Bid Publish Date
01-Aug-2026, 10:26 am
Bid End Date
11-Aug-2026, 11:00 am
Location
Progress
Quantity
39
Category
M9425150005
Bid Type
Two Packet Bid
Meja Urja Nigamplimited invites bids for the supply of security equipment (scope: goods supply only) with a potential quantity variation up to 25% of bid quantity during contract and again during the currency of the contract at contracted rates. The delivery period calculations start from the last date of the original delivery order, with a minimum extension of 30 days if options are exercised. Bidders must quote a single price that includes all cost components and ensure compliance with all ATC clauses. The purchase involves a standard risk-sharing approach and requires compliance with the vendor’s TReDS participation via M1xchange. A strong emphasis on warranty from supply date (not less than 18 months) and usage-based validation (12 months from use) is highlighted, with no separate warranty certificate required at delivery. GST rate and HSN code must be clearly stated.
Key differentiators include the explicit 18-month warranty window, requirement to provide Make and Model, and stamped Technical Specifications with the bid documents to avoid rejection. The procurement is organized by a government/utility arm associated with NTPC-Meja-MUNPL, emphasizing transparent payment terms and mandatory interchangeability/fitment compliance.
EMD amount and exact payment milestones to be confirmed in final PO
Delivery period triggered from last date of original delivery order with option-based extensions
100% payment within 30 days of receipt and acceptance; originals accompany delivery
100% payment within 30 days after material receipt and site acceptance; original documents required at delivery to avoid payment delays
Delivery period can be extended by the option clause; additional time = (increased quantity / original quantity) × original delivery period, minimum 30 days
Penalty terms not explicitly listed; contract follows standard LCs with delivery-based risk; ensure compliance per ATC
Must be willing to participate via M1xchange (TReDS)
Provide Make and Model of offered product with stamped technical specifications
Submit GST rate and HSN code; maintain compliance with all specified terms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
M9415003006 , M9415811005 , M9425150005 , M9447027007 , M9447027009 , M9492310043 , M9447027010 , M9492310044 , M9492310045 , M9492310046
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Prayagraj
Delivery Pincodes
212301
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Narsingh Yadav | 212301,post office :kohrar, Meja | Prayagraj | Uttar Pradesh | 212301 | 6 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
M9415003006
LOADCELL WITH MOUNTING ACCESSORIES,BR022
M9415811005
SPEED SENSOR WITH WHEEL ASSEMBLY
M9425150005
BELT SCALE PANEL, BCW DS, MICRO CONTROLL
M9447027007
Weighing Frame with Idlers Make- IPA
M9447027009
Belt Scale Module, Make-IPA
M9492310043
JUNCTION BOX 1 IN 1 OUT-POLYCAR
M9447027010
FGD MECHANICAL ASSEMBLY WITH IDLERS
M9492310044
REMOTE DISPLAY MODEL-RD185A1
M9492310045
JUNCTION BOX 4 IN 1 OUT FOR LOAD CELL
M9492310046
JUNCTION BOX 1 IN 1 OUT- SPEED SENSOR
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 10 | M9415003006 | LOADCELL WITH MOUNTING ACCESSORIES,BR022 | 6 | st | [email protected] | 120 | |
| 20 | M9415811005 | SPEED SENSOR WITH WHEEL ASSEMBLY | 3 | no | [email protected] | 120 | |
| 30 | M9425150005 | BELT SCALE PANEL, BCW DS, MICRO CONTROLL | 2 | no | [email protected] | 120 | |
| 40 | M9447027007 | Weighing Frame with Idlers Make- IPA | 10 | no | [email protected] | 120 | |
| 50 | M9447027009 | Belt Scale Module, Make-IPA | 2 | no | [email protected] | 120 | |
| 60 | M9492310043 | JUNCTION BOX 1 IN 1 OUT-POLYCAR | 2 | no | [email protected] | 120 | |
| 70 | M9447027010 | FGD MECHANICAL ASSEMBLY WITH IDLERS | 8 | set | [email protected] | 120 | |
| 80 | M9492310044 | REMOTE DISPLAY MODEL-RD185A1 | 2 | no | [email protected] | 120 | |
| 90 | M9492310045 | JUNCTION BOX 4 IN 1 OUT FOR LOAD CELL | 2 | no | [email protected] | 120 | |
| 100 | M9492310046 | JUNCTION BOX 1 IN 1 OUT- SPEED SENSOR | 2 | no | [email protected] | 120 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply of goods
Financial statements or turnover proof
EMD/Security deposit receipt (as applicable)
Stamped & signed Technical Specifications
OEM authorization or make/model documentation
GST rate and HSN code disclosure
Key insights about UTTAR PRADESH tender market
Bidders must register on the M1xchange platform for TReDS, provide make and model, stamped technical specifications, GST rate and HSN code, and submit all mandatory documents (GST, PAN, experience, financials) with the bid. Ensure acceptance of 18-month warranty terms and 30-day payment terms.
Submit GST certificate, PAN, experience certificates for similar goods, financial statements, EMD/Security deposit (as applicable), stamped technical specifications, OEM authorization or make/model documentation, and GST rate/HSN disclosure to avoid bid rejection.
Warranty is 18 months from the date of supply or 12 months from the date of first use, whichever is earlier. No separate warranty certificate is required; terms apply to the material against the PO.
Delivery extensions arise from the option clause allowing up to 25% quantity variation during/after contract. Extension time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum extension of 30 days.
The contract requires 100% payment within 30 days after receipt and site acceptance of the material; original, stamped documents must accompany delivery to avoid payment delays.
No separate interchangeability/fitment certificate is required; terms are binding on the supplier as per the PO, with the certificate implied through compliance and acceptance.
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS