TenderDekho Logo
Active GEM

Open Tender for NVR Network video recorder 16 channel,08 TB Hard Drive,KVM,HDMI Switcher,PVC Box IO Box,Unarmoured in WEST DELHI, DELHI

Bid Publish Date

22-Sep-2026, 2:55 pm

Bid End Date

23-Oct-2026, 3:00 pm

EMD

₹37,500

Generate Docs

Progress

Issue22-Sep-2026, 2:55 pm
Corrigendum10-Oct-2026
AwardPending

Special Protection Group (spg) announces a tender for NVR Network video recorder 16 channel, 08 TB Hard Drive, KVM, HDMI Switcher, PVC Box IO Box, Unarmoured Cat 6 Cable, Armoured Cat 6 Cable, Capping and casing, Laying of Capping casing pvc conduit, Power sockets including installation, CAT 6 Cable Laying Charges, Power cable 3 core 2. 5 mm, Power cable laying charges, IP Cameras Installation Bullet and Dome alongwith junction Box, IP Cameras Installation for PTZ, NVR Installation and configuration charges, Installation of Display 43 inch display with mounting, UPS installation of 04 Nos 1 kva and 01 Nos 15 KVA, Installation of 12 or 15 Unit rack, Misc Items RJ 45 connector IO in WEST DELHI, DELHI. Quantity: 12470. Submission Deadline: 23-10-2026 15: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

12470

Category

NVR Network video recorder 16 channel

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

NVR Network video recorder 16 channel , 08 TB Hard Drive , KVM , HDMI Switcher , PVC Box IO Box , Unarmoured Cat 6 Cable , Armoured Cat 6 Cable , Capping and casing , Laying of Capping casing pvc conduit , Power sockets including installation , CAT 6 Cable Laying Charges , Power cable 3 core 2.5 mm , Power cable laying charges , IP Cameras Installation Bullet and Dome alongwith junction Box , IP Cameras Installation for PTZ , NVR Installation and configuration charges , Installation of Display 43 inch display with mounting , UPS installation of 04 Nos 1 kva and 01 Nos 15 KVA , Installation of 12 or 15 Unit rack , Misc Items RJ 45 connector IO

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

17

Pre-Bid & Qualification

Pre-Bid Date

28-09-2026 11:00:00

Pre-Bid Venue

Communication Branch, No. 1 Safdarjung Lane (Special Protection Group) New Delhi-110011

Delivery Details

Max Delivery Days

56

Delivery Locations

1

Delivery Cities

South West

Delivery Pincodes

110075

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Abhijeet Gaurav110075,ADMN BLOCK, SPG COMPLEX, SECTOR-8 DWARKA, NEW DELHISouth WestDelhi110075656-

Authority Records

CABINET SECRETARIAT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9779510.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

9 Lkm New Delhi

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

10-Oct-2026

Extended Deadline

23-Oct-2026, 9:30 am

Opening Date

24-Oct-2026, 9:30 am

Advertisement

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

NVR Network video recorder 16 channel

As per specification

6 number Delivery: 56 days
#2

08 TB Hard Drive

As per specification

6 number Delivery: 56 days
#3

KVM

As per specification

2 number Delivery: 56 days
#4

HDMI Switcher

As per specification

1 number Delivery: 56 days
#5

PVC Box IO Box

As per specification

42 number Delivery: 56 days
#6

Unarmoured Cat 6 Cable

As per specification

2,700 meter Delivery: 56 days
#7

Armoured Cat 6 Cable

As per specification

900 meter Delivery: 56 days
#8

Capping and casing

As per specification

500 meter Delivery: 56 days
#9

Laying of Capping casing pvc conduit

As per specification

3,600 meter Delivery: 56 days
#10

Power sockets including installation

As per specification

6 number Delivery: 56 days
#11

CAT 6 Cable Laying Charges

As per specification

3,600 meter Delivery: 56 days
#12

Power cable 3 core 2.5 mm

As per specification

500 meter Delivery: 56 days
#13

Power cable laying charges

As per specification

500 meter Delivery: 56 days
#14

IP Cameras Installation Bullet and Dome alongwith junction Box

As per specification

38 number Delivery: 56 days
#15

IP Cameras Installation for PTZ

As per specification

4 number Delivery: 56 days
#16

NVR Installation and configuration charges

As per specification

6 number Delivery: 56 days
#17

Installation of Display 43 inch display with mounting

As per specification

6 number Delivery: 56 days
#18

UPS installation of 04 Nos 1 kva and 01 Nos 15 KVA

As per specification

5 number Delivery: 56 days
#19

Installation of 12 or 15 Unit rack

As per specification

6 number Delivery: 56 days
#20

Misc Items RJ 45 connector IO

As per specification

42 number Delivery: 56 days

Categories 32

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement