Progress
RAThe procurement focuses on the Department Of Heavy Industry for a SITC of a Large Climatic Chamber with Integration of 6000kgf ED Vibration Shaker located in GURGAON, HARYANA. The scope includes Supply, Installation, Testing, Commissioning, Training of the integrated system. The bid requires an OEM warranty certificate and a 2-year warranty from final acceptance or after installation. Bidder must demonstrate a nationwide service network with established service centres in India. A flexible quantity clause allows ±25% variation with contract rates. Unique delivery timing follows the last date of the original delivery order, with minimum 30 days for extended periods.
Product/service names: SITC of Large Climatic Chamber with Integration of 6000kgf ED Vibration Shaker
Estimated scope indicators: Supply, Installation, Testing, Commissioning, Training
Warranty: 2 years from final acceptance or completion of installation
Certifications: OEM warranty certificates to be submitted at delivery
After-sales: Established service network with centers in India
Quantity flexibility: ±25% at contract rates
Delivery timing: from last date of original delivery order with extended period rules
Warranty: 2-year OEM-backed warranty with on-site service
Not specified in data; bidders should confirm terms in ATC or final bid documents
Delivery begins after original order; extended delivery time calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
Not specified in available information; verify in ATC for LDs or performance penalties
Demonstrated capability to supply turnkey climatic testing chambers with vibration shaker integration
Presence of service centres across India and technicians trained for installation, commissioning, and maintenance
Compliance with OEM warranty provisions and submission of OEM authorization certificates
Start
10-Oct-2026, 7:00 pm
End
13-Oct-2026, 10:00 am
Duration: 63 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
5 Days
OEM Avg. Turnover
600
Past Performance
20 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
SITC of Large Climatic Chamber with Integration of 6000kgf ED Vibration Shaker
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
15-Jan-2026, 11:30 am
Opening Date
15-Jan-2026, 12:00 pm
Extended Deadline
08-Jan-2026, 11:30 am
Opening Date
08-Jan-2026, 12:00 pm
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar SITC of climatic chambers or vibration shaker systems
Audited financial statements for last 2-3 years
EMD submission proof (if required by ATC)
Technical bid documents outlining scope, approach, and schedule
OEM authorizations / dealership certificates
Warranty certificates from OEM
List of service centres in India with locations
Installation, Commissioning & Training plan
Key insights about HARYANA tender market
Bidders should prepare OEM authorization, GST and PAN, and experience certificates for similar SITC projects. Upload OEM warranty certificates, installation and commissioning plans, and service network details. Confirm the scope includes supply, installation, testing, commissioning, and operator training; ensure 2-year warranty coverage.
Required documents include GST registration, PAN, up-to-date financial statements, experience certificates for similar projects, OEM authorization, and technical bid detailing installation plans. Submit OEM warranty certificates and a list of service centres in India with proximity to consignee locations.
The contract requires a 2-year warranty from final acceptance or after installation completion. OEM warranty certificates must accompany delivery. The seller must ensure breakdown rectification during the warranty period and provide after-sales support via a countrywide service network.
The buyer may adjust quantity by up to ±25% at contract rate. Delivery timing starts from the last date of the original order; extended periods apply proportionally with a minimum of 30 days. Additional time follows the specified formula and may extend within contracted rates.
Tender requires a well-established Installation, Commissioning, Training, Troubleshooting, and Maintenance service group in India. Provide service centre locations near consignee destinations and a plan for on-site training and ongoing maintenance support during the warranty and post-warranty periods.
Submit OEM warranty certificates and OEM authorization documents. Ensure the vendor has GST and PAN filings, along with experience certificates for similar SITC projects. Include service centre accreditation, and any industry-specific certifications required by the issuing authority.
Payment terms are not disclosed in the provided data; bidders should obtain explicit terms from the ATC. Expect standard practice to involve milestone-based payments tied to installation, testing completion, and operator training, with potential retention until final acceptance.
Scope includes Supply, Installation, Testing, Commissioning, and Training of operators. Training covers operation procedures, safety, and routine maintenance. The tender requires statutory clearances if any and ensures the contractor can commission the system to meet performance targets at the consignee site.