The Urban Development And Housing Department Bihar invites bids for a Tricycle or Rickshaw for Carrying Goods (V2) in GAYA, BIHAR 804403. The tender requires bidders to supply, install, test and commission the goods, with an EMD of ₹50,000. An option clause allows quantity variations up to 25% of bid quantity both at order and during the contract, with delivery extension rules linked to the original delivery period and extended periods. The bid emphasizes turnover criteria and OEM/MANUFACTURER authorization. This opportunity targets suppliers capable of end-to-end delivery and post-award support within the stated logistics framework.
Key Term 1: 25% quantity option and extended delivery provisions
Key Term 2: EMD amount of ₹50,000 and security deposit terms
Key Term 3: OEM/Manufacturer authorization required with bid
No explicit payment schedule in data; bidders should anticipate standard government terms aligned with Supply, Installation, Testing and Commissioning contracts and verify in the bid document
Delivery period commences from the last date of original delivery order; extended time formula applies for option quantity changes, minimum 30 days
Not specified in provided data; bidders should confirm LD/penalty terms in the final RFP
Not under liquidation, court receivership, or bankruptcy
ABID must include turnover evidence for last 3 years (bidder and OEM)
OEM authorization required if bidding via distributor or service provider
Quantity
170
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
30
OEM Avg. Turnover
100
Past Performance
20 %
Warranty Period
1 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Tricycle or Rickshaw for Carrying Goods (V2) (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
2%
ePBG Duration (Months)
14
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Gaya
Delivery Pincodes
823001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shashi Kant | 823001,NEAR KEDARNATH MARKET GAYA | Gaya | Bihar | 823001 | 170 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate indicating turnover
Experience certificates for similar projects
OEM authorization / Manufacturer authorization
EMD submission proof (DD/online payment receipt)
Technical bid documents and compliance certificates
Notarized undertaking of non-liquidity and non-bankruptcy
Key insights about BIHAR tender market
Bidders should prepare GST, PAN, turnover certificates, experience proofs, and OEM authorization. The bid requires a security deposit of ₹50,000 as EMD, and the scope covers Supply, Installation, Testing and Commissioning. Ensure eligibility with last 3-year turnover and maintain 25% quantity flexibility per the option clause.
Submit GST certificate, PAN, audited financials or CA certificate showing last 3-year turnover, OEM authorization, experience certificates for similar projects, EMD proof, and technical bid documents. Include undertaking of non-liquidity and proof of absence of bankruptcy.
OEMs must show minimum average annual turnover for the last 3 years from audited balances or CA certificates. If the OEM is under 3 years, use completed years' turnover post-incorporation. Bidder must present corresponding OEM turnover along with bidder turnover.
The purchaser may increase or decrease quantity up to 25% at award and during currency. The additional delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days, extending to the original period if needed.
EMD is ₹50,000. Submit via demand draft or online transfer as per the bid guidelines. Include EMD receipt with the bid; ensure compliance with vendor registration and payment terms stated in the final contract.
Delivery and commissioning are included in the Scope: Supply, Installation, Testing and Commissioning. The delivery schedule follows the last date of the original delivery order, with option-based extensions. Ensure installation readiness, testing protocols, and commissioning acceptance criteria are met per supplier obligations.