TenderDekho Logo
GEM

Goa Shipyard Limited Lub Oil & Miscellaneous Materials Tender Goa 2026 ISO/IS standards

Bid Publish Date

20-Jun-2026, 3:31 pm

Bid End Date

11-Jul-2026, 6:00 pm

EMD

₹20,000

Generate Docs

Progress

Issue20-Jun-2026, 3:31 pm
Corrigendum01-Jul-2026
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1479

Category

LUB OIL 1

Bid Type

Two Packet Bid

Key Highlights

  • Exact EMD amount: ₹20,000
  • Quantity flex: +/- 25% during contract and currency
  • Delivery time computation: minimum 30 days for extended periods
  • Organization: Goa Shipyard Limited, Department Of Defence Production
  • Location: South Goa, Goa 403105
  • Categories: LUB OIL series 1-24, QCV 1-11, CO, MISC 01-34
  • ATC: Buyer added terms; ATC document uploaded

Categories 35

Tender Overview

Goa Shipyard Limited invites bids for multiple lubricant oil categories (LUB OIL 1–24) and miscellaneous items (MISC 01–34) along with QCV and CO classifications, located in South Goa, Goa. Estimated value not disclosed; EMD is ₹20,000. BoQ lists 70 items but provides no unit quantities or technical specs. The tender emphasizes flexible quantity adjustments up to 25%, with extension logic tied to the original delivery period and extended period, plus guidance on delivery time calculations. This creates a dynamic procurement where bidders must prepare for potential order variances within contracted rates.

Technical Specifications & Requirements

  • No explicit technical specifications are provided in the tender data. The scope includes broad categories: LUB OIL series (1 to 24), QCV 1–10, CO, and MISC 01–34. The absence of itemized BOQ quantities or unit measures necessitates reliance on organization-provided ATC and ATC-uploaded documents. Key visible terms include a 25% quantity option and a requirement to adhere to the option-based delivery schedule. Bidders should prepare for standard lubricant supply practices, with emphasis on timely delivery and compliance with any future technical annexures.
  • The limited data implies typical government lubricant supply standards may apply, and bidders should verify OEM approvals, packaging, and compatibility with GOA shipyard operations. The absence of explicit standards underscores the need to reference seller’s certifications in the technical bid and to attach OEM authorizations when required.

Terms, Conditions & Eligibility

  • EMD: ₹20,000. Submit online or via demanded form.
  • Quantity adjustments: Up to 25% increase/decrease during contract; extended delivery time calculated as (Increased quantity/Original quantity) × Original delivery period, minimum 30 days.
  • Delivery schedule: from last date of original delivery order; option-based extensions allowed.
  • Compliance: bidders must follow ATC documents and fulfill all general tender submission requirements, including GST and PAN where applicable.
  • Documentation: ensure OEM authorizations and relevant certifications are included; bidder must comply with all Buyer Added Terms and any ATC stipulations.

Key Specifications

  • Lubricant oil categories include LUB OIL 1–24

  • QCV 1–11 and CO categories listed

  • MISC 01–34 miscellaneous items

  • EMD: ₹20,000

  • Option clause allowing ±25% quantity change

  • Delivery schedule aligned to last order date with extended period rules

Terms & Conditions

  • EMD amount and submission details

  • 25% quantity option and related delivery extension

  • ATC documents and OEM authorizations requirement

Important Clauses

Payment Terms

Not disclosed beyond standard tender terms; adhere to Buyer Added Terms and contract-specific payment schedule

Delivery Schedule

Delivery commences from last date of original delivery order; extended time formula applies with minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated; subject to Buyer Added Terms and contract provisions

Bidder Eligibility

  • Experience in supplying lubricant oils or similar MRO products to government/defence entities

  • Financial capability to handle 25% quantity fluctuations

  • Compliance with GST, PAN, and OEM authorization requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

