Tender Notice for Supply Installation Testing and Commission of Air Conditioners 01,Supply Installation Testing and C in BANGALORE, KARNATAKA

Bid Publish Date

28-Feb-2025, 6:05 pm

Bid End Date

21-Mar-2025, 7:00 pm

Progress

Issue28-Feb-2025, 6:05 pm
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

208

Bid Type

Single Packet Bid

Categories 40

Council Of Scientific And Industrial Research (csir) has released a public tender for Supply Installation Testing and Commission of Air Conditioners 01, Supply Installation Testing and Commission of Air Conditioners 02, Supply Installation Testing and Commission of Air Conditioners 03, Supply Installation Testing and Commission of Air Conditioners 04, Supply Installation Testing and Commission of Air Conditioners 05, Supply Installation Testing and Commission of Air Conditioners 06, Supply Installation Testing and Commission of Air Conditioners 07, Supply Installation Testing and Commission of Air Conditioners 08, Supply Installation Testing and Commission of Air Conditioners 09, Supply Installation Testing and Commission of Air Conditioners 10, Supply Installation Testing and Commission of Air Conditioners 11, Supply Installation Testing and Commission of Air Conditioners 12 in BANGALORE, KARNATAKA. Quantity: 208. Submission Deadline: 21-03-2025 19: 00: 00. Download documents and apply online.

Documents 5

GeM-Bidding-7588801.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Supply cum installation of industrial air conditioners

Power Grid Corporation Of India Limited

SAHARANPUR, UTTAR PRADESH

Posted: 10 January 2025
Closed: 14 March 2025
GEM

Custom Bid for Services - Supply Installation Testing Commissioning of two Nos of Cassette Air Con

Oil And Natural Gas Corporation Limited

SOUTH 24 PARGANAS, WEST BENGAL

Posted: 26 February 2025
Closed: 14 April 2025
GEM

Supply, Installation and Commissioning of Package Air Conditioners as per detailed specification

Hindustan Aeronautics Limited (hal)

KORAPUT, ODISHA

Posted: 30 May 2025
Closed: 20 June 2025
GEM

Supply Installation Testing and Commissioning of 8.5TR Ductable Split Air Conditioning Units A,Supp

Centre For Development Of Telematics (c-dot)

BANGALORE, KARNATAKA

Posted: 15 September 2025
Closed: 13 October 2025
GEM

Supply Installation Testing & Commissioning Of Air Conditioning System

State Bank Of India (sbi)

HAMIRPUR, HIMACHAL PRADESH

Posted: 29 January 2025
Closed: 8 February 2025
GEM

Bill of Quantities (BOQ) 12 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Supply Installation Testing and Commission of Air Conditioners 01 VRF Out Door Units 10 HP with minimum 1 or more compressors 1 nos [email protected] 15
2 Supply Installation Testing and Commission of Air Conditioners 02 VRF Indoor Units 4 way Compact Cassette unit Supply of 1.0 Tr capacity 4-way flow VRV/VRF compact cassette type indoor ceiling mounted unit equipped with synthetic washable media pre-filter 5 nos [email protected] 15
3 Supply Installation Testing and Commission of Air Conditioners 03 Installation, Testing and commissioning of 6HP capacity factory built outdoor type air cooled variable refrigerant flow VRF 1 nos [email protected] 15
4 Supply Installation Testing and Commission of Air Conditioners 04 Installation, testing and commissioning of 4 way compact cassette type indoor units complete with panels, turbo fan, cooling coil with suitable rows, electronic expansion valves, air filter, in-built drain pump & insulated drain pan as per standard 1 Tr 5 nos [email protected] 15
5 Supply Installation Testing and Commission of Air Conditioners 05 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 6.4mm dia with tube thickness 1.2 mm with 19mm thick insulation 14 meter [email protected] 15
6 Supply Installation Testing and Commission of Air Conditioners 06 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 9.5mm dia with tube thickness 1.2 mm with 19mm thick insulation 32 meter [email protected] 15
7 Supply Installation Testing and Commission of Air Conditioners 07 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 12.7mm dia with tube thickness 1.2 mm with 19mm thick insulation 14 meter [email protected] 15
8 Supply Installation Testing and Commission of Air Conditioners 08 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 15.86mm dia with tube thickness 1.2 mm with 19mm thick insulation 9 meter [email protected] 15
9 Supply Installation Testing and Commission of Air Conditioners 09 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 22.2mm dia with tube thickness 1.2 mm with 19mm thick insulation 23 meter [email protected] 15
10 Supply Installation Testing and Commission of Air Conditioners 10 Design, Manufacturing, Supply, Installation, Testing and Commission of variable refrigerent flow distribution REFNUTS 4 nos [email protected] 15
11 Supply Installation Testing and Commission of Air Conditioners 11 Supply, Laying, Dressing, Testing and Commssioning of communication cabling 70 meter [email protected] 15
12 Supply Installation Testing and Commission of Air Conditioners 12 Supply and Installation of CPVC for drain water pipe 32mm dia 30 meter [email protected] 15

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Financial Results

Rank Seller Price Item
L1CONCORD AIRCONDITIONING SYSTEMS AND SOLUTIONS( MSE Social Category:ST )    Under PMA₹5,10,875Item Categories : Supply Installation Testing and Commission of Air Conditioners 01,Supply Installation Testing and C
L2AIR CONTROL( MSE Social Category:General )    Under PMA₹5,19,090Item Categories : Supply Installation Testing and Commission of Air Conditioners 01,Supply Installation Testing and C
L3GRAVITY INDIA TECHNOLOGIES PRIVATE LIMITED   Under PMA₹5,37,526Item Categories : Supply Installation Testing and Commission of Air Conditioners 01,Supply Installation Testing and C
L4KHUSHI TECHNOLOGIES   Under PMA₹6,22,404Item Categories : Supply Installation Testing and Commission of Air Conditioners 01,Supply Installation Testing and C

Frequently Asked Questions

Key insights about KARNATAKA tender market

What are the eligibility requirements for participating in the tender?

The eligibility requirements for this tender include being a registered entity, having verifiable experience in HVAC system installation, and compliance with local regulations. Bidders must also provide documentation demonstrating their capability to deliver the specified goods and services.

What kind of certifications are required to bid on this tender?

Bidders must possess relevant technical certifications that confirm their ability to supply, install, and maintain air conditioning systems. Compliance with quality standards and safety regulations is critical, and certificates should be submitted alongside the tender application.

How do I submit my bid for the tender?

Bids must be submitted electronically through the GeM platform. Participants should follow the submission guidelines provided on the platform to ensure all necessary documents are filed correctly and on time. Detailed instructions can be found on the official government e-marketplace website.

What payment terms can be expected for this tender?

Payment terms for this tender will typically include milestones based on the completion of specific phases of the project, such as delivery, installation, and testing. Detailed terms and conditions will be outlined in the tender documents.

Are there any benefits provided to MSEs or startups?