TenderDekho Logo
OPEN - NCB EPROCURE-ANDHRA_PRADESH

Tender Notice for Operation and maintenance of Closed Compaction System Plant, hook loader vehicles and MS containers for transportation of collected garbage from MSF-IV Town Kotha Road local transfer station to Kapuluppada dump site and Engaging hire tippers & backhoe loader for internal garbage lifting and transporting for CCS hopper units for 8 months. in VISAKHAPATANAM, ANDHRA PRADESH

Bid Publish Date

25-Mar-2026, 8:00 pm

Bid End Date

09-Apr-2026, 3:30 pm

Value

₹1,95,57,224

Progress

Issue25-Mar-2026, 8:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

OPEN - NCB

Tender Fee

₹6,924

Category

O&M Works

Categories 17

A tender has been published for The issuing authority Operation and maintenance of Closed Compaction System Plant, hook loader vehicles and MS containers for transportation of collected garbage from MSF-IV Town Kotha Road local transfer station to Kapuluppada dump site and Engaging hire tippers & backhoe loader for internal garbage lifting and transporting for CCS hopper units for 8 months. in VISAKHAPATANAM, ANDHRA PRADESH by. Submission Deadline: 09-04-2026 15: 30: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Project Name

O and M CCS at MSF 4 Town kotha road

Tender Category

Works

Tender Value

₹1,95,57,224

Tender Currency

INR

Tender Fee Payable To

Transaction Fee Payable to 'APTS ' payable at Vijayawada. (As per G.O.Ms No 4,Dtd 17.02.2015 IT&C Dept)

Bid To RA

No

Authority & Contact

Officer Inviting Bids

EE Mechanical

Bid Opening Authority

BONI CHAITANYA SRINIVAS

Address

Visakhapatnam

Contact Details

8247211150

Document Requirements

Regisatration Certififcate

COMMONMandatory

EMD

COMMONMandatory

GST

COMMONMandatory

Pan card

COMMONMandatory

As per NIT tender document

COMMONMandatory

Tender Terms

General Terms and Conditions/ Eligibility

2 points

1) Registered contractors of appropriate class as per G.O. Ms. No. 94 I &CAD (PW COD) Dept., dt. 01.07.2003 for Lead Member and for other Members as per G.O....

1

01.07.2003 for Lead Member and for other Members as per G.O. Ms. No. 94 I &CAD (PW COD) Dept., dt.

2

01.07.2003 / MSME registration with relevant experience for the above physical and financial capacity are eligible to participate the tender 2) Joint venture (maximum of three members) will be allowed and the combined physical and financial capacity of parties will be considered for eligibility. For MoU between the joint venture parties, Lead member shall have minimum 51% share and the other members shall have minimum 10% share each.

General Technical Terms and Conditions (Procedure)

2 points

1) All other incidental charges and taxes except GST should be borne by the Contractor. 2) Upload 1% EMD at the time of tendering. The successful bidder shal...

1

0.04% of ECV towards Corpus Fund in the form of payable to the Managing Director, APTS (online) at the time of concluding agreement. 3) The necessary taxes (if required) such as IT, PT, NAC, ASD, FSD, Labour cess, etc., as per rules or as applicable or as fixed by the Govt., will be deducted from the Contractor's bills. 4) Corporation have no responsibility for any contingencies or otherwise. 5) If the contractor failed to start the work, after the work order issued / left the work in mid way, the work will be taken up by the 3rd Party and double the amount will be recovered from the contractors bill. 6) CCS vehicles owned by Greater Visakhapatnam Municipal Corporation, Visakhapatnam will be handover to the contractor for operation during contract period and the contractor should return the same to Greater Visakhapatnam Municipal Corporation Visakhapatnam in good working condition after completion of the contract period or as and when the Greater Visakhapatnam Municipal Corporation, Visakhapatnam requests to hand over the same. The contractor need not pay any hire/ lease charges to Greater Visakhapatnam Municipal Corporation, Visakhapatnam during the Contract period for sparing the Department CCS vehicles. The Department CCS vehicles should be parked at the place(s) indicated by the Greater Visakhapatnam Municipal Corporation, Visakhapatnam and the contract has to safe guard the same. 7) The contractor should give Bank Guarantee for an amount of Rs.20,00,000/- (B.G.) towards the 10% cost of the CCS in favour of the Commissioner, Greater Visakhapatnam Municipal Corporation, Visakhapatnam and take delivery of the Department CCS vehicles and the period of validity of the Bank Guarantee should be 12 months as Security Deposit. 8) The contractor has to bear the cost of lubricants, tyres and tubes required for the vehicles used for loading and transporting the garbage from CCS to Kapuluppada dumping yard. Greater Visakhapatnam Municipal Corporation, Visakhapatnam will not pay any charges for the same separately. The vehicle shall be parked at designated place directed by the dept as shall be operated from

2

5.30 AM. 9) The contractor should arrange loading and transporting the garbage from various places in Zone in G.V.M.C. as per agreement. 10) The contractor should arrange loading and transporting the garbage as per the programme given by the AMOH / Engineer / concerned Incharge of P.H. Section of Greater Visakhapatnam Municipal Corporation, Visakhapatnam. 11) It is the responsibility of the contractor to safe guard the vehicle against fire, theft and accidents. The GVMC will not take any responsibility in this regard. 12) The contractor should maintain the vehicle in good condition and attend the breakdown repairs immediately as per the necessity including repairs required due to accidents. Greater Visakhapatnam Municipal Corporation, Visakhapatnam will not pay any extra / additional amount to the contractor for repairs due to accidents and any other incidents. The repairs required to the Department CCS vehicles will assessed by Greater Visakhapatnam Municipal Corporation, Visakhapatnam and the contractor has to carry out the repairs indicated by Greater Visakhapatnam Municipal Corporation, Visakhapatnam under the supervision of Greater Visakhapatnam Municipal Corporation, Visakhapatnam officials. 13) If any damages occur to the Department CCS vehicles and if the contractor does not rectify the same during the contract period/ at the time of handling over the Department CCS vehicles , the repairs will be carried out by Greater Visakhapatnam Municipal Corporation, Visakhapatnam and the double the cost of repairs will be recovered from the running bills/bank guarantee. 14) The AE/AEE (Mech) shall make necessary entries in the M.Book as per trip sheets duly certified by the AMOH /S.S /S.I for arranging payments. 15) The contractor should attend the repairs immediately failing which action will be taken against the contractor. Minor repairs shall be completed within 24 hrs. The work of repaired vehicle shall be completed with standby / other vehicles so the sanitation service shall not be effected. Penalty of Rs.5,000/- per vehicle will be imposed if sanitation service is effected due to non play of vehicle. 16) The contractor should report to Department officer regards major repairs at the time of repairs for ascertain the condition of vehicle and entire work has to be executed under the overall supervision of the Executive Engineer (Mech). 17) The contractor should collect the garbage with Department CCS vehicles immediately whenever and wherever as the fill with the bins on the road. 18) The contractor should collect the garbage with Department CCS vehicles from anywhere in the Zone as directed by the Departmental officers. 19) After completion of the Agreement period the contractor has to handover the Department CCS vehicles in good condition to GVMC otherwise the EMD?s and FSD?s if any will be forfeited. 20) The contractor should submit the Servicing Report and Good Condition Report of CCS vehicles every week to Executive Engineer (Mech.), GVMC, otherwise fine will be imposed. 21) The contractor should sweep the roads from various places in Zone as per the programme given by the AMOH / Engineer / concerned Incharge of P.H. Section of Greater Visakhapatnam Municipal Corporation, Visakhapatnam. 22) The work has to be completed within the amount bid by the contractor/agency. If the costs tend to increase before the stipulated end of the contract period as per work order, such extra costs have to be borne by the contractor/agency themselves only. 23) If due to any reason there is a balance garbage left at the end of the day in CCS/GTS station, the contractor is bound to provide additional vehicles/trippers for making the zero garbage at the CCS. The corresponding fuel expenses, hire and any other charges shall be borne by the contractor. 24) The payment will be made after completion of the work satisfactorily as certify by the concern officer of PH Section and GPS data which was applicable and also whenever funds are available in GVMC 25) The Commissioner, GVMC have right to accept / cancel / extend the tender at any time or at any stage without assigning any reason.

Legal Terms & Conditions

Details

as per NIT and tender document

as per NIT and tender document

Procedure for Bid Submission

Details

The bidder shall submit his response through Bid submission to the tender on eProcurement platform at www.apeprocurment.gov.in by following the procedure giv...

The bidder shall submit his response through Bid submission to the tender on eProcurement platform at www.apeprocurment.gov.in by following the procedure given below. The bidder would be required to register on the e-procurement market place https://tender.apeprocurement.gov.in and submit their bids online. Offline bids shall not be entertained by the Tender Inviting Authority for the tenders published in e-procurement platform. The bidders shall submit their eligibility and qualification details, Technical bid, Financial bid etc., in the online standard formats displayed in eProcurement web site. The bidders shall upload the scanned copies of all the relevant certificates, documents etc., in support of their eligibility criteria/technical bids and other certificate/documents in the eProcurement web site. The bidder shall sign on the statements, documents, certificates, uploaded by him, owning responsibility for their correctness/authenticity. The bidder shall attach all the required documents for the specific tender after uploading the same during the bid submission as per the tender notice and bid document. The Bidder shall also ensure prior to Final Bid submission that the Encryption certificate present in the DSC Key token is the same as that mapped into his Profile page in the Eprocurement system. Service provider shall not be responsible for Non-submission of Bid in case there is a variance in the Encryption certificate between the Key token and the Uploaded certificate in the Bidders profile in the Eprocurement system. Registration with eProcurement platform: For registration and online bid submission bidders may contact HELP DESK. https://tender.apeprocurement.gov.in Digital Certificate authentication: The bidder shall authenticate the bid with his Digital Certificate for submitting the bid electronically on eProcurement platform and the bids not authenticated by digital certificate of the bidder will not be accepted on the eProcurement platform. For obtaining Digital Signature Certificate, you may please Contact: You may please Contact Registration Authorities of any Certifying Authorities in India. The list of CAs are available by clicking the link https://tender.apeprocurement.gov.in/digital-signature.html# 3. Hard copies: i) Vide ref. G.O.Ms.No.174, I&CAD dept dated:1-9-2008, submission of original hard copies of the uploaded scanned copies of Proof of online Payment (Remittance)/BG towards EMD by participating bidders to the tender inviting authority before the opening of the price bid is dispensed forthwith. ii) All the bidders shall invariably upload the scanned copies of Proof of online Payment (Remittance)/BG in eProcurement system and this will be the primary requirement to consider the bid responsive. iii) The department shall carry out the technical evaluation solely based on the uploaded certificates/documents, Proof of online Payment (Remittance)/BG towards EMD in the eProcurement system and open the price bids of the responsive bidders. iv) The department will notify the successful bidder for submission of original hardcopies of all the uploaded documents Proof of online Payment (Remittance)/BG towards EMD prior to entering into agreement. v) The successful bidder shall invariably furnish the original Proof of online Payment (Remittance)/BG towards EMD, Certificates/Documents of the uploaded scan copies to the Tender Inviting Authority before entering into agreement, either personally or through courier or post and the receipt of the same within the stipulated date shall be the responsibility of the successful bidder. The department will not take any responsibility for any delay in receipt/non-receipt of original Proof of online Payment (Remittance)/BG towards EMD, Certificates/Documents from the successful bidder before the stipulated time. On receipt of documents, the department shall ensure the genuinity of the Proof of online Payment (Remittance)/BG towards EMD and all other certificates/documents uploaded by the bidder in eProcurement system. In support of the qualification criteria before concluding the agreement. 4. The GO. Ms. No. 174 -I&CAD dated: 1-9-2008 Deactivation of Bidders If any successful bidder fails to submit the original hard copies of uploaded certificates/documents, Proof of online Payment (Remittance)/BG towards EMD within stipulated time or if any variation is noticed between the uploaded documents and the hardcopies submitted by the bidder, as the successful bidder will be suspended from participating in the tenders on eProcurement platform for a period of 3 years. The eProcurement system would deactivate the user ID of such defaulting bidder based on the trigger/recommendation by the Tender Inviting Authority in the system. Besides this, the department shall invoke all processes of law including criminal prosecution of such defaulting bidder as an act of extreme deterrence to avoid delays in the tender process for execution of the development schemes taken up by the government. Other conditions as per tender document are applicable. The bidder is requested to get a confirmed acknowledgement from the Tender Inviting Authority a proof of Hardcopies submission to avoid any discrepancy. 5. Payment of EMD: It is mandatory for all participant bidders to electronically pay EMD Online by utilizing the 'Payment Gateway Service on E-Procurement platform'. The Electronic Payment Gateway accepts all Master and Visa Credit Cards issued by any bank and Direct Debit facility/Net Banking/NEFT payment modes through ICICI Bank and/or Axis Bank Payment Gateways to facilitate the transaction. This is in compliance as per G.O.Ms. 08 dated 08.05.2016. A GST of 18.00% + Bank charges on the transaction amount payable to APTS shall be applicable. In addition to this, Bidders can also pay the EMD through Download of PDF format of RTGS Challan for respective Payment gateway and pay the EMD through their Parent Bank account. Once the EMD is received by the EProcurement application, Bidders can automatically continue with their Bid Submission online. IMPORTANT NOTE REGARDING EMD PAYMENT: 1. Bidders are encouraged to use only Net banking facility for payment of EMDs as far as possible for faster refunds in case of unsuccessful Bids for the Tender. 2. Bidders are advised not to use RTGS Challan downloads at the penultimate hour of Bid submission closing as any delay by their banker would not enable Bid submission on the platform. Please allow a minimum of 60 minutes for enabling 'Continuation of Bid Submission' from the time the Pool Account receives credit of the EMD from the Bidders Bank for both NEFT and RTGS Transfers. For RTGS Transfers, the Pool Account can get immediate credit whereas NEFT transfers would follow RBI Payment Cycle time. 3. Bidders are advised to pay EMD Online atleast T-1 or T-2 days before Bid submission closing date (T= Bid submission closing date) to avoid last minute delays and denials of successful Bid submission and to take care of any delays in Banking procedures. Un Successful Bidder EMD Refund process: - The bid is declared unsuccessful, under the following circumstances. Bid submitted by the bidder is not the lowest bid. Upon Finalization of the L1 Bid. Technical Disqualification of the Bid in case of 2 cover system. EMD paid but bid not submitted EMD refund will be initiated by the Tender Inviting Authority directly and through Online only and through the same payment channels as EMD received by the Department. (RTGS / NEFT /Credit Card /Debit Card refund), within 30 days from the date of publishing the Decision / Result. However, Service Provider /GoAP will not be held responsible for the delays occurring due to banking channels/procedures/processes of the respective vendor. IMPORTANT NOTE REGARDING EMD REFUNDS: Bidders are requested to use discretion in their choice of payment channel for remittance of EMD. Time taken for Refunds under Ideal conditions: 1. Net Banking / NEFT / RTGS Challan: One (1) Banking Business Day from time of initiation of refund by Tender Inviting Authority subject to RTGS/NEFT timings of RBI. 2. Credit card/ Debit card: 7-10 working days from time of initiation of refund by the Tender Inviting Authority. However, this may be longer in case of certain bank cards. In case of delays, bidders are requested to contact the Card issuing Bank for faster resolution. 6. Payment of Transaction Fee: It is mandatory for all the participant bidders from 1st January 2006 to electronically pay a Non-refundable Transaction fee to M/s. APTS , the service provider through 'Payment Gateway Service on E-Procurement platform'. The Electronic Payment Gateway accepts all Master and Visa Credit Cards issued by any bank and Direct Debit facility/Net Banking of ICICI Bank, Axis Bank to facilitate the transaction. This is in compliance as per G.O.Ms. 13 dated 07.05.2006. A GST of 18.00% + Bank charges on the transaction amount payable to APTS shall be applicable. The participating bidders will pay a transaction fee @ 0.03% of ECV (estimated contract value) with a cap of Rs.10,000/- (Rupees ten thousand only) for all works with ECV upto Rs.50 crores, and Rs.25,000/- (Rupees twenty five thousand only) for works with ECV above Rs.50 crores, at the time of bid submission electronically. For tenders wherever ECV is not available i.e., for goods and services, the transaction fee shall be calculated on quoted value. GST as levied by the GOI on transaction fee, electronic payment gateway charges shall be borne by the bidders. 7. Corpus Fund: As per GO MS No.4 User departments shall collect 0.04% of ECV (estimated contract value) with a cap of Rs. 10,000 (Rupees ten thousand only) for all works with ECV upto Rs.50 Crores, and Rs. 25,000/- (Rupees twenty-five thousand only) for works with ECV above Rs.50 Crores, from successful bidders on eProcurement platform before entering into agreement / issue of purchase orders, towards eprocurement fund in favour of Managing Director, APTS . There shall not be any charge towards eProcurement fund in case of works, goods and services with ECV less than and upto Rs. 10 lakhs 8. Tender Document: The bidder is requested to download the tender document and read all the terms and conditions mentioned in the tender Document and seek clarification if any from the Tender Inviting Authority. Any offline bid submission clause in the tender document could be neglected. The bidder has to keep track of any changes by viewing the Addendum/Corrigenda issued by the Tender Inviting Authority on time-to- time basis in the E-Procurement platform. The Department calling for tenders shall not be responsible for any claims/problems arising out of this. 9. Bid Submission Acknowledgement: The bidder shall complete all the processes and steps required for Bid submission. The system will generate an acknowledgement with a unique bid submission number after completing all the prescribed steps and processes by the bidder. Users may also note that the bids for which an acknowledgement is not generated by the e-procurement system are treated as invalid or not saved in the system. Such invalid bids are not made available to the Tender Inviting Authority for processing the bids. The Government of AP are not responsible for incomplete bid submission by users.

Enquiry Forms

PQ Stage

Form NameTypeSupport DocDescription
Key Critical EquipmentStandardNoN/A
Previously Executed worksStandardNoN/A
Work Done as a Prime ContractorStandardNoN/A
Key PersonnelStandardNoN/A
Works On Hand/Tendered DetailsStandardNoN/A
Similar Work DetailsStandardNoN/A
Eligibility CriteriaStandardNoN/A

Commercial Stage

Form NameTypeSupport DocDescription
Percentage Wise RateSecureNoN/A

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

NIT - CCS - MSF IV.doc

NIT - CCS MSF IV

Tender doc - CCS - MSF IV.doc

Tender doc - CCS - MSF IV

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Bidding Process

Process Timeline

PQ Stage

1. PQ Stage 09-04-2026 16:00

Commercial Stage

1. Commercial Stage 10-04-2026 16:00

Depends on: PQ Stage