TenderDekho Logo
Closed GEM

Indian Army Department Of Military Affairs Tender for Goods Supply in Manipur 2026 – 3 Years Experience & OEM Turnover Requirements

Bid Publish Date

14-Aug-2026, 7:47 pm

Bid End Date

29-Aug-2026, 8:00 pm

EMD

₹36,000

Progress

Issue14-Aug-2026, 7:47 pm
AwardPending

Tender Overview

The Indian Army under the Department Of Military Affairs invites bids for the supply of goods at the Senapati, Manipur (795007) location. The bid includes an EMD of ₹36,000, with a scope limited to supply-only provision of goods and an extensive BOQ containing items (190 total listed, multiple line items). The tender emphasizes vendor eligibility, including 3 years of regular government or PSU supply of similar category products and mandatory turnover criteria for the last three financial years. The document allows an option clause to adjust quantities by up to ±25% during and after contract formation, with the delivery timeline linked to the original delivery period. Bidders must comply with supply at contracted rates and acknowledge the option-driven delivery adjustments.

Technical Specifications & Requirements

  • No explicit product specifications are published in the tender data. The BOQ lists 190 items, but exact item names, quantities, units, and technical standards are not disclosed.
  • Required documentation includes PAN Card, GSTIN, cancelled cheque, and EFT mandate certified by bank. Experience criteria require three years of regular manufacturing/supply to government bodies for similar products, evidenced by prior contracts. Turnover criteria demand a minimum average annual turnover over the last three years, with OEM turnover also specified. Scope states “Only supply of Goods.”
  • The purchase terms grant quantity variation up to 25% and mention delivery commencing from the last date of the original delivery order, extended by a calculable formula.

Terms, Conditions & Eligibility

  • EMD: ₹36,000
  • Experience: 3 years’ regular supply/manufacture of same/similar category products to Central/State Govt/PSU; contracts to be provided
  • Turnover: Average annual turnover over the last 3 years (as per audit/certified statements) required; OEM turnover similarly mandated
  • Documents with bid: PAN, GSTIN, cancelled cheque, EFT mandate; proof of contracts
  • Scope: Only supply of goods; bid price inclusive of all costs; option clause permits ±25% quantity adjustment; delivery period aligned to original delivery dates
  • Location: Senapati, Manipur 795007
  • Bidders must comply with all terms, including delivery at contracted rates and extended timelines if option is exercised

Key Specifications

  • EMD amount: ₹36000

  • Experience: 3 years in similar government supply

  • Turnover: average turnover criteria over last 3 years

  • Scope: Only supply of Goods

  • Delivery: aligned to original delivery period; quantity variation up to 25%

  • Documents: PAN, GSTIN, EFT mandate; bank-certified

  • OEM turnover: minimum average annual turnover as per bid document

Terms & Conditions

  • Quantity may be increased/decreased by up to 25% at contract placement and during currency

  • Bid must include PAN, GSTIN, cancelled cheque, and EFT mandate

  • 3 years government/PSU supply experience required with evidence

  • Minimum average turnover for bidder and OEM over last 3 years required

Important Clauses

Payment Terms

Release terms unspecified beyond contract price; bidder to note option-based quantity adjustments and delivery timelines

Delivery Schedule

Delivery begins from the last date of original delivery order; extended time calculated by (increased quantity / original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated in data; contractors should review contract for LDs based on delivery delays

Bidder Eligibility

  • 3 years of government/PSU supply experience for similar products

  • Minimum average turnover over last 3 fiscal years as per bid document

  • OEM turnover requirement evidenced by certified accounts

  • Submission of PAN, GSTIN, EFT mandate, and bank-certified documents

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

3893

Category

Gate Valve 50 mm

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

4

OEM Avg. Turnover

48

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

12

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

SENAPATI

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SENAPATISENAPATI--1745-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 10

GeM-Bidding-9638075.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

CATALOG-Specification-2

CATALOG Specification

CATALOG-Specification-3

CATALOG Specification

CATALOG-Specification-4

CATALOG Specification

CATALOG-Specification-5

CATALOG Specification

CATALOG-Specification-6

CATALOG Specification

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 190 Items Sign in for GEM prices

#1

Gate Valve 40 mm

Gate Valve 40 mm

3 nos Delivery: 45 days
#2

Gate Valve 50 mm

Gate Valve 50 mm

3 nos Delivery: 45 days
#3

Stop cock brass 25mm external threading

Stop cock brass 25mm external threading

12 nos Delivery: 45 days
#4

Stop cock brass 25mm internal threading

Stop cock brass 25mm internal threading

12 nos Delivery: 45 days
#5

Waste Pipe 32mm PVC dia for WHB

Waste Pipe 32mm PVC dia for WHB

39 nos Delivery: 45 days
#6

wall mixture non telephonic

wall mixture non telephonic

3 each Delivery: 45 days
#7

sink mixture

sink mixture

2 each Delivery: 45 days
#8

Waste coupling 32mm CP

Waste coupling 32mm CP

17 nos Delivery: 45 days
#9

Sluice Valve 200mm

Sluice Valve 200mm

1 nos Delivery: 45 days
#10

Bleaching powder

Bleaching powder

360 kgs Delivery: 45 days
#11

Aquafit Sodium Hypochlorite

Aquafit Sodium Hypochlorite

440 kgs Delivery: 45 days
#12

GI union 50mm

GI union 50mm

14 nos Delivery: 45 days
#13

Brass NRV 40mm

Brass NRV 40mm

3 nos Delivery: 45 days
#14

Brass NRV 50mm

Brass NRV 50mm

3 nos Delivery: 45 days
#15

Brass NRV 80mm

Brass NRV 80mm

2 nos Delivery: 45 days
#16

Brass NRV 100mm

Brass NRV 100mm

1 nos Delivery: 45 days
#17

Reducer Socket 100 x 50mm

Reducer Socket 100 x 50mm

3 nos Delivery: 45 days
#18

GI tubing 40mm medium grade

GI tubing 40mm medium grade

14 rm Delivery: 45 days
#19

Lead pig

Lead pig

14 kgs Delivery: 45 days
#20

Retro reflective tape

Retro reflective tape

6 rm Delivery: 45 days
#21

GI elbow 25mm

GI elbow 25mm

17 nos Delivery: 45 days
#22

GI union socket 25mm

GI union socket 25mm

30 nos Delivery: 45 days
#23

GI union 20mm

GI union 20mm

30 nos Delivery: 45 days
#24

GI elbow 20mm

GI elbow 20mm

44 nos Delivery: 45 days
#25

GI socket 20mm Half Threaded

GI socket 20mm Half Threaded

44 nos Delivery: 45 days
#26

Stop cock PVC 20 mm

Stop cock PVC 20 mm

17 nos Delivery: 45 days
#27

GI socket 40mm Half Threaded

GI socket 40mm Half Threaded

17 nos Delivery: 45 days
#28

GI nipple 50mm x 150mm

GI nipple 50mm x 150mm

17 nos Delivery: 45 days
#29

GI socket 25mm

GI socket 25mm

17 nos Delivery: 45 days
#30

GI nipple 20mm x 150mm

GI nipple 20mm x 150mm

17 nos Delivery: 45 days
#31

GI elbow reducing 20x15mm

GI elbow reducing 20x15mm

17 nos Delivery: 45 days
#32

GI bend 25mm

GI bend 25mm

17 nos Delivery: 45 days
#33

GI tee equal 20mm

GI tee equal 20mm

30 nos Delivery: 45 days
#34

GI Tee equal reducing 25x20mm

GI Tee equal reducing 25x20mm

30 nos Delivery: 45 days
#35

GI Nipple 25mm x 150mm

GI Nipple 25mm x 150mm

17 nos Delivery: 45 days
#36

GI tee equal reducing 25x15mm

GI tee equal reducing 25x15mm

17 nos Delivery: 45 days
#37

GI tee equal reducing 20x15mm

GI tee equal reducing 20x15mm

17 nos Delivery: 45 days
#38

M Seal

M Seal

17 kgs Delivery: 45 days
#39

Gi Nipple 25mm x 50mm

Gi Nipple 25mm x 50mm

17 nos Delivery: 45 days
#40

GI nipple 15x300 mm

GI nipple 15x300 mm

8 each Delivery: 45 days
#41

GI socket reduser 25mmx15mm

GI socket reduser 25mmx15mm

7 each Delivery: 45 days
#42

GM gate valve 15mm

GM gate valve 15mm

5 each Delivery: 45 days
#43

GM gate valve 20mm

GM gate valve 20mm

5 each Delivery: 45 days
#44

Hacksaw blade

Hacksaw blade

70 nos Delivery: 45 days
#45

GI medium grade tubing 15 mm

GI medium grade tubing 15 mm

2 rm Delivery: 45 days
#46

GI medium grade tubing 25 mm

GI medium grade tubing 25 mm

2 rm Delivery: 45 days
#47

GI medium grade tubing 40 mm

GI medium grade tubing 40 mm

2 rm Delivery: 45 days
#48

Brass NRV 20mm

Brass NRV 20mm

7 nos Delivery: 45 days
#49

Brass NRV 25mm

Brass NRV 25mm

7 nos Delivery: 45 days
#50

Sluice Valve 80mm

Sluice Valve 80mm

1 nos Delivery: 45 days
#51

Reducer Socket 100 x 80 mm

Reducer Socket 100 x 80 mm

1 nos Delivery: 45 days
#52

Reducer Socket 80 x 50mm

Reducer Socket 80 x 50mm

4 nos Delivery: 45 days
#53

Reducer Socket 80 x 40mm

Reducer Socket 80 x 40mm

4 nos Delivery: 45 days
#54

Reducer Socket 80 x 25mm

Reducer Socket 80 x 25mm

4 nos Delivery: 45 days
#55

Reducer Socket 50 x 25mm

Reducer Socket 50 x 25mm

7 nos Delivery: 45 days
#56

Reducer Socket 50 x 40mm

Reducer Socket 50 x 40mm

7 nos Delivery: 45 days
#57

Reducer Socket 40 x 25 mm

Reducer Socket 40 x 25 mm

7 nos Delivery: 45 days
#58

Reducer Socket 40 x 20 mm

Reducer Socket 40 x 20 mm

7 nos Delivery: 45 days
#59

Reducer Socket 25 x 20 mm

Reducer Socket 25 x 20 mm

17 nos Delivery: 45 days
#60

Lead wool

Lead wool

9 kgs Delivery: 45 days
#61

Cotton waste

Cotton waste

17 kgs Delivery: 45 days
#62

Stainless Steel Connecting Pipe for geyser 24 inch

Stainless Steel Connecting Pipe for geyser 24 inch

20 nos Delivery: 45 days
#63

Distilled water 5 Ltr Container

Distilled water 5 Ltr Container

17 nos Delivery: 45 days
#64

Plastic laminated sheet teak face 8 feet x 4 feet x 1mm

Plastic laminated sheet teak face 8 feet x 4 feet x 1mm

10 nos Delivery: 45 days
#65

PVC sheet for chair dining map FD

PVC sheet for chair dining map FD

60 nos Delivery: 45 days
#66

Mordant solution

Mordant solution

5 ltr Delivery: 45 days
#67

Cushion sofa set 100 mm thick 32 mm density 21 inch x 22 inch

Cushion sofa set 100 mm thick 32 mm density 21 inch x 22 inch

14 nos Delivery: 45 days
#68

Fevicol SH

Fevicol SH

14 kgs Delivery: 45 days
#69

Looking mirror for table dressing ladies size 360x1120x5mm

Looking mirror for table dressing ladies size 360x1120x5mm

3 nos Delivery: 45 days
#70

Varnish

Varnish

14 ltrs Delivery: 45 days
#71

Mirror for table dressing 25 x 19mm and mirror 5.5mm thick.

Mirror for table dressing 25 x 19mm and mirror 5.5mm thick.

