TenderDekho Logo
Closed GEM

Mangalore Refinery & Petrochemicals Limited MRPL procurement GeM 2026 Tender MRPL Materials Department 25% Quantity Option 2026

Bid Publish Date

05-Jan-2026, 4:56 pm

Bid End Date

23-Jan-2026, 3:00 pm

Generate Docs

Progress

Issue05-Jan-2026, 4:56 pm
Technical23-01-2026 14:09:39
Financial
Award24-Feb-2026, 3:39 am
Explore all 4 tabs to view complete tender details

Quantity

119

Category

1000181889

Bid Type

Two Packet Bid

Key Highlights

  • MRPL procurement via GeM portal for Materials Department
  • 25% quantity increase/decrease option with contracted rates
  • Delivery-extension formula tied to original delivery period (minimum 30 days)
  • GST guidance: bidders must determine applicable GST; reimbursement as actuals or lower rates
  • Mandatory vendor-code documents: PAN, GSTIN, cancelled cheque, EFT mandate
  • Invoicing to be in consignee's name with consignee GSTIN; GST portal screenshot required
  • Nominated Inspection Agency to conduct pre-shipment or final inspection (agency TBD)
  • Termination rights for non-performance, delivery failure, bankruptcy or misrepresentation

Categories 94

Tender Overview

The procurement is issued by Mangalore Refinery & Petrochemicals Limited (MRPL) under the Materials Department through the GeM portal. The tender involves a large, multi-item catalog (50 BOQ items) with no explicit product or quantity details visible in the data. A key differentiator is the option clause allowing +/- 25% quantity adjustments at contracted rates, with delivery time adjustments tied to the original delivery period. GST guidance is provided for quoting, with reimbursement linked to actuals or applicable rates. The tender also mandates specific onboarding documents (PAN, GSTIN, cancelled cheque, EFT mandate) and requires invoicing in the consignee’s GSTIN. A nominated inspection agency will be appointed. Unique terms emphasize contract termination rights for non-performance and delivery failure. This tender emphasizes compliance, invoicing discipline, and flexible quantity management within a 25% band, making supplier readiness and financial controls critical for participation.

Key Specifications

  • Product/service names not listed in technical specs

  • Total BOQ items: 50 with N/A quantity/unit in data

  • Option clause: ±25% quantity at contracted rates

  • Delivery period calculations: (Additional quantity ÷ Original quantity) × Original delivery period, min 30 days

  • GST handling: actuals or lower rates; bidder bears GST computation

  • Invoicing: consignee name and GSTIN; GST portal payment screenshot

  • Inspection: Nominated Inspection Agency to be appointed by MRPL

Terms & Conditions

  • Option to modify quantity by ±25% during contract

  • GST compliance and reimbursement as per actuals or lower rate

  • Mandatory vendor-code documents (PAN, GSTIN, cancelled cheque, EFT mandate)

Important Clauses

Payment Terms

GST to be claimed/reimbursed as actuals or lower rate; invoice raised in consignee name; GST portal payment screenshot required

Delivery Schedule

Delivery period may extend via option clause; additional time = (extra quantity/original quantity) × original delivery period; minimum 30 days

Penalties/Liquidated Damages

Contract may be terminated for non-delivery, misrepresentation, bankruptcy, or failure to meet material terms

Bidder Eligibility

  • Must submit PAN, GSTIN, cancelled cheque, and EFT mandate for Vendor Code Creation

  • Invoicing must align with consignee GSTIN; bidder must be GST compliant

  • Compliance with option clause for quantity adjustments and delivery extensions

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

1000181889 , 1000181890 , 1000181892 , 1000181893 , 1000181895 , 1000181896 , 1000181897 , 1000181898 , 1000181899 , 1000181900 , 1000181901 , 1000181902 , 1000181903 , 1000181904 , 1000181905 , 1000181907 , 1000181908 , 1000181909 , 1000185887 , 1000185888 , 1000181911 , 1000181920 , 1000181921 , 1000181922 , 1000181923 , 1000181925 , 1000181926 , 1000181927 , 1000181929 , 1000181934 , 1000181935 , 1000181938 , 1000181939 , 1000181940 , 1000181941 , 1000181942 , 1000181943 , 1000181944 , 1000181945 , 1000181946 , 1000181947 , 1000181948 , 1000181949 , 1000185894 , 1000181950 , 1000181951 , 1000181952 , 1000181953 , 1000181954 , 1000181955

