Organization: Cochin Shipyard Ltd. The procurement focuses on tubular type glass level gauge for service/use in ERNAKULAM, KERALA. Tender data shows no BOQ quantity (Total Items: 0) and an ATC document uploaded by the buyer. The contract contemplates a flexible quantity framework, with the purchaser reserving the right to adjust order volumes up to 25% during both initial and currency periods. Delivery timelines hinge on the last delivery order date and may stretch with the option clause, requiring bidders to plan for variable schedules. This tender requires bidders to align with buyer-specific ATC terms and is positioned under the Department of Public Enterprises context.
Product/service names: tubular type glass level gauge
Quantity/scale: not specified (BOQ shows Total Items: 0)
EMD/estimated value: not provided in data
Experience: not specified in data
Quality/standards: not specified; ATC may contain standards
Delivery: governed by option clause with 25% quantity variance and 30-day minimum extension
Option clause allowing +/-25% quantity adjustment at contract and during currency
Delivery period determined by last delivery order date with extended time formula
ATC document uploaded; bidders must review for mandatory terms and documents
Purchaser may adjust quantity by up to 25% at contract placement and during the contract; delivery extends per (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Buyer-uploaded ATC document governs additional terms; bidders must review for submission requirements and standards
No explicit payments or penalties stated in available data; refer to ATC for payment terms and LD if applicable
Ability to bid for tubular level gauge procurement in Kerala
Compliance with ATC terms and submission of mandatory documents
Demonstrated experience in similar gauge equipment supply (per ATC)
Quantity
8
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
TUBULAR TYPE GLASS LEVEL GAUGE
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Ernakulam
Delivery Pincodes
682015
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Dijeev D | 682015,Cochin Shipyard Limited, Perumanoor, Kochi- 682304 | Ernakulam | Kerala | 682015 | 8 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
02-Nov-2026, 4:30 am
Opening Date
03-Nov-2026, 4:30 am
GST registration certificate
Permanent Account Number (PAN)
Experience certificates (relevant to tubular gauge or similar equipment)
Financial statements or turnover proof (as specified by ATC)
EMD/Security deposit documents (amount to be confirmed in ATC)
Technical bid documents demonstrating compliance with ATC
OEM authorization/authorized dealership certificates (if required by ATC)
Key insights about KERALA tender market
Bidders should review the ATC uploaded by the buyer, assemble mandatory documents (GST, PAN, experience, financials, OEM authorizations), and ensure compliance with the 25% quantity variation clause. Prepare delivery capability based on the last delivery order date and be ready for potential extended timelines under the option clause.
Submit GST registration, PAN, and experience certificates for similar gauge equipment, financial statements, EMD documents per ATC, technical bid detailing gauge compatibility, and OEM authorizations if required by ATC; ensure all documents align with the uploaded ATC terms.
The purchaser may adjust quantity up to 25% during contract placement and during the currency. Delivery time follows the last delivery order date; extended time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
No explicit ISI/ISO standards are listed in the data. The ATC document may specify standards; bidders should review the ATC to confirm any required certifications or quality benchmarks for tubular glass level gauges.
The tender is for tubular type glass level gauge procurement in ERNAKULAM, KERALA 682001. The BOQ shows Total Items: 0, indicating no listed quantities in the public data; bidders should rely on ATC for scope and technical requirements.
Delivery extension is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days; the purchaser may extend this up to the original delivery period during the option exercise.
Review the ATC for any additional submission requirements, brand constraints, warranty terms, and specific delivery or performance conditions not visible in the base tender data; ensure alignment with the 25% quantity adjustment policy.