4 nos Delivery: 45 days
#72

Seat for chair CB steel without arms

Seat for chair CB steel without arms

10 nos Delivery: 45 days
#73

Looking mirror table dressing gents 360x700x5mm

Looking mirror table dressing gents 360x700x5mm

5 nos Delivery: 45 days
#74

Back seat for chair tubular with arms

Back seat for chair tubular with arms

10 nos Delivery: 45 days
#75

Dendrite

Dendrite

14 ltrs Delivery: 45 days
#76

Paint enamelled OG

Paint enamelled OG

14 ltrs Delivery: 45 days
#77

Newar nylon 25mm width White

Newar nylon 25mm width White

5 kgs Delivery: 45 days
#78

Knob decorative acrylic

Knob decorative acrylic

17 nos Delivery: 45 days
#79

Base wheel for chair revolving executive

Base wheel for chair revolving executive

17 nos Delivery: 45 days
#80

Teak wood beading 12mm x 4mm x 2m

Teak wood beading 12mm x 4mm x 2m

15 nos Delivery: 45 days
#81

Channel aluminium 12mm

Channel aluminium 12mm

9 nos Delivery: 45 days
#82

Legs for dining table of size 800 x 75 x 50 mm

Legs for dining table of size 800 x 75 x 50 mm

10 nos Delivery: 45 days
#83

Curtain rod stainless steel 15 to 20mm 6mtr long

Curtain rod stainless steel 15 to 20mm 6mtr long

9 nos Delivery: 45 days
#84

Teak wood beading 19mm x 4mm x 2m

Teak wood beading 19mm x 4mm x 2m

15 nos Delivery: 45 days
#85

Handle for almirah medium steel 100mm CP

Handle for almirah medium steel 100mm CP

15 nos Delivery: 45 days
#86

Continious piano hinge

Continious piano hinge

5 rm Delivery: 45 days
#87

Hasp and stapple aluminium 100mm

Hasp and stapple aluminium 100mm

10 nos Delivery: 45 days
#88

Painting brush 75mm

Painting brush 75mm

5 nos Delivery: 45 days
#89

Legs for peg table size 420 x 50 x 30 mm

Legs for peg table size 420 x 50 x 30 mm

8 nos Delivery: 45 days
#90

Rubber PVC shoes for chair dining

Rubber PVC shoes for chair dining

17 nos Delivery: 45 days
#91

Butt hinges MS 100 MM

Butt hinges MS 100 MM

10 nos Delivery: 45 days
#92

Painting brush 25mm

Painting brush 25mm

15 nos Delivery: 45 days
#93

MS screw wood 15mm

MS screw wood 15mm

6 pkt Delivery: 45 days
#94

Butt hinges 25mm

Butt hinges 25mm

15 nos Delivery: 45 days
#95

GI tubing 32 mm

GI tubing 32 mm

17 rm Delivery: 45 days
#96

Handle for chair revolving executive

Handle for chair revolving executive

17 nos Delivery: 45 days
#97

Paint white 1st grade synthetic enamel

Paint white 1st grade synthetic enamel

8 ltr Delivery: 45 days
#98

White Spirit

White Spirit

17 ltrs Delivery: 45 days
#99

CP Knob 25mm

CP Knob 25mm

17 nos Delivery: 45 days
#100

Hasp and stapple SS 75mm

Hasp and stapple SS 75mm

10 nos Delivery: 45 days
#101

Beeding PVC of size 12 x 6mm x 8 feet long

Beeding PVC of size 12 x 6mm x 8 feet long

10 nos Delivery: 45 days
#102

Painting brush 100mm

Painting brush 100mm

5 nos Delivery: 45 days
#103

Elbow 3 way GI 32 mm dia

Elbow 3 way GI 32 mm dia

15 nos Delivery: 45 days
#104

Check nut 32mm

Check nut 32mm

15 nos Delivery: 45 days
#105

Lock for drawer steel

Lock for drawer steel

8 nos Delivery: 45 days
#106

Abbrasive Cloth Emery Paper No 50

Abbrasive Cloth Emery Paper No 50

50 nos Delivery: 45 days
#107

Abbrasive Cloth Emery Paper No 60

Abbrasive Cloth Emery Paper No 60

50 nos Delivery: 45 days
#108

Abbrasive Cloth Emery Paper No 80

Abbrasive Cloth Emery Paper No 80

50 nos Delivery: 45 days
#109

Abbrasive Cloth Emery Paper No 100

Abbrasive Cloth Emery Paper No 100

50 nos Delivery: 45 days
#110

Abbrasive Cloth Emery Paper No 120

Abbrasive Cloth Emery Paper No 120

50 nos Delivery: 45 days
#111

Seat Hot Pressed Cushion of size 510mm x470mm x 60mm Chair Revolving

Seat Hot Pressed Cushion of size 510mm x470mm x 60mm Chair Revolving

15 nos Delivery: 45 days
#112

Seat Hot Pressed Cushion of size 510mm x470mm x 60mm Chair Revolving

Seat Hot Pressed Cushion of size 510mm x470mm x 60mm Chair Revolving

15 nos Delivery: 45 days
#113

Back Hot Pressed Cushion of size 510mm x470mm x 60mm Chair Revolving

Back Hot Pressed Cushion of size 510mm x470mm x 60mm Chair Revolving

15 nos Delivery: 45 days
#114

Back Hot Pressed Cushion of size 510mm x570mm x 60mm Chair Revolving

Back Hot Pressed Cushion of size 510mm x570mm x 60mm Chair Revolving

15 nos Delivery: 45 days
#115

Bottom Gas Lift hydraulic for Revolving Chairs

Bottom Gas Lift hydraulic for Revolving Chairs

15 nos Delivery: 45 days
#116

Broom country Coconut NariyalJhadu

Broom country Coconut NariyalJhadu

80 nos Delivery: 45 days
#117

Blazer Cloth Green 1.5mtr wide

Blazer Cloth Green 1.5mtr wide

20 mtrs Delivery: 45 days
#118

Chapra Flakes Powder

Chapra Flakes Powder

60 kgs Delivery: 45 days
#119

Cloth Malmal white 1.5mtr wide

Cloth Malmal white 1.5mtr wide

30 mtrs Delivery: 45 days
#120

Electro Plated Cloth Paper No 80

Electro Plated Cloth Paper No 80

10 nos Delivery: 45 days
#121

Electro Plated Cloth Paper No 100

Electro Plated Cloth Paper No 100

10 nos Delivery: 45 days
#122

Electro Plated Cloth Paper No 120

Electro Plated Cloth Paper No 120

10 nos Delivery: 45 days
#123

Glass toughened transparent 5mm x 4 feet x 2 feet rectangular

Glass toughened transparent 5mm x 4 feet x 2 feet rectangular

4 pcs Delivery: 45 days
#124

Glass toughened transparent 5mm x 6 feet x3 feet rectangular

Glass toughened transparent 5mm x 6 feet x3 feet rectangular

4 pcs Delivery: 45 days
#125

Glass toughened black colour 6mm x 3 feet x 2 feet rectangular

Glass toughened black colour 6mm x 3 feet x 2 feet rectangular

5 pcs Delivery: 45 days
#126

Mild Steel Star Head Screw Wood 15mm 100 Pcs Pkt

Mild Steel Star Head Screw Wood 15mm 100 Pcs Pkt

20 pkt Delivery: 45 days
#127

Mild Steel Star Head Screw Wood 20mm 100 Pcs Pkt

Mild Steel Star Head Screw Wood 20mm 100 Pcs Pkt

20 pkt Delivery: 45 days
#128

Mild Steel Star Head Screw Wood 25mm 100 Pcs Pkt

Mild Steel Star Head Screw Wood 25mm 100 Pcs Pkt

20 pkt Delivery: 45 days
#129

Mild Steel Star Head Screw Wood 35mm 100 Pcs Pkt

Mild Steel Star Head Screw Wood 35mm 100 Pcs Pkt

20 pkt Delivery: 45 days
#130

Mild Steel Star Head Screw Wood 40mm 100 Pcs Pkt

Mild Steel Star Head Screw Wood 40mm 100 Pcs Pkt

20 pkt Delivery: 45 days
#131

Mild Steel Panel Pin 15mm 100 Pcs Pkt

Mild Steel Panel Pin 15mm 100 Pcs Pkt

10 pkt Delivery: 45 days
#132

Mild Steel Panel Pin 20mm 100 Pcs Pkt

Mild Steel Panel Pin 20mm 100 Pcs Pkt

10 pkt Delivery: 45 days
#133

Mild Steel Panel Pin 25mm 100 Pcs Pkt

Mild Steel Panel Pin 25mm 100 Pcs Pkt

10 pkt Delivery: 45 days
#134

Mild Steel Panel Pin 35mm 100 Pcs Pkt

Mild Steel Panel Pin 35mm 100 Pcs Pkt

10 pkt Delivery: 45 days
#135

Mild Steel Panel Pin 40mm 100 Pcs Pkt

Mild Steel Panel Pin 40mm 100 Pcs Pkt

10 pkt Delivery: 45 days
#136

Nails Wire Steel 20mm

Nails Wire Steel 20mm

10 kgs Delivery: 45 days
#137

Nails wire steel 50mm

Nails wire steel 50mm

10 kgs Delivery: 45 days
#138

Nails wire steel 25mm

Nails wire steel 25mm

10 kgs Delivery: 45 days
#139

Nails wire steel 100mm

Nails wire steel 100mm

10 kgs Delivery: 45 days
#140

Nails wire steel 40mm

Nails wire steel 40mm

10 kgs Delivery: 45 days
#141

Nails wire steel 75mm

Nails wire steel 75mm

10 kgs Delivery: 45 days
#142

PVC Edge Band Edge Tape Size 18mm W x10mtr L

PVC Edge Band Edge Tape Size 18mm W x10mtr L

25 roll Delivery: 45 days
#143

PVC Edge Band Edge Tape Size 12mm W x10mtr L

PVC Edge Band Edge Tape Size 12mm W x10mtr L

20 roll Delivery: 45 days
#144

PVC Edge Band Edge Tape Size 6mm W x10mtr L

PVC Edge Band Edge Tape Size 6mm W x10mtr L

20 roll Delivery: 45 days
#145

Synthetic Rexine Cloth 1.5mtrs wide

Synthetic Rexine Cloth 1.5mtrs wide

20 mtrs Delivery: 45 days
#146

U Foam of 4 feet x 2 feet x100mm 32mm Density

U Foam of 4 feet x 2 feet x100mm 32mm Density

10 nos Delivery: 45 days
#147

Veneer Sheet 8 feet x 4 feet x 1mm

Veneer Sheet 8 feet x 4 feet x 1mm

15 nos Delivery: 45 days
#148

Touch wood

Touch wood

10 ltr Delivery: 45 days
#149

Thinner

Thinner

17 ltrs Delivery: 45 days
#150

Paint enamelled black

Paint enamelled black

17 ltrs Delivery: 45 days
#151

Paint red oxide

Paint red oxide

10 ltrs Delivery: 45 days
#152

PVC wall laminates

PVC wall laminates

12 sqm Delivery: 45 days
#153

Float valve PVC15mm with ball cock

Float valve PVC15mm with ball cock

26 nos Delivery: 45 days
#154

GI tubing 15mm medium grade

GI tubing 15mm medium grade

39 rm Delivery: 45 days
#155

Cabinet mirror 450x300x125mm

Cabinet mirror 450x300x125mm

3 nos Delivery: 45 days
#156

Toilet paper holder

Toilet paper holder

6 nos Delivery: 45 days
#157

Jet Spray full brass CP with 1.2mtr

Jet Spray full brass CP with 1.2mtr

14 nos Delivery: 45 days
#158

Paint road marking white

Paint road marking white

14 ltrs Delivery: 45 days
#159

Curtain rod fancy type 25mm dia 6m

Curtain rod fancy type 25mm dia 6m

14 nos Delivery: 45 days
#160

GI Pipe 20mm

GI Pipe 20mm

14 mtrs Delivery: 45 days
#161

cabinet mirror

cabinet mirror

2 each Delivery: 45 days
#162

Perforated particle boards acoustic purpose 60cmx60cmx18 mm

Perforated particle boards acoustic purpose 60cmx60cmx18 mm

14 sqm Delivery: 45 days
#163

Anti termite chemical

Anti termite chemical

14 ltr Delivery: 45 days
#164

50 Kg cement bags

50 Kg cement bags

7 nos Delivery: 45 days
#165

plain aluminium sheet 0.56mm thick

plain aluminium sheet 0.56mm thick

14 pkt Delivery: 45 days
#166

steel curtain rod 20mm dia and 3.6 m long

steel curtain rod 20mm dia and 3.6 m long

14 each Delivery: 45 days
#167

steel plate rack

steel plate rack

4 each Delivery: 45 days
#168

sheet fixing machine

sheet fixing machine

3 nos Delivery: 45 days
#169

PVC connection pipe 450mm long

PVC connection pipe 450mm long

30 nos Delivery: 45 days
#170

GI union 40mm

GI union 40mm

17 nos Delivery: 45 days
#171

PVC connection pipe with brass nut 600mm

PVC connection pipe with brass nut 600mm

17 nos Delivery: 45 days
#172

GI tee equal 15mm

GI tee equal 15mm

44 nos Delivery: 45 days
#173

GI union 15mm

GI union 15mm

44 nos Delivery: 45 days
#174

Tower bolt aluminium 75 mm

Tower bolt aluminium 75 mm

17 nos Delivery: 45 days
#175

Cement white

Cement white

30 kgs Delivery: 45 days
#176

Tower bolt aluminium 150mm

Tower bolt aluminium 150mm

30 nos Delivery: 45 days
#177

PVC connection pipe 15mm x 300mm long

PVC connection pipe 15mm x 300mm long

10 nos Delivery: 45 days
#178

GI socket 15mm

GI socket 15mm

44 nos Delivery: 45 days
#179

Putty white

Putty white

30 kgs Delivery: 45 days
#180

GI elbow 15mm

GI elbow 15mm

44 nos Delivery: 45 days
#181

PVC flush pipe 450mm long

PVC flush pipe 450mm long

17 nos Delivery: 45 days
#182

GI Nipple 15mm x 150mm

GI Nipple 15mm x 150mm

30 nos Delivery: 45 days
#183

Tower bolt alumiium 100mm

Tower bolt alumiium 100mm

17 nos Delivery: 45 days
#184

GI Nipple barrel 100 x 15mm

GI Nipple barrel 100 x 15mm

17 nos Delivery: 45 days
#185

Waste pipe urinal

Waste pipe urinal

17 nos Delivery: 45 days
#186

Nipple 20mm

Nipple 20mm

17 nos Delivery: 45 days
#187

PVC tank nipple 20mm

PVC tank nipple 20mm

17 nos Delivery: 45 days
#188

Reducer socket 20x15mm