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8796053.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 50 Items Sign in for GEM prices

#1

1000181889

DRIVE COUPLING FOR NEW TRUCK LOADING SYSTEM, PRT NO H320000003 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE AND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#2

1000181890

FIXED DISPLACEMENT VANE PUMP (26.4CC/REV.) FOR NEW TRUCK LOADING SYSTEM, PRT NO H020000017 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISC HARGE AND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#3

1000181892

3/8 INCH HP NEEDLE VALVE FOR NEW TRUCK LOADING SYSTEM, PRT NO H110000038 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE AND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#4

1000181893

UNLOADING RELIEF VALVE (URV) FOR NEW TRUCK LOADING SYSTEM, PRT NO H100000001 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE AND TELE SCOPIC CHUTE

1 ea Delivery: 140 days
#5

1000181895

RETURN LINE FILTER FOR NEW TRUCK LOADING SYSTEM, PRT NO H130000144 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE AND TELESCOPIC CHU TE

1 ea Delivery: 140 days
#6

1000181896

DOUBLE PILOT OPERATED CHECK VALVE FOR NEW TRUCK LOADING SYSTEM, PRT NO H090000016 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE AND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#7

1000181897

THROTTLE WITH REVERSE CHECK VALVE - NG-10 SIZE FOR NEW TRUCK LOADING SYSTEM, PRT NO H110000004 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE AND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#8

1000181898

PILOT OPERATED CHECK VALVE FOR NEW TRUCK LOADING SYSTEM, PRT NO H090000017 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE AND TELESC OPIC CHUTE

1 ea Delivery: 140 days
#9

1000181899

NEEDLE VALVE (SIZE-1 INCH) FOR NEW TRUCK LOADING SYSTEM, PRT NO H110000009 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE AND TELESCOPI C CHUTE

1 ea Delivery: 140 days
#10

1000181900

MANIFOLD FOR TELESCOPIC CHUTE/DISCHARGE GATE FOR NEW TRUCK LOADING SYSTEM, PRT NO H030000013 AS PER DWG NO MTIL-MEL-961-H-02 FOR DI SCHARGE AND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#11

1000181901

MANIFOLD FOR UNLOADING RELIEF VALVE FOR NEW TRUCK LOADING SYSTEM, PRT NO H030000003 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE A ND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#12

1000181902

HYDRAULIC CYLINDER FOR SILO DISCHARGE GATE (63 Dia BORE x 36 Dia ROD x 475 mm STROKE) FOR NEW TRUCK LOADING SYSTEM, PRT NO H050000213 AS P ER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

2 ea Delivery: 140 days
#13

1000181903

HYDRAULIC CYLINDER FOR TELESCOPIC CHUTE (63 Dia BORE x 36 Dia ROD x 1500 mm STROKE) FOR NEW TRUCK LOADING SYSTEM, PRT NO H050000095 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

2 ea Delivery: 140 days
#14

1000181904

PRESSURE LINE FILTER FOR NEW TRUCK LOADING SYSTEM, PRT NO H130000067 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCO PIC CHUTE

1 ea Delivery: 140 days
#15

1000181905

3/4 INCH H.P BALL VALVE FOR NEW TRUCK LOADING SYSTEM, PRT NO H080000002 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCO PIC CHUTE

1 ea Delivery: 140 days
#16

1000181907

2 INCH RUBBER EXPANSION JOINT FOR NEW TRUCK LOADING SYSTEM, PRT NO H170000054 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND T ELESCOPIC CHUTE

1 ea Delivery: 140 days
#17

1000181908

HYDRAULIC OIL COOLER (AIR BLAST TYPE) (3PH/415V AC, 0.75KW/50HZ, 1450 RPM MOTOR-SIEMENS MAKE) FOR NEW TRUCK LOADING SYSTEM, PRT NO H 210000025 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#18

1000181909

OVER CENTRE VALVE FOR NEW TRUCK LOADING SYSTEM, PRT NO H100000040 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#19

1000185887

SNUBBER FOR NEW TRUCK LOADING SYSTEM, PRT NO H190000114 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

2 ea Delivery: 140 days
#20

1000185888

SNUBBER FOR NEW TRUCK LOADING SYSTEM, PRT NO H190000113 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

2 ea Delivery: 140 days
#21

1000181911

CHECK VALVE- MSR-15-KE FOR NEW TRUCK LOADING SYSTEM, PRT NO H090000047 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELE SCOPIC CHUTE

1 ea Delivery: 140 days
#22

1000181920

SEAL KIT FOR DISCHARGE GATE FOR NEW TRUCK LOADING SYSTEM, PRT NO H050000112 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE

2 ea Delivery: 140 days
#23

1000181921

SEAL KIT FOR TELESCOPIC CHUTE FOR NEW TRUCK LOADING SYSTEM, PRT NO H050000214 AS PER DWG NO MTIL-MEL-961-H-02 FOR TELESCOPIC CHUTE

2 ea Delivery: 140 days
#24

1000181922

PRESSURE LINE FILTER ELEMENTFOR NEW TRUCK LOADING SYSTEM, PRT NO H130000069 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

4 ea Delivery: 140 days
#25

1000181923

RETURN LINE FILTER ELEMENT FOR NEW TRUCK LOADING SYSTEM, PRT NO H130000080 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

4 ea Delivery: 140 days
#26

1000181925

MINIMESH COUPLING FOR NEW TRUCK LOADING SYSTEM, PRT NO H310000100 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPI C CHUTE

1 ea Delivery: 140 days
#27

1000181926

BREATHER FOR NEW TRUCK LOADING SYSTEM, PRT NO H200000014 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

1 ea Delivery: 140 days
#28

1000181927

BELL HOUSING FOR NEW TRUCK LOADING SYSTEM, PRT NO H170000008 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHU TE

1 ea Delivery: 140 days
#29

1000181929

QUICK RELEASE COUPLING 3/8 INCH FOR NEW TRUCK LOADING SYSTEM, PRT NO H310000102 AS PER DWG NO MTIL-MEL-961-H-02 FOR DISCHARGE GATE AND TELESCOPIC CHUTE