LUB OIL 1 , LUB OIL 2 , LUB OIL 3 , LUB OIL 4 , LUB OIL 5 , LUB OIL 6 , LUB OIL 7 , LUB OIL 8 , LUB OIL 9 , LUB OIL 10 , LUB OIL 11 , LUB OIL 12 , LUB OIL 13 , LUB OIL 14 , LUB OIL 15 , LUB OIL 16 , LUB OIL 17 , LUB OIL 18 , LUB OIL 19 , LUB OIL 20 , LUB OIL 21 , LUB OIL 22 , LUB OIL 23 , LUB OIL 24 , QCV 1 , QCV 2 , QCV 3 , QCV 4 , QCV 5 , QCV 6 , QCV 7 , QCV 8 , QCV 9 , QCV 10 , QCV 11 , CO , MISC 01 , MISC 02 , MISC 03 , MISC 04 , MISC 05 , MISC 06 , MISC 07 , MISC 08 , MISC 09 , MISC 10 , MISC 11 , MISC 12 , MISC 13 , MISC 14 , MISC 15 , MISC 16 , MISC 17 , MISC 18 , MISC 19 , MISC 20 , MISC 21 , MISC 22 , MISC 23 , MISC 24 , MISC 25 , MISC 26 , MISC 27 , MISC 28 , MISC 29 , MISC 30 , MISC 31 , MISC 32 , MISC 33 , MISC 34

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

South Goa

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-South GoaSouth Goa--4030-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9498365.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 70 Items Sign in for GEM prices

#1

LUB OIL 1

Seamless steel pipe 15 NB

40 mtr Delivery: 30 days
#2

LUB OIL 2

Seamless steel pipe 20 NB

100 mtr Delivery: 30 days
#3

LUB OIL 3

Seamless steel pipe 32 NB

18 mtr Delivery: 30 days
#4

LUB OIL 4

Seamless steel pipe 32 NB

15 mtr Delivery: 30 days
#5

LUB OIL 5

90 deg Elbow for 20 NB

20 nos Delivery: 30 days
#6

LUB OIL 6

90 deg Elbow for 15 NB

20 nos Delivery: 30 days
#7

LUB OIL 7

90 deg Elbow for 32 NB

10 nos Delivery: 30 days
#8

LUB OIL 8

Union Coupling suitable for pipe 15 NB

10 nos Delivery: 30 days
#9

LUB OIL 9

Union Coupling suitable for pipe 20 NB

15 nos Delivery: 30 days
#10

LUB OIL 10

Male stud union coupling suitable for pipe 21point 3 x 2 point 77

6 nos Delivery: 30 days
#11

LUB OIL 11

Male stud union coupling suitable for pipe 26 point 7x 2 point 87

4 nos Delivery: 30 days
#12

LUB OIL 12

Male stud union coupling suitable for pipe 42 point 4 x 2 point 6

4 nos Delivery: 30 days
#13

LUB OIL 13

MS flanges drg no 2092030000 32 NB

8 nos Delivery: 30 days
#14

LUB OIL 14

MS flanges drg no 2092030000 20 NB

10 nos Delivery: 30 days
#15

LUB OIL 15

MS flanges drg no 2092030000 15 NB

6 nos Delivery: 30 days
#16

LUB OIL 16

Natural Cellulosic Fibre Gaskets drg no 2092230000 32 NB

5 nos Delivery: 30 days
#17

LUB OIL 17

Natural Cellulosic Fibre Gaskets drg no 2092230000 20 NB

7 nos Delivery: 30 days
#18

LUB OIL 18

Natural Cellulosic Fibre Gaskets drg no 2092230000 15 NB

5 nos Delivery: 30 days
#19

LUB OIL 19

Equal TEE butt weld seamless type 15 NB

2 nos Delivery: 30 days
#20

LUB OIL 20

Reducer butt weld seamless type 20 NB to 15 NB

1 nos Delivery: 30 days
#21

LUB OIL 21

Reducer butt weld seamless type 32 NB to 20 NB

1 nos Delivery: 30 days
#22

LUB OIL 22

Full bore Ball valve screwed BSP female end

2 nos Delivery: 30 days
#23

LUB OIL 23

Full bore Ball valve flange end DIN ND 10 std

1 nos Delivery: 30 days
#24

LUB OIL 24

SS Bolt and Nuts M12x 60

90 nos Delivery: 30 days
#25

QCV 1

Union Coupling suitable for pipe 12x1

50 nos Delivery: 30 days
#26

QCV 2

Union Coupling suitable for pipe 8x1

50 nos Delivery: 30 days
#27

QCV 3

Male stud union coupling suitable for pipe 8x1

20 nos Delivery: 30 days
#28

QCV 4

Union TEE suitable for pipe 8x1

15 nos Delivery: 30 days
#29

QCV 5

Reducing union for 8x1 pipe to 12x1 pipe

10 nos Delivery: 30 days
#30

QCV 6

Union BHD DK suitable for pipe 8x1

10 nos Delivery: 30 days
#31

QCV 7

Union BHD DK suitable for pipe 8x1

3 nos Delivery: 30 days
#32

QCV 8

Union BHD DK suitable for pipe 8x1

4 nos Delivery: 30 days
#33

QCV 9

Union BHD DK suitable for pipe 12x1

16 nos Delivery: 30 days
#34

QCV 10

Hyd type pipe clamps for 12 OD pipe

90 nos Delivery: 30 days
#35

QCV 11

Hyd type pipe clamps for 8 OD pipe

90 nos Delivery: 30 days
#36

CO

Hyd type pipe clamps for 6 OD pipe

150 nos Delivery: 30 days
#37

MISC 01

20 litrs Air Bottle

1 nos Delivery: 30 days
#38

MISC 02

6 litrs Air Bottle

1 nos Delivery: 30 days
#39

MISC 03

Ball Valve Female BSP Screwed end pipe 10x1 mm

5 nos Delivery: 30 days
#40

MISC 04

Male stud Union Connector for pipe 10x1 mm

10 nos Delivery: 30 days
#41

MISC 05

Reducing Union Connector for pipe 10x1 mmx 6 OD pipe

6 nos Delivery: 30 days
#42

MISC 06

21 point 3 x 2point 77 Seamless steel pipe

36 mtr Delivery: 30 days
#43

MISC 07

Ball Valve Female BSP Screwed end pipe

4 nos Delivery: 30 days
#44

MISC 08

Male stud Union Connector for pipe 21 point 3 x 2 point 77

8 nos Delivery: 30 days
#45

MISC 09

Union Coupling suitable for pipe 21 point 3 x 2 point 77

20 nos Delivery: 30 days
#46

MISC 10

114 point 3 x 2 point 6 Seamless SS pipe

30 mtr Delivery: 30 days
#47

MISC 11

42 point 4 x 2 Seamless SS pipe

12 mtr Delivery: 30 days
#48

MISC 12

48 point 3 x 2 Seamless SS pipe

12 mtr Delivery: 30 days
#49

MISC 13

Slip on flanges GSL drg no 2092030000

30 nos Delivery: 30 days
#50

MISC 14

Slip on flanges GSL drg no 2092030000

12 nos Delivery: 30 days
#51

MISC 15

Natural Cellulosic Fibre Gaskets drg no 2092230000 sheet no 2/3 DIN ND 10 STD

25 nos Delivery: 30 days
#52

MISC 16

90 deg seamless bends elbow pipe 60 point 3 x 2

10 nos Delivery: 30 days
#53

MISC 17

90 deg seamless bends elbow pipe114 point 3 x 2 point 6

20 nos Delivery: 30 days
#54

MISC 18

90 deg seamless bends elbow Pipe168 point 3 x 3 point 2

9 nos Delivery: 30 days
#55

MISC 19

BHD/DK pieces GSL drg no 209212880350

8 nos Delivery: 30 days
#56

MISC 20

Union Coupling 42 point 4 x 2 point 6 pipe

10 nos Delivery: 30 days
#57

MISC 21

Slip on flanges GSL drg no 2092030000

40 nos Delivery: 30 days
#58

MISC 22

Slip on flanges GSL drg no 2092030000

40 nos Delivery: 30 days
#59

MISC 23

Slip on flanges GSL drg no 2092030000

6 nos Delivery: 30 days
#60

MISC 24

Slip on flanges GSL drg no 2092030000

20 nos Delivery: 30 days
#61

MISC 25

90 deg seamless bends elbow 114 x 5 point 0 butt weld R 1 D

40 nos Delivery: 30 days
#62

MISC 26

90 deg seamless bends elbow 114 x 5 point 0 butt weld R 1point5 D

10 nos Delivery: 30 days
#63

MISC 27

Slip on flanges GSL drg no 2092030000

20 nos Delivery: 30 days
#64

MISC 28

Seamless Equal tee 100-100-100 thk 5 mm pipe 114x 5 point0

25 nos Delivery: 30 days
#65

MISC 29

BHD/DK pieces GSL drg no 2092180000

15 nos Delivery: 30 days
#66

MISC 30

Slip on flanges GSL drg no 2092030000

15 nos Delivery: 30 days
#67

MISC 31

88 point 9 x 6 point 0 Seamless SS 316 L pipe

24 mtr Delivery: 30 days
#68

MISC 32

Slip on flanges GSL drg no 2092030000

12 nos Delivery: 30 days
#69

MISC 33

Natural Cellulosic Fibre Gaskets drg no 2092230000

20 nos Delivery: 30 days
#70

MISC 34

90 deg seamless bends elbow 88 point 9 x 6 point 0

15 nos Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for lubricant oil supplies

4

Financial statements (last 2 years)

5

EMD submission proof (₹20,000)

6

Technical bid documents and compliance statements

7

OEM authorizations (if required by ATC)

Corrigendum Updates

1 Update
#1

Update

01-Jul-2026

Extended Deadline

07-Jul-2026, 4:00 pm

Opening Date

07-Jul-2026, 4:30 pm

Frequently Asked Questions

Key insights about GOA tender market

How to bid for lubricant oil tender in Goa Shipyard Limited 2026?

Bidders must meet eligibility by providing GST, PAN, and financial statements, plus EMD of ₹20,000. Prepare OEM authorizations if required, attach technical compliance documents, and reference the Buyer's ATC. Include your delivery capacity for a potential 25% quantity increase and confirm alignment with delivery extension rules.

What documents are required for the Goa lubricant tender in South Goa?

Submit GST certificate, PAN card, two-year financial statements, experience certificates for similar oil supply, EMD proof of ₹20,000, technical bid with compliance notes, and OEM authorizations if mandated by ATC. Ensure digital submission adheres to portal requirements and includes all requested attachments.

What are the delivery terms for Goa Shipyard lubricant procurement?

Delivery starts from the last date of the original order; if quantity increases by up to 25%, calculate extended delivery time as (increased/original quantity) × original delivery period, with a minimum 30 days. The purchaser may extend within contracted rates per option clause.

What standards or certifications are needed for oil supplies in this tender?

The tender data lists no explicit standards; bidders should anticipate standard lubricant industry practices and attach OEM certifications and any IS/ISO compliance in the technical bid as per ATC guidance.

How is the EMD amount for this procurement in Goa calculated?

The EMD amount is fixed at ₹20,000. Submit proof of payment or online remittance with bidder credentials and ensure it is valid at the time of bid submission to avoid disqualification.

What is the scope of items in the tender for LUB OIL categories?

The scope includes LUB OIL 1 through LUB OIL 24, QCV 1–11, CO, and MISC 01–34 categories. BoQ lists 70 items; however, quantities are not disclosed in the available data, requiring bidders to confirm unit measures in the ATC annexures.