TenderDekho Logo
Closed GEM

Hmt Limited Electric Motors Tender Aurangabad Maharashtra 11KW IE3 15HP IE3 3.7KW IE3 1.5KW IE3 2026

Bid Publish Date

07-Sep-2026, 7:43 pm

Bid End Date

17-Sep-2026, 8:00 pm

EMD

₹250

Value

₹9,06,650

Progress

Issue07-Sep-2026, 7:43 pm
AwardPending

Tender Overview

Organization: Hmt Limited, Department of Heavy Industry, seeking IE3 grade electric motors across multiple ratings: 11KW/15HP, 3.7KW/5HP, and 1.5KW/2HP as per drawings and Enquiries MD881417/MD881420/MD881661. Location: Aurangabad, Maharashtra 423701. Estimated value: ₹906,650 with an EMD of ₹250. Scope centers on supplying motors per enquiry drawings; ensure conformity to the stated drawings and supply in line with purchaser’s testing. Acknowledge option clause for quantity adjustments up to 25% during contract.

Technical Specifications & Requirements

  • Product category: Electric motors (11KW/15HP IE3; 3.7KW/5HP IE3; 1.5KW/2HP IE3) as per drawings and Enquiries MD881417, MD881420, MD881661.
  • Delivery & testing: Material must match enquiry and drawings; any deviation triggers replacement and potential deduction from final payment; material tested in buyer’s lab; results are sole acceptance criteria.
  • ATC/ATC1 terms: 45-day payment terms; non-compliance leads to disqualification; seal and sign tender documents; deviations during technical evaluation may lead to rejection.
  • Penalties: Liquidated damages at 0.5% of total value per week for late delivery; quantity may be adjusted up to 25% during contract without cost changes; supplier must be solvent and not in liquidation.
  • Warranty & compliance: Ensure OEM/brand alignment with drawings; material tested and conforming to enquiry; deviations may lead to returns.

Terms, Conditions & Eligibility

  • EMD: ₹250 required as bid security.
  • Delivery penalties: 0.5% per week for delays; maximum duration governed by option quantity adjustments up to 6 months without extra cost.
  • Payment terms: 45 days from delivery for final settlement.
  • Documentation: Tender requires seal, sign, and certificates; materials tested in buyer lab; deviations noted in technical bid to prevent penalties.
  • Eligibility: Bidder must avoid liquidation or bankruptcy; must comply with drawings and enquiry specifications; formal replacement for any non-conforming material.
  • Quantity flexibility: Purchaser may increase/decrease material quantity by up to 25% during contract and extend delivery period accordingly.

Key Specifications

    • Product names: Electric motors matching IE3 efficiency class
    • Ratings: 11KW/15HP, 3.7KW/5HP, 1.5KW/2HP as per drawings
    • Standards: IE3 efficiency requirement; drawings MD881417/MD881420/MD881661
    • Delivery terms: 45-day payment terms; 0.5% weekly LD for delays
    • Quality: Material Test Certificate (MTC) to be provided; buyer lab to determine acceptance
    • Quantity flexibility: Up to 25% quantity variation during/after order
    • Penalties: Replacement for deviations; payments adjusted for non-conforming items

Terms & Conditions

  • EMD ₹250 and full bid security with seal and signature

  • 45 days payment terms; LD at 0.5% per week for delays

  • Quantity variation up to 25% during contract; must meet drawings and MD specifications

Important Clauses

Payment Terms

Payment due within 45 days after delivery; deviations may impact final payment deductions

Delivery Schedule

Delivery period starts after final order; option to extend per 25% quantity variation rules

Penalties/Liquidated Damages

0.5% of total value per week for late delivery; material deviations trigger replacement and payment deductions

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Must comply with drawings and Enquiries MD881417/MD881420/MD881661