Reducer socket 20x15mm

17 nos Delivery: 45 days
#189

French Polish

French Polish

17 ltrs Delivery: 45 days
#189

Wall rountedrectanglur glass sholves

Wall rountedrectanglur glass sholves

4 nos Delivery: 45 days

Categories 100

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate duly certified by Bank

5

Evidence of 3 years government/PSU supply contracts for similar products

6

Audited balance sheets or CA certificate indicating turnover for last 3 years

7

OEM authorization (if bidding through an intermediary)

8

Contract copies supporting annual quantity/value and performance

9

Any additional bid documents as per Terms and Conditions

Technical Specifications 6 Items

Item #1 Details

View Catalog
Category Specification Requirement
Generic Product Type Soap Dish
Material, Finish & Shape Material Plastic (ABS)
Dimensions & Weight Length (in mm) 120 mm
Dimensions & Weight Width (in mm) 90 mm
Dimensions & Weight Height (in mm) 30 mm
Dimensions & Weight Net Weight (in grams) 150 gram
Additional Requirements Drainage Holes Yes
Additional Requirements Rust Resistant Yes

Frequently Asked Questions

Key insights about MANIPUR tender market

How to bid for the Indian Army goods tender in Manipur 2026?

Bidders must meet eligibility: 3 years of govt/PSU supply experience, minimum average turnover over the last 3 years, and OEM turnover criteria. Prepare PAN, GSTIN, cancelled cheque, and bank-certified EFT mandate. Include contract copies for similar products and audited financials. Submit bid with all required documents.

What documents are required for the Manipur supply tender bidding?

Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by the bank, evidence of 3-year govt/PSU supply contracts, audited turnover or CA certificate for last 3 years, and OEM authorizations if bidding via reseller. Include contract copies demonstrating yearly quantities.

What is the EMD amount for this Indian Army procurement?

The EMD is ₹36,000. Submit a payable demand draft or electronic deposit as per tender guidelines. Ensure EMD accompanies the bid package and is linked to the bidder’s registered organization name and bank details to avoid rejection.

What is the delivery framework for quantity adjustments in this bid?

The contract allows ±25% quantity adjustment at award and during currency. Delivery time follows the original delivery period, with additional time calculated as (increased quantity / original quantity) × original period, but not less than 30 days.

What turnover criteria must OEMs meet for this procurement?

Both bidders and the OEM must show a minimum average annual turnover for the last 3 years ending 31st March. Provide audited balance sheets or CA/CAC certificates demonstrating the specified turnover threshold to qualify.

What is the scope of supply for this Manipur tender?

Scope specifies Only supply of Goods. The BOQ comprises 190 items, though exact items and specs are not disclosed in the data. Bid prices must include all costs associated with delivering goods to the specified Manipur location.

What documents prove eligibility for Central/State government supply?

Provide contract copies showing quantities/values for the relevant year, experience certificates, and turnover proof. Ensure documents establish regular manufacturing/supply to government bodies for similar category products and align with the 3-year criteria.

When is the delivery period applicable after the original order?

Delivery starts from the last date of the original order, with the possibility of extended time if the option is exercised. The minimum extension is 30 days, ensuring a calculable increase based on quantity adjustments.