Bid Publish Date
08-Jul-2026, 10:29 am
Bid End Date
22-Jul-2026, 11:00 am
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
Indian Oil Corporation Limited seeks agency support for overhauling and maintenance of Gardner Denver Engineered Products India Pvt Ltd make dryer blowers 72/73-K-502A/B installed in the Paradip Refinery PP unit. The contract spans 24 months from site handover with a possible extension of 12 months at the same rate. This is a Domestic single bid through GeM, with documents downloadable during the GeM window; bids limited to the authorized Gardner Denver supplier. The scope centers on repair, maintenance, and installation activities for critical dryer blowers in a refinery setting.
Gardner Denver 72/73-K-502A/B dryer blowers
Overhaul/maintenance within Paradip Refinery PP unit
Contract duration: 24 months with optional 12-month extension, same rate
Domestic single-bid process via GeM; EMD not applicable
OEM-specific supplier eligibility: Gardner Denver Engineered Products India Pvt Ltd only
24-month site handover contract with 12-month extension option at same rate
GeM portal submission only; EMD not applicable
Only Gardner Denver OEM supplier eligible for bid evaluation
Not specified in the Buyer Added Terms; payment terms to be defined in GeM tender documents
Contract valid for 24 months from site handover; extension up to 12 months at IOCL discretion at same rate
No LD details provided in terms; penalties, if any, would be defined in GeM tender terms
Authorized Gardner Denver OEM supplier only
Domestic bidding configured; single bid system
Must submit via GeM within scheduled window
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; overhauling OR maintenance of Ms Gardner Denver Engineered Products India Pvt Ltd make dryer blowers 72,73-K-502A,B installed in PP unit Paradip Refinery..
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
42
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Jagatsinghapur
Delivery Pincodes
754141
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Avijit Sahoo | 754141,IOCL Paradip Refinery ,Administrative Building, Post- Jhimani ,Via-Kujang Dist- Jagatsinghpur Odisha | Jagatsinghapur | Odisha | 754141 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumables /Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
22-Jul-2026, 11:00 am
Opening Date
22-Jul-2026, 11:30 am
Key insights about ODISHA tender market
Bidders must participate through the GeM portal, ensure OEM authorization from Gardner Denver India, and confirm eligibility as the sole OEM supplier. The contract spans 24 months with a possible 12-month extension at the same rate; review the GeM schedule for opening dates and required documents.
GeM tender requires vendor registration, OEM authorization from Gardner Denver, and company credentials. Since EMD is not applicable, focus on technical compliance certificates, financial stability documents, and prior experience in overhauling similar equipment, if referenced in GeM terms.
Technical scope includes overhauling 72/73-K-502A/B blowers installed in Paradip PP unit. OEM-specific procedures and tools must be used; ensure availability of Gardner Denver spare parts and adherence to service manuals for reliable performance during ARC/AMC.
Submission deadline is governed by the GeM schedule. bidders should monitor GeM portal for the exact last date and time; late submissions are not accepted, and only the OEM supplier submission is considered.
The base contract runs 24 months from site handover with an option to extend for 12 months on IOCL discretion at the same rate and terms; extension is subject to refinery needs and performance alignment with Gardner Denver standards.
Engagement requires Gardner Denver OEM capabilities; use of Gardner Denver service procedures and parts is expected; no ISO/industry standard is explicitly stated, but OEM compliance and refinery safety practices are implied.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS