High Mast Lighting Tower for large area with LED Flood Lighting System
Urban Development And Housing Department
BUXAR, BIHAR
Progress
Quantity
2
Bid Type
Two Packet Bid
Begusarai District Panchayats, under the Department of Panchayati Raj, invites bids for a High Mast Lighting Tower with LED Flood Lighting System across multiple locations in BEGUSARAI, BIHAR (postal 848201). Estimated value: ₹390,000. Procurement focuses on robust steel high-mast towers, multiple-section design, and LED flood luminaires with base-mount electrics, feeder pillar panels, and intelligent control features. The scope includes installation, commissioning per State/Central Govt rules, onsite warranty, and adherence to specified wind-load and IP standards. A key differentiator is the comprehensive integration of feeder pillar panels with MCCBs/MCBs, timer-based lighting control, and ISI/IEC conformity for safety and reliability.
High Mast Lighting Tower specifications including height, number of sections, and section length
Junction box IP rating and required test reports from NABL/ILAC labs
Feeder pillar panel details: IP rating, pre-treatment, powder coating, MCCB/MCB, timer, and lamination
LED flood luminaires: wattage, IP rating IS 10322, color temp, surge protection, mounting accessories, and voltage range
Experience in supplying high mast lighting systems with LED luminaires
Demonstrated capability for multi-site installation and commissioning
Compliance with IS/IEC 60529 IP ratings and IS 10322 luminaire standards
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Urban Development And Housing Department
BUXAR, BIHAR
Panchayati Raj Department
BEGUSARAI, BIHAR
Panchayati Raj Department
BEGUSARAI, BIHAR
Panchayati Raj Department
BEGUSARAI, BIHAR
Panchayati Raj Department
BEGUSARAI, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Height of High Mast Tower (in Meters) | 30, 20, 25, 16 |
| GENERIC | Installation and commissioning (Installation and commissioning work at multiple locations shall follow as per the guidelines of State/Central Govt rules and regulations as applicable) | Yes. Including Civil work at site, Yes. Excluding Civil work, No, Yes. Including civil work for mining sites (for mining sites all Electricalss, winch mechanism, lamps control-gears, breakers, cables etc shall be suitable for 230 V (L-L), 50 Hz supply and with RCCB/ELCB based protection provided with suitable range to comply relevant CEA regulation 42 |
| GENERIC | Onsite warranty (in Years) | 2, 3, 5 |
| High mast System | No of sections | 2, 3, 4, 5, 6 |
| High mast System | Effective length of each section (in m) | 10, 10.5, 8.5, 5 |
| High mast System | Material construction: The mast shall be manufactured using special steel plates, conforming to | 355 gradeasper BSEN10 025 |
| High mast System | Bottom diameter (in mm) - Minimum | 610, 540, 570 |
| High mast System | Plate thickness for Middle (in mm) - Minimum | 4 |
| High mast System | Plate thickness for Bottom (in mm) - Minimum | 5, 6 |
| High mast System | No of longitudinal welds / section (in Nos) | 1, 2 |
| High mast System | Diameter of base plate (in mm) - Minimum | 840, 740, 770 |
| High mast System | Thickness of base plate (in mm) - Minimum | 30, 25 |
| Wind Load | Maximum Wind load | 47 m/sec, 50 m/sec, 55 m/sec, 62.5 m/sec |
| Door Opening | Size of opening and closing door at base compartment of high mast (in mm) - Minimum | 1200 x 250, 1200 x 300 |
| Junction Box | Ingress protection for Junction Box i.e. IP Class (as per IS/IEC:60529:2001 latest) Test Report from Central Government lab/NABL/ILAC accrediated lab and report shall furnish to buyer on demand | IP 55, IP 65 |
| Junction Box | No of core | 3, 4, 5 |
| Junction Box | Cable category | FR, FR-LSH, 1, 2 |
| Junction Box | Size of cable (in Sq mm) | 1.5, 2.5, 4 |
| Junction Box | Conductor material shall be | Copper |
| Winch | The winch shall have provision for manual operation in case of failure of the motor | Yes |
| Stainless Steel Wire Rope | The breaking load of each rope shall be at full load as per the relevant standard | >/=2400 Kg, >/=2250Kg |
| Electrical System, Cable and Cable Connections | No. of cores | 1, 2, 3, 4, 5 |
| Electrical System, Cable and Cable Connections | Cable shall be | Armoured, Unarmoured |
| Electrical System, Cable and Cable Connections | Conudctor material shall be | Copper, Aluminium |
| Electrical System, Cable and Cable Connections | Cable Category | 1, C1, C2 |
| Electrical System, Cable and Cable Connections | Incoming power cable from feeder panel to base compartment of mast and cable shall conforming to | IS:7098 (Part 1):1988 latest |
| Feeder pillar Panel | Feeder pillar panel for each mast | Yes, No without feeder pillar panel |
| Feeder pillar Panel | Feeder panel shall be suitable for | 415 V, 3 phase, 4 wire, 50 Hz, AC, 230 V, 1 phase, AC 50 Hz, 230 V (L-L), 3 phase, AC 50 Hz (for Mining area)for Mining sites all electricals, winch mechanism, lamps control-gears, breakers, cables etc shall be suitable for 230V(L-L), 50 Hz supply |
| Feeder pillar Panel | The control panels shall be | Stand mounted, No without feeder pillar panel |
| Feeder pillar Panel | Ingress protection for feeder pillar panel i.e IP Class (as per IS/IEC:60529:2001 latest).Test Report shall furnish from Central Government lab/NABL/ILAC accrediated lab to buyer on demand | IP 55, IP 65, No without feeder pillar panel |
| Feeder pillar Panel | It shall be fabricated out of | 14 SWG CRCA sheet steel, No without feeder pillar panel |
| Feeder pillar Panel | Thickness of sheet (in mm) | 2, No without feeder pillar panel |
| Feeder pillar Panel | The panels shall be given pre-treatment and powder coated and color shall be | Grey, No without feeder pillar panel |
| Feeder pillar Panel | The stand shall be painted in | Black color, No without feeder pillar panel |
| Feeder pillar Panel | Cable entry shall be at the | Bottom, No without feeder pillar panel |
| Feeder pillar Panel | The panels shall have | knock outs of the required cable, No without feeder pillar panel |
| Feeder pillar Panel | Laminated circuit diagram shall be pasted | inside of the door, No without feeder pillar panel |
| Feeder pillar Panel | Feeder pillar shall have pad locking arrangement | Yes, No without feeder pillar panel |
| Feeder pillar Panel | Earth terminal | 12 mm dia. Bolts, No without feeder pillar panel |
| Feeder pillar Panel | Panel shall have a sloping cover to avoid accumulation of dust | Yes, No without feeder pillar panel |
| Feeder pillar Panel | Panel shall be provided with incoming & outgoing MCCB / MCB of appropriate rating and in desired quantity depending on total no of circuits in use | yes, No without feeder pillar panel |
| Feeder pillar Panel | Timer for automatic ON & OFF of lights with pilot lamps shall be provided | Yes, No without feeder pillar panel |
| Feeder pillar Panel | Bus bars material | Yes. Copper, No without feeder pillar panel |
| Feeder pillar Panel | No of Cores | 1, 2, 3, 4, 5, No without feeder pillar panel |
| Feeder pillar Panel | Size of cable (in Sq.mm) | 1.5, 2.5, 4, 6, 10, 16, No without feeder pillar panel |
| Feeder pillar Panel | Cable Shall be | Armoured, Unarmoured, No without feeder pillar panel |
| Feeder pillar Panel | The conductor material shall be | Copper, Aluminium, No without feeder pillar panel |
| Feeder pillar Panel | cable category | 1, C1, C2, No without feeder pillar panel |
| LED FLOOD LIGHT LUMINAIRE | No. of Luminaires for each high mast lighting tower (in Nos) | 4, 6, 8, 10, 12, 16, 18 |
| LED FLOOD LIGHT LUMINAIRE | LED Rating/System Wattage/Rated Power for each luminaire | 100W, 110W, 120W, 125W, 130W, 140W, 150W, 180W, 200W, 250W, 300W, 350W, 400W, 500W, 1000W |
| LED FLOOD LIGHT LUMINAIRE | Luminaire System Efficacy (Lumen/watt) | >/= 100 Lm/Watt |
| LED FLOOD LIGHT LUMINAIRE | Ingress Protection (IP Rating) as per IS:10322 (Part 1):1982 latest | IP65, IP66, IP67 |
| LED FLOOD LIGHT LUMINAIRE | Mounting brackets (included) | Adjustable |
| LED FLOOD LIGHT LUMINAIRE | Input operating Voltage range and frequency | 90 to 300 Volts AC at 50Hz+/-2Hz, 140 to 270 Volts AC at 50 Hz+/-2 Hz with auto cutt off at below 120V |
| LED FLOOD LIGHT LUMINAIRE | Rated voltage | 230 V AC 50 Hz, 415+/-10% V AC 50 Hz +/-5% |
| LED FLOOD LIGHT LUMINAIRE | Colour temperature | 6000K (+/- 500K), 5000K (+/- 500K), 4000K (+/- 500K), 3000K (+/- 500K) |
| LED FLOOD LIGHT LUMINAIRE | Optic lense material (UV stabilised) (Write NA for without optic lense supply) | Poly carbonate lense, NA |
| LED FLOOD LIGHT LUMINAIRE | Operating temperature range | -20 deg C to +50 deg C, -10 deg C to +50 deg C, -10 deg C to +55 deg C |
| LED FLOOD LIGHT LUMINAIRE | The luminaire shall be protected against surges and transients( Internal) | >/=5KV, >/=4KV |
| LED FLOOD LIGHT LUMINAIRE | Number of electronic control gear per luminaire (power supplies) | 1 No., 2 Nos., 3 Nos., 4 Nos. |
| LED FLOOD LIGHT LUMINAIRE | Length of ISI marked three core wire (shall be provided along with supply of material) | 50 cm, 100 cm |
Discover companies most likely to bid on this tender
Key insights about BIHAR tender market
Bidders must submit GST, PAN, and experience certificates along with financials; provide OEM authorizations if required, and demonstrate IS/IEC compliance. Include technical bid with IP ratings, luminaire specs, and feeder pillar details; ensure delivery terms align with 25% quantity variation option.
Required documents include GST certificate, PAN card, experience certificates, audited financial statements, EMD/Security deposit (if applicable), technical compliance certificates, OEM authorizations, and detailed product data sheets for high mast and LED luminaires.
The LED luminaires must meet IS 10322 ingress protection requirements and be ISI marked where specified; each luminaire should provide surge protection, correct color temperature, and mounting brackets; power supply compatible with the project voltage range.
Delivery can be extended via the option clause up to ±25% of the contracted quantity; extended delivery time is calculated as (Additional quantity / Original quantity) × Original delivery period, with a minimum of 30 days.
Feeder pillar panels must include MCCB/MCB protection, timer for automatic lighting, pilot lamps, IP-rated housing, pre-treated powder-coated finish, and laminated circuit diagram; panels should have earth terminal and sloping dust cover.
The scope includes installation and commissioning across multiple sites per govt guidelines, with onsite warranty and post-installation support as specified in the terms; ensure all components meet the wind load and safety standards defined in the tender.
Projects cover multiple locations within BEGUSARAI, BIHAR; sites require high mast towers with LED flood luminaires and integrated feeder pillar panels, installed per central/state government regulations for safe, reliable operation.
The tender specifies maximum wind load and structural integrity criteria for the multi-section high mast, with diameter and plate thickness constraints; structural compliance must be demonstrated in the technical bid with relevant calculations.
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS