Progress
RAThe procurement is issued by the Indian Army under the Department Of Military Affairs for the supply of Structure of Relocation of Op Wks Assets Small Store Shelters, along with Construction Materials, Electrical Items, Furniture Items, Tools and Plants. The estimated contract value is ₹9,48,000 with an EMD of ₹28,440. The project scope spans multiple item categories and requires installation/ commissioning by OEM resources or authorized resellers. Bidders must ensure products have a minimum 7 years residual life and are not declared end-of-life by the OEM. The contract grants an option to the purchaser to modify quantities by ±50% during and after award, with delivery timelines linked to original delivery periods and extended time rules. This tender emphasizes non-disclosure compliance, GST considerations, and vendor-code creation prerequisites. This opportunity targets suppliers with govt experience and the ability to fulfill diversified military supply needs.
EMD amount: ₹28,440
Estimated contract value: ₹9,48,000
Experience: minimum 2 years in govt/PSU supply
Installation/Training: by OEM-certified personnel
Quantity variation: ±50% allowed
ND declaration required with bid
EMD and performance-related terms for bidder eligibility
Delivery/quantity flexibilities within ±50% with timing rules
Mandatory OEM installation/ training and NDA obligations
GST payable by bidder; reimbursement as actuals or at applicable rate; no responsibility on bidder for GST selection
Delivery period linked to original delivery date; extended time calculated by (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
LD, if any, to be defined in contract; minimum 30 days extension rule applies for delays
2+ years govt/PSU supply experience in similar product categories
Not under liquidation or court proceedings; clear financial health
Must provide OEM authorization or OEM-certified reseller status
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | K M CONSTRUCTION Under PMA | - | 31-08-2026 01:52:30 | |
| 2 | M/S HARJINDER SINGH Under PMA | - | 09-09-2026 16:27:00 | |
| 3 | M/s JSB CONSTRUCTION Under PMA | - | 09-09-2026 11:50:28 | |
| 4 | M/S M.K. TRADERS Under PMA | - | 09-09-2026 15:21:54 | |
| 5 | M/S SUBHADRA STEEL Under PMA | - | 09-09-2026 11:44:18 | |
| 6 | M/S Tenzing Enterprises Under PMA | - | 09-09-2026 16:45:39 | |
| 7 | SR ENTERPRISE Under PMA | - | 09-09-2026 13:35:29 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SR ENTERPRISE(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Supply of Structure of Reloc of Op Wks Assets Small Store Shelter,Supply of Construction Material,S | |
| L2 | M/S M.K. TRADERS (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Supply of Structure of Reloc of Op Wks Assets Small Store Shelter,Supply of Construction Material,S | |
| L3 | M/s JSB CONSTRUCTION (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Supply of Structure of Reloc of Op Wks Assets Small Store Shelter,Supply of Construction Material,S | |
| L4 | M/S HARJINDER SINGH (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Supply of Structure of Reloc of Op Wks Assets Small Store Shelter,Supply of Construction Material,S | |
| L5 | M/S SUBHADRA STEEL (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Supply of Structure of Reloc of Op Wks Assets Small Store Shelter,Supply of Construction Material,S |
Start
12-Sep-2026, 7:00 pm
End
14-Sep-2026, 7:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
10
Category
Supply of Structure of Reloc of Op Wks Assets Small Store Shelter
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
474
Past Performance
50 %
Warranty Period
1 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supply of Structure of Reloc of Op Wks Assets Small Store Shelter , Supply of Construction Material , Supply of Electrical items , Supply of Furniture items , Supply of tools and plants
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Pre-Bid Date
05-09-2026 09:00:00
Pre-Bid Venue
54 Engineer Regiment, Solmara Cantt, Tezpur
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Sonitpur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Sonitpur | Sonitpur | - | - | 2 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply of Structure of Reloc of Op Wks Assets Small Store Shelter
Supply of Structure of Reloc of Op Wks Assets Small Store Shelter
Supply of Construction Material
Supply of Construction Material
Supply of Electrical items
Supply of Electrical items
Supply of Furniture items
Supply of Furniture items
Supply of tools and plants
Supply of tools and plants
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply of Structure of Reloc of Op Wks Assets Small Store Shelter | Supply of Structure of Reloc of Op Wks Assets Small Store Shelter | 2 | nos | epo@54 | 90 | |
| 2 | Supply of Construction Material | Supply of Construction Material | 2 | as per store list att | epo@54 | 90 | |
| 3 | Supply of Electrical items | Supply of Electrical items | 2 | as per store list att | epo@54 | 90 | |
| 4 | Supply of Furniture items | Supply of Furniture items | 2 | as per store list att | epo@54 | 90 | |
| 5 | Supply of tools and plants | Supply of tools and plants | 2 | as per store list att | epo@54 | 90 |
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Experience certificates showing govt/PSU supply in last 2 years
Contract copies for similar categories
Non-disclosure declaration on bidder’s letterhead
OEM authorization or OEM-certified reseller credentials
Key insights about ASSAM tender market
Bidders must meet eligibility criteria, submit PAN, GSTIN, cancelled cheque, EFT mandate, and ND declaration. Provide 2+ years govt/PSU supply experience with contract copies. Ensure OEM installation capability and non-obsolescence with at least 7 years market life. EMD is ₹28,440; value ₹9.48 Lakh.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, ND declaration, and contracts showing 2+ years govt/PSU experience. OEM authorization or OEM-certified reseller credentials must be provided. Bidder must also upload vendor-code creation documents as specified.
The Earnest Money Deposit (EMD) for this tender is ₹28,440. It accompanies the bid submission and is typically refundable/not adjusted against contract value as per standard government norms, subject to bid validity and withdrawal/defect conditions.
The purchaser may increase or decrease quantity by up to 50% at award and during currency. Delivery timelines extend proportionally to the adjusted quantity, with a minimum extension of 30 days. Actual delivery must align with original or extended delivery period calculations.
Installation and commissioning must be performed by the OEM or an OEM-certified resource or an authorized reseller. Training, if applicable, should be included per scope, ensuring adherence to product standards and site-specific deployment requirements.
Bidders must offer products with at least 7 years residual market life and not declared end-of-life by the OEM. This ensures ongoing support and availability throughout the contract period and beyond installation.
GST responsibility lies with the bidder. Reimbursement will be at actual GST or the lower applicable rate, subject to the quoted GST percentage, ensuring no excess reimbursement beyond statutory rates.
The tender covers the supply of Structure of Relocation of Operation Work Assets Small Store Shelters, construction materials, electrical items, furniture, tools, and plants. The BoQ lists five items, with the exact quantities and specifications to be confirmed during bid evaluation.