social Category:General ) Under PMA | Item Categories : AVR,ARMATURE ASSY,MASIBUS PID CONTROLLER,SHAFT,HYDRAULIC PUMP ASSY,FEED PUMP ASSY,CONTROL UNIT,BEAR | |
| L2 | M/S ASSAM ENGINEERING WORKS,N.T. ROAD, TEZPUR (MSE)( MSE Social Category:General ) Under PMA | Item Categories : AVR,ARMATURE ASSY,MASIBUS PID CONTROLLER,SHAFT,HYDRAULIC PUMP ASSY,FEED PUMP ASSY,CONTROL UNIT,BEAR | |
| L3 | M T ENTERPRISES (MSE)( MSE Social Category:General ) Under PMA | Item Categories : AVR,ARMATURE ASSY,MASIBUS PID CONTROLLER,SHAFT,HYDRAULIC PUMP ASSY,FEED PUMP ASSY,CONTROL UNIT,BEAR |
Quantity
9
Category
AVR
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
AVR , ARMATURE ASSY , MASIBUS PID CONTROLLER , SHAFT , HYDRAULIC PUMP ASSY , FEED PUMP ASSY , CONTROL UNIT , BEARING3308 , ALTERNATOR
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Sonitpur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Sonitpur | Sonitpur | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
AVR
AVR
ARMATURE ASSY
ARMATURE ASSY
MASIBUS PID CONTROLLER
MASIBUS PID CONTROLLER
SHAFT
SHAFT
HYDRAULIC PUMP ASSY
HYDRAULIC PUMP ASSY
FEED PUMP ASSY
FEED PUMP ASSY
CONTROL UNIT
CONTROL UNIT
BEARING3308
BEARING3308
ALTERNATOR
ALTERNATOR
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | AVR | AVR | 1 | nos | buybhunia | 15 | |
| 2 | ARMATURE ASSY | ARMATURE ASSY | 1 | nos | buybhunia | 15 | |
| 3 | MASIBUS PID CONTROLLER | MASIBUS PID CONTROLLER | 1 | nos | buybhunia | 15 | |
| 4 | SHAFT | SHAFT | 1 | nos | buybhunia | 15 | |
| 5 | HYDRAULIC PUMP ASSY | HYDRAULIC PUMP ASSY | 1 | nos | buybhunia | 15 | |
| 6 | FEED PUMP ASSY | FEED PUMP ASSY | 1 | nos | buybhunia | 15 | |
| 7 | CONTROL UNIT | CONTROL UNIT | 1 | nos | buybhunia | 15 | |
| 8 | BEARING3308 | BEARING3308 | 1 | nos | buybhunia | 15 | |
| 9 | ALTERNATOR | ALTERNATOR | 1 | nos | buybhunia | 15 |
GST registration certificate
PAN card
Experience certificates for similar electromechanical assemblies
Financial statements (audited or duly certified)
EMD/Security deposit as applicable (not specified here; verify exact amount)
Technical bid documents and BOM detailing for AVR, ARMATURE ASSEMBLY, MASIBUS PID CONTROLLER, etc.
OEM authorizations or manufacturer certifications for critical components
Any standard compliance certificates (if specified in terms)
Key insights about ASSAM tender market
Bidders should submit GST, PAN, experience certificates, financial statements, EMD, OEM authorizations, and technical BOM for AVR, ARMATURE ASSEMBLY, MASIBUS PID CONTROLLER, SHAFT, and related items. Ensure BOM alignment with 9 BoQ items and prepare for quantity adjustment up to 25% with minimum 30 days delivery extension.
Required documents typically include GST certificate, PAN, company financial statements, experience certificates for similar electromechanical procurements, EMD, technical bid with BOM, OEM authorizations, and any IS/ISO certifications specific to the components. Verify exact list during bid submission window.
Delivery extensions follow the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Extensions may apply if the quantity is increased up to 25% during contract execution.
The BoQ lists 9 items spanning AVR, ARMATURE, PID controller, shaft, pumps, control unit, bearing, and alternator. Exact unit quantities are not disclosed publicly; bidders should rely on pre-bid clarification and submit comprehensive BOMs for all items.
Defense tenders usually require OEM authorizations, ISO/IEC certifications, and component-level compliance certificates. Bidders should present traceable material certifications, quality assurance evidence, and conformity to military-grade tolerances for each item listed.
Specific submission deadlines are not provided in the data. Bidder should monitor official communications and tender portals for dates, and promptly prepare financials, BOMs, and compliance certificates to ensure readiness.
Eligibility focuses on prior experience with electromechanical military assemblies, financial stability, GST and PAN validity, and possession of OEM authorizations. Demonstrate capability to meet BOM requirements and provide required certifications for all listed items.
The data does not publish an estimated contract value or EMD amount. Bidders should seek official clarification on EMD, bid security, and total contract value during the inquiry period and pre-bid meetings.