TenderDekho Logo
GEM

East Central Railway Propeller Type AC Ventilating Fans Tender IS 2312 2026

Bid Publish Date

02-Feb-2026, 11:36 am

Bid End Date

28-Feb-2026, 9:00 am

Latest Corrigendum Available

Progress

Issue02-Feb-2026, 11:36 am
Corrigendum21-Feb-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

48

Category

Propeller Type AC Ventilating Fans - Exhaust Fans (V2) as per IS 2312

Bid Type

Single Packet Bid

Key Highlights

  • ISI marked safety and IS 2312 compliance required for exhaust fans
  • 25% quantity variation rights during contract and currency with proportional delivery extension
  • Scope limited to supply of goods; no installation or services described
  • ATC/terms specify bidder must adhere to option clause and delivery calculations
  • Warranty period to be defined under standards; ISI certification mandatory
  • No BOQ items listed; precise technical specs must be drawn from IS 2312 and ISI marks
  • No location or start/end dates provided in the tender data

Categories 1

Tender Overview

Organization: East Central Railway (Indian Railways) seeks supply of Propeller Type AC Ventilating Fans - Exhaust Fans (V2) as per IS 2312. Scope: Supply of Goods only with no BOQ items listed. The tender emphasizes ISI marked status and IS 2312 alignment. The tender references a flexible quantity clause allowing up to 25% quantity variation during contract and extended delivery timelines with a minimum of 30 days, based on the option formula. Location details are not specified in the available data.

Technical Specifications & Requirements

  • Product category: Propeller type AC ventilating/exhaust fans (V2) conforming to IS 2312 and ISI marked.
  • Generic specs covered: fan size (mm), number of poles (Nos.), number of blades, speed regulator, rated voltage, and insulation class.
  • Construction/Enclosure: type of fan, insulation class, and provision of guards as applicable.
  • Warranty: warranty period to be stated in terms and conditions; ISI compliance is mandatory.
  • Additional specifics such as exact size, pole count, blade count, and voltage are not detailed in the data; bidders must rely on IS 2312 ISI criteria and purchaser’s ATC terms.

Terms, Conditions & Eligibility

  • Scope of supply: Bid price must include all cost components for supply of goods only.
  • Option clause: Purchaser reserves right to increase/decrease quantity up to 25% at contracted rates and extend delivery period proportionally with a minimum of 30 days.
  • Delivery timeline references originate from the last date of original delivery order; extended periods follow the same proportional rule. Eligibility requires compliance with these option terms.
  • Other terms/EMD details are not explicitly provided in the data.

Key Specifications

  • Product: Propeller Type AC Ventilating Fans - Exhaust Fans (V2)

  • Standards: IS 2312; ISI marked

  • Key items to confirm in bid: size (mm), poles (Nos.), blades, speed regulator, rated voltage, insulation class

  • Construction: Type of Fan; insulation class; enclosing guards

  • Warranty: indicated in contract terms; precise years to be stated

  • Delivery: governed by option clause; 30+ day minimum extension

  • BoQ: No items listed in current BOQ information

Terms & Conditions

  • EMD amount and payment terms not specified in data

  • Option clause allows ±25% quantity variation with proportional delivery extension

  • Supply scope limited to goods; no installation service described

  • ISI marking and IS 2312 standard conformance required

Important Clauses

Option Clause

Purchaser may increase/decrease quantity by up to 25% at contracted rates; delivery extension calculated as (additional/original quantity) × original delivery period, minimum 30 days.

Delivery Schedule

Delivery period starts from last date of original delivery order; extended periods follow proportional rule; bidder must comply.

Payment Terms

Not explicitly stated in data; ATC indicates supply of goods only; bidder should assume standard government terms unless ATC specifies.

Bidder Eligibility

  • Experience in supplying ISI marked propeller fans or similar exhaust fans

  • Evidence of financial capability to handle procurement scale

  • Compliance with ISI/ISI marks and IS 2312 standard requirements

Documents 5

GeM-Bidding-8894815.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

CATALOG-Specification-2

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Propeller Type AC Ventilating Fans - Exhaust Fans (V2) as per IS 2312,Propeller Type AC Ventilating

North Eastern Railway

LUCKNOW, UTTAR PRADESH

Posted: 21 January 2025
Closed: 4 February 2025
GEM

Propeller Type AC Ventilating Fans - Exhaust Fans (V2) as per IS 2312,Propeller Type AC Ventilating

Munitions India Limited

CHANDRAPUR, MAHARASHTRA

Posted: 29 March 2025
Closed: 8 April 2025
GEM

Propeller Type AC Ventilating Fans - Exhaust Fans (V2) as per IS 2312,Propeller Type AC Ventilating

Western Coalfields Limited

CHANDRAPUR, MAHARASHTRA

Posted: 2 February 2025
Closed: 24 February 2025
GEM

Propeller Type AC Ventilating Fans - Exhaust Fans (V2) as per IS 2312,Propeller Type AC Ventilating

Kochi Metro Rail Limited

ERNAKULAM, KERALA

Posted: 25 April 2025
Closed: 16 May 2025
GEM

Propeller Type AC Ventilating Fans - Exhaust Fans (V2) as per IS 2312,Propeller Type AC Ventilating

Bharat Heavy Electricals Limited (bhel)

BHOPAL, MADHYA PRADESH

Posted: 21 May 2025
Closed: 31 May 2025
GEM

Technical Specifications 2 Items

Item #1 Details

View Catalog
Category Specification Requirement
STANDARD ISI Marked Product YES Or higher
GENERIC Size of fan (in mm) 300.0
GENERIC Number of pole (in Nos.) 6.0
GENERIC Number of blades 3
GENERIC Speed regulator Yes, No Or higher
GENERIC Rated voltage 230 V, 50 HZ, AC, Single Phase
CONSTRUCTION Type of Fan Non-Capacitor Type
CONSTRUCTION Class of insulation Class E
ENCLOSURES Provision of Guards for Without Guard
CERTIFICATION Warranty period (in Years) 1, 2 Or higher

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar propeller type AC ventilating fans supply

4

Financial statements or proof of financial capacity

5

EMD submission document (amount not specified in data)

6

Technical bid demonstrating ISI mark and IS 2312 compliance

7

OEM authorization or manufacturer credentials

Corrigendum Updates

2 Updates
#1

Update

21-Feb-2026

Extended Deadline

28-Feb-2026, 9:00 am

Opening Date

28-Feb-2026, 9:30 am

#2

Update

14-Feb-2026

Extended Deadline

21-Feb-2026, 9:00 am

Opening Date

21-Feb-2026, 9:30 am

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for East Central Railway propeller fans tender in 2026

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD as per ATC; ensure ISI marked, IS 2312 compliant exhaust fans, and provide OEM authorizations. The scope is goods supply only; delivery terms follow the 25% quantity variation clause with minimum 30 days extended period.

What documents are required for ISI marked exhaust fan bid in Railways

Required documents include GST registration, PAN card, experience certificates for similar supply, financial statements, EMD, technical bid proving ISI/IS 2312 compliance, and OEM authorization. ATC may specify additional bidder qualifications; ensure ISI marking and IS 2312 standard conformance.

What are the technical specifications for ISI marked fans in this tender

Technical scope covers propeller type AC ventilating fans (V2) as per IS 2312; key specs include fan size (mm), number of poles, blade count, speed regulator, rated voltage, insulation class, and guards. Specific measurements are not listed in data; compliance with ISI and IS 2312 is mandatory.

When is delivery expected under the option clause for quantity changes

Delivery shifts with quantity changes up to 25% and uses a pro-rata calculation: (additional quantity ÷ original quantity) × original delivery period, minimum 30 days; if original period is under 30 days, the extension matches the original period.

What is the scope of supply for the East Central Railway fans tender

Scope is strictly the supply of goods; installation or services are not included per Bidder Added Terms. Bid price should cover all cost components for delivering the exhaust fans to the railway procurement location as per ISI standards.

What standards and certifications are mandatory for bidder eligibility

Bidders must provide ISI marked exhaust fans conforming to IS 2312; proof of ISI certification and product conformance is required, along with OEM authorizations and relevant experience certificates showing similar supply experience.