  • Must provide Material Test Certificate and OEM authorizations if required

Authority & Contact

Tender Data

Bid Details

Quantity

32

Category

ELECTRIC MOTOR 11KW or 15HP IE3 as per drawing and Enquiry MD881417

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

4

Past Performance

50 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

ELECTRIC MOTOR 11KW or 15HP IE3 as per drawing and Enquiry MD881417 , ELECTRIC MOTOR 3.7KW or 5HP IE3 as per drawing and Enquiry MD881420 , ELECTRIC MOTOR 1.5KW or 2HP IE3 as per drawing and Enquiry MD881661 , X DUMMY , Y DUMMY

Advisory Bank

HDFC Bank

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Aurangabad

Delivery Pincodes

431006

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
MOHANPRABHU M431006,H2,MIDC,ChikalthanaAurangabadMaharashtra4310061015-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9859603.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

ELECTRIC MOTOR 11KW or 15HP IE3 as per drawing and Enquiry MD881417

ELECTRIC MOTOR 11KW or 15HP IE3 as per drawing and Enquiry MD881417

10 nos Delivery: 15 days
#2

ELECTRIC MOTOR 3.7KW or 5HP IE3 as per drawing and Enquiry MD881420

ELECTRIC MOTOR 3.7KW or 5HP IE3 as per drawing and Enquiry MD881420

10 nos Delivery: 15 days
#3

ELECTRIC MOTOR 1.5KW or 2HP IE3 as per drawing and Enquiry MD881661

ELECTRIC MOTOR 1.5KW or 2HP IE3 as per drawing and Enquiry MD881661

10 nos Delivery: 15 days
#4

X DUMMY

X DUMMY

1 nos Delivery: 15 days
#5

Y DUMMY

Y DUMMY

1 nos Delivery: 15 days

Categories 3

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience Certificates for similar motor supply

4

Financial Statements (latest auditor-ready)

5

EMD submission document (₹250) via approved mode

6

Technical Bid indicating compliance with drawings/MD881417/MD881420/MD881661

7

OEM Authorization / Manufacturer Proforma (if not manufacturer)

8

Material Test Certificates (MTC) to accompany supply

9

Seal and sign in tender documents as required

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for IE3 electric motors tender in Aurangabad?

Bidders must submit GST, PAN, experience certificates, financials, EMD ₹250, and a technical bid citing compliance with drawings MD881417/MD881420/MD881661. Include Material Test Certificate and OEM authorizations. Ensure 45-day payment terms and 0.5% weekly LD for late delivery.

What documents are required for Hmt Limited motor tender in Maharashtra?

Required documents include GST certificate, PAN, experience certificates for similar motor supply, latest financial statements, EMD submission, technical bid with drawings compliance, OEM authorization if applicable, and Material Test Certificates to accompany supply.

What are the key technical specifications for IE3 motors tender in Aurangabad?

Motors must meet IE3 efficiency per drawings MD881417/MD881420/MD881661; rated 11KW/15HP, 3.7KW/5HP, and 1.5KW/2HP; MTC to be provided; deviations lead to replacement and payment deductions.

What is the payment term and LD in this Maharashtra motor tender?

Payment terms are 45 days from delivery; late deliveries incur liquidated damages at 0.5% per week of the total contract value.

How is quantity variation handled in this Hmt Limited motor contract?

Purchaser may increase or decrease quantity up to 25% of bid/contract quantity; extended delivery period calculated based on the variation with a minimum 30 days.

What happens if deviations are found in motor materials?

Materials with deviations will be rejected; replacement will be demanded; final payment may be reduced for deviations observed during technical evaluation or testing.

Are OEM authorizations required for this electric motor procurement?

An OEM authorization is required if the bidder is not the original manufacturer; ensure drawings compliance and provide authorizations with technical bid.

What standards must be satisfied for the Aurangabad motor tender?

Motors must be IE3 compliant as per the drawings; ensure Material Test Certificates and compliance with the specific MD enquiry drawings to avoid rejection.