8 ea Delivery: 140 days
#30

1000181934

SKIRT RUBBER FOR NEW TRUCK LOADING SYSTEM AS PER DWG NO MTIL-MEL-961-H-04

1 ea Delivery: 140 days
#31

1000181935

GUIDE ROLLER EN-8 FOR NEW TRUCK LOADING SYSTEM AS PER DWG NO MTIL-MEL-961-H-04

8 ea Delivery: 140 days
#32

1000181938

GUIDE BAR FOR NEW TRUCK LOADING SYSTEM AS PER DWG NO MTIL-MEL-961-M02 AND MTIL-MEL-961-M03

8 ea Delivery: 140 days
#33

1000181939

SEAL (920 MM LENGTH) FOR NEW TRUCK LOADING SYSTEM AS PER DWG NO MTIL-MEL-961-M02 AND MTIL-MEL-961-M03

8 ea Delivery: 140 days
#34

1000181940

SEAL RETAINER (900 MM LENGTH) FOR NEW TRUCK LOADING SYSTEM AS PER DWG NO MTIL-MEL-961-M02 AND MTIL-MEL-961-M03

4 ea Delivery: 140 days
#35

1000181941

BELLOW (SYNTHETIC MATERIAL) FOR NEW TRUCK LOADING SYSTEM AS PER DWG NO MTIL-MEL-961-M02 AND MTIL-MEL-961-M03

2 ea Delivery: 140 days
#36

1000181942

TOP DISCHARGE GATE BLADE UHMW BAR FOR WAGON LOADING SYSTEM AS PER PART NO M010000992

4 set Delivery: 140 days
#37

1000181943

BOTTOM DISCHARGE GATE BLADE UHMW BAR FOR WAGON LOADING SYSTEM AS PER PART NO M010000947

1 set Delivery: 140 days
#38

1000181944

COUPLING SLEEVEFOR WAGON LOADING SYSTEM AS PER PART NO H320000002

1 ea Delivery: 140 days
#39

1000181945

PUMP FOR WAGON LOADING SYSTEM AS PER PART NO H020000064

1 ea Delivery: 140 days
#40

1000181946

UNLOADING RELIEF VALVE FOR WAGON LOADING SYSTEM AS PER PART NO H100000021

1 ea Delivery: 140 days
#41

1000181947

PRESSURE LINE FILTER ELEMENTFOR WAGON LOADING SYSTEM, PRT NO H130000065

4 ea Delivery: 140 days
#42

1000181948

RETURN LINE FILTER ELEMENT FOR WAGON LOADING SYSTEM, PRT NO H130000027

8 ea Delivery: 140 days
#43

1000181949

BREATHER FOR WAGON LOADING SYSTEM, PRT NO H200000014

1 ea Delivery: 140 days
#44

1000185894

TDG/BDG FLOW CONTROL VALVE FOR WAGON LOADING SYSTEM, PRT NO H110000004

4 ea Delivery: 140 days
#45

1000181950

TOP DISCHARGE GATE FOR WAGON LOADING SYSTEM, PRT NO H050000043

2 ea Delivery: 140 days
#46

1000181951

BOTTOM DISCHARGE GATE FOR WAGON LOADING SYSTEM, PRT NO H050000043

1 ea Delivery: 140 days
#47

1000181952

CHUTE TRAVEL CYLINDER FOR WAGON LOADING SYSTEM, PRT NO H050000088

1 ea Delivery: 140 days
#48

1000181953

CHUTE UP/DOWN CYLINDER FOR WAGON LOADING SYSTEM, PRT NO H050000096

1 ea Delivery: 140 days
#49

1000181954

TEST WEIGHT CYLINDER FOR WAGON LOADING SYSTEM, PRT NO H050000176

2 ea Delivery: 140 days
#50

1000181955

CHUTE TRAVERSE ROLLER FOR WAGON LOADING SYSTEM, PRT NO M060000909

8 ea Delivery: 140 days

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate certified by Bank

5

GST Invoice and GST portal payment screenshot (GeM upload)

6

Vendor Code Creation documents

7

Any OEM authorizations or technical compliance certificates (if later specified)

Corrigendum Updates

1 Update
#1

Update

15-Jan-2026

Extended Deadline

23-Jan-2026, 3:00 pm

Opening Date

23-Jan-2026, 3:30 pm

Technical Results

S.No Seller Item Date Status
1
MERIT TECHNOLOGIES (INDIA) LIMITED   Under PMA
-23-01-2026 14:09:39

Financial Results

Rank Seller Price Item
L1
MERIT TECHNOLOGIES (INDIA) LIMITED   Under PMA
Item Categories : 1000181889,1000181890,1000181892,1000181893,1000181895,1000181896,1000181897,1000181898,1000181899,

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about KARNATAKA tender market

How to bid in MRPL tender for GeM 2026 procurement?

To participate, submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor-code creation; ensure invoicing in the consignee's GSTIN and provide GST portal payment screenshots. Review the option clause allowing +/-25% quantity changes and confirm delivery timelines per MRPL terms.

What documents are required for MRPL vendor registration and bid submission?

Submit PAN, GSTIN, cancelled cheque, EFT mandate, GST invoice, and GST portal payment screenshot. OEM authorizations or technical certificates may be needed later; ensure account creation on GeM and readiness to upload 50-item catalog details when released.

What is the quantity adjustment clause in MRPL tender terms?

The buyer may increase or decrease quantity by up to 25% at contracted rates. Delivery period extensions are calculated as (additional quantity ÷ original quantity) × original delivery period with a minimum of 30 days, and may extend further within contract terms.

When will MRPL specify item-specific technical standards and BOQ details?

Final item specifications, standards, and exact BOQ quantities will be released in the official tender documents. Bidders should monitor GeM MRPL notices for updates on item-wise requirements, inspection protocols, and OEM certification needs.

What are MRPL GST invoicing requirements for GeM bid submission?

Invoices must be raised in the consignee’s name with the consignee GSTIN; include GSTIN on the invoice and upload GST portal payment confirmation screenshots as part of the bid documentation.

What happens if MRPL encounters delivery or performance issues in this tender?

MRPL reserves rights to terminate contract or any part if material terms are breached, delivery commitments are not met, or the seller becomes insolvent; remedies include contract termination and potential re-tendering at contracted rates.

What is the inspection process for MRPL GeM tendered materials?

A nominated Inspection Agency will conduct inspections on MRPL’s behalf; the specific agency is to be confirmed in the final tender documents. Bidders should prepare for pre-shipment or final inspections per MRPL guidelines.

Are there any mandatory standards or certifications for MRPL procurement?

Current data does not specify exact standards; final tender documents will list required standards/certifications. Bidders should confirm IS/ISO or organization-specific requirements and obtain relevant certifications prior to submission.