TenderDekho Logo
Closed GEM

Invitation to Bid - Gang box 1 switch,Gang box 2 switch,Plug and socket,Doorbell switch,2 Pin Socket,Tube light,Tube li in SOUTH GOA, GOA

Bid Publish Date

13-May-2026, 3:17 pm

Bid End Date

03-Jun-2026, 4:00 pm

EMD

₹60,000

Progress

Issue13-May-2026, 3:17 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3143

Category

Plug and socket

Bid Type

Two Packet Bid

Categories 53

National Centre For Antarctic And Ocean Research (ncaor) invites bids for Gang box 1 switch, Gang box 2 switch, Plug and socket, Doorbell switch, 2 Pin Socket, Tube light, Tube light starter, LED bulb 9W, LED bulb 18W, LED Batten 10W, LED Batten 20W, LED Flood light, LED Panel, LED Round, GLS bulb, Halogen bulb, Halogen Lamp, Bulkhead Light, Copper wire, Wire Single Core, Wire Unsheathed, Wire 4 sqmm, Wire 6 sqmm, Flat copper wire, Flexible Cable, Cable 100 meters, Cable 4 sqmm, Cable 6 sqmm, Cable 10 sqmm, Cable 16 sqmm, Exhaust Fan 230mm, Exhaust Fan 305mm, Exhaust Fan PVC 150mm, Exhaust Fan PVC 200mm, Ceiling Fan, Wall Mounted Fan, Pedestal Fan, MCB 10A, MCB 20A, MCB 32A, MCB DP 10A, MCB DP 20A, MCB DP 32A, MCB DP 40A, MCB 3P 32A, MCB 3P 63A, MCB 4P 32A, MCB 4P 40A, MCB 4P 63A, RCCB, Copper Ring Lug, Connector, Fan Capacitor, Capacitor 10, Capacitor 30, Capacitor 40, Conduit 1 inch, Conduit 100 meters, Conduit 30 meters, Casing and Capping 2 meters, Capping 2 meters, Capping 1 inch, Cable Tie 200mm, Cable Tie 300mm, Universal Socket, Insulation Tape, Water proof Tape, PVC Grip, Screw self-head, Screw 100 pcs, Junction Box, DOL Starter, U Type Wire Clip 6mm, U Type Wire Clip 8mm, GI saddle 50 pcs, GI saddle 25mm in SOUTH GOA, GOA. Quantity: 3143. Submission Deadline: 03-06-2026 16: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Gang box 1 switch , Gang box 2 switch , Plug and socket , Doorbell switch , 2 Pin Socket , Tube light , Tube light starter , LED bulb 9W , LED bulb 18W , LED Batten 10W , LED Batten 20W , LED Flood light , LED Panel , LED Round , GLS bulb , Halogen bulb , Halogen Lamp , Bulkhead Light , Copper wire , Wire Single Core , Wire Unsheathed , Wire 4 sqmm , Wire 6 sqmm , Flat copper wire , Flexible Cable , Cable 100 meters , Cable 4 sqmm , Cable 6 sqmm , Cable 10 sqmm , Cable 16 sqmm , Exhaust Fan 230mm , Exhaust Fan 305mm , Exhaust Fan PVC 150mm , Exhaust Fan PVC 200mm , Ceiling Fan , Wall Mounted Fan , Pedestal Fan , MCB 10A , MCB 20A , MCB 32A , MCB DP 10A , MCB DP 20A , MCB DP 32A , MCB DP 40A , MCB 3P 32A , MCB 3P 63A , MCB 4P 32A , MCB 4P 40A , MCB 4P 63A , RCCB , Copper Ring Lug , Connector , Fan Capacitor , Capacitor 10 , Capacitor 30 , Capacitor 40 , Conduit 1 inch , Conduit 100 meters , Conduit 30 meters , Casing and Capping 2 meters , Capping 2 meters , Capping 1 inch , Cable Tie 200mm , Cable Tie 300mm , Universal Socket , Insulation Tape , Water proof Tape , PVC Grip , Screw self-head , Screw 100 pcs , Junction Box , DOL Starter , U Type Wire Clip 6mm , U Type Wire Clip 8mm , GI saddle 50 pcs , GI saddle 25mm

Authority Records

MINISTRY OF EARTH SCIENCESEARTH SCIENCES DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9303788.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 76 Items Sign in for GEM prices

#1

Gang box 1 switch

As per BOQ Item Specification Document

20 nos Delivery: 60 days
#2

Gang box 2 switch

As per BOQ Item Specification Document

50 nos Delivery: 60 days
#3

Plug and socket

As per BOQ Item Specification Document

30 nos Delivery: 60 days
#4

Doorbell switch

As per BOQ Item Specification Document

15 nos Delivery: 60 days
#5

2 Pin Socket

As per BOQ Item Specification Document

30 nos Delivery: 60 days
#6

Tube light

As per BOQ Item Specification Document

300 nos Delivery: 60 days
#7

Tube light starter

As per BOQ Item Specification Document

200 nos Delivery: 60 days
#8

LED bulb 9W

As per BOQ Item Specification Document

100 nos Delivery: 60 days
#9

LED bulb 18W

As per BOQ Item Specification Document

100 nos Delivery: 60 days
#10

LED Batten 10W

As per BOQ Item Specification Document

200 nos Delivery: 60 days
#11

LED Batten 20W

As per BOQ Item Specification Document

300 nos Delivery: 60 days
#12

LED Flood light

As per BOQ Item Specification Document

40 nos Delivery: 60 days
#13

LED Panel

As per BOQ Item Specification Document

20 nos Delivery: 60 days
#14

LED Round

As per BOQ Item Specification Document

20 nos Delivery: 60 days
#15

GLS bulb

As per BOQ Item Specification Document

100 nos Delivery: 60 days
#16

Halogen bulb

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#17

Halogen Lamp

As per BOQ Item Specification Document

20 nos Delivery: 60 days
#18

Bulkhead Light

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#19

Copper wire

As per BOQ Item Specification Document

20 coils Delivery: 60 days
#20

Wire Single Core

As per BOQ Item Specification Document

20 coils Delivery: 60 days
#21

Wire Unsheathed

As per BOQ Item Specification Document

20 coils Delivery: 60 days
#22

Wire 4 sqmm

As per BOQ Item Specification Document

20 coils Delivery: 60 days
#23

Wire 6 sqmm

As per BOQ Item Specification Document

20 coils Delivery: 60 days
#24

Flat copper wire

As per BOQ Item Specification Document

5 coils Delivery: 60 days
#25

Flexible Cable

As per BOQ Item Specification Document

5 coils Delivery: 60 days
#26

Cable 100 meters

As per BOQ Item Specification Document

5 coils Delivery: 60 days
#27

Cable 4 sqmm

As per BOQ Item Specification Document

5 coils Delivery: 60 days
#28

Cable 6 sqmm

As per BOQ Item Specification Document

5 coils Delivery: 60 days
#29

Cable 10 sqmm

As per BOQ Item Specification Document

10 coils Delivery: 60 days
#30

Cable 16 sqmm

As per BOQ Item Specification Document

5 coils Delivery: 60 days
#31

Exhaust Fan 230mm

As per BOQ Item Specification Document

25 nos Delivery: 60 days
#32

Exhaust Fan 305mm

As per BOQ Item Specification Document

25 nos Delivery: 60 days
#33

Exhaust Fan PVC 150mm

As per BOQ Item Specification Document

30 nos Delivery: 60 days
#34

Exhaust Fan PVC 200mm

As per BOQ Item Specification Document

30 nos Delivery: 60 days
#35

Ceiling Fan

As per BOQ Item Specification Document

50 nos Delivery: 60 days
#36

Wall Mounted Fan

As per BOQ Item Specification Document

20 nos Delivery: 60 days
#37

Pedestal Fan

As per BOQ Item Specification Document

20 nos Delivery: 60 days
#38

MCB 10A

As per BOQ Item Specification Document

30 nos Delivery: 60 days
#39

MCB 20A

As per BOQ Item Specification Document

50 nos Delivery: 60 days
#40

MCB 32A

As per BOQ Item Specification Document

30 nos Delivery: 60 days
#41

MCB DP 10A

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#42

MCB DP 20A

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#43

MCB DP 32A

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#44

MCB DP 40A

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#45

MCB 3P 32A

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#46

MCB 3P 63A

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#47

MCB 4P 32A

As per BOQ Item Specification Document

20 nos Delivery: 60 days
#48

MCB 4P 40A

As per BOQ Item Specification Document

30 nos Delivery: 60 days
#49

MCB 4P 63A

As per BOQ Item Specification Document

30 nos Delivery: 60 days
#50

RCCB

As per BOQ Item Specification Document

5 nos Delivery: 60 days
#51

Copper Ring Lug

As per BOQ Item Specification Document

50 nos Delivery: 60 days
#52

Connector

As per BOQ Item Specification Document

50 nos Delivery: 60 days
#53

Fan Capacitor

As per BOQ Item Specification Document

100 nos Delivery: 60 days
#54

Capacitor 10

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#55

Capacitor 30

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#56

Capacitor 40

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#57

Conduit 1 inch

As per BOQ Item Specification Document

5 roll Delivery: 60 days
#58

Conduit 100 meters

As per BOQ Item Specification Document

5 roll Delivery: 60 days
#59

Conduit 30 meters

As per BOQ Item Specification Document

1 roll Delivery: 60 days
#60

Casing and Capping 2 meters

As per BOQ Item Specification Document

100 nos Delivery: 60 days
#61

Capping 2 meters

As per BOQ Item Specification Document

100 nos Delivery: 60 days
#62

Capping 1 inch

As per BOQ Item Specification Document

100 nos Delivery: 60 days
#63

Cable Tie 200mm

As per BOQ Item Specification Document

20 pac Delivery: 60 days
#64

Cable Tie 300mm

As per BOQ Item Specification Document

20 pac Delivery: 60 days
#65

Universal Socket

As per BOQ Item Specification Document

30 nos Delivery: 60 days
#66

Insulation Tape

As per BOQ Item Specification Document

300 nos Delivery: 60 days
#67

Water proof Tape

As per BOQ Item Specification Document

3 nos Delivery: 60 days
#68

PVC Grip

As per BOQ Item Specification Document

20 pac Delivery: 60 days
#69

Screw self-head

As per BOQ Item Specification Document

10 box Delivery: 60 days
#70

Screw 100 pcs

As per BOQ Item Specification Document

10 box Delivery: 60 days
#71

Junction Box

As per BOQ Item Specification Document

10 nos Delivery: 60 days
#72

DOL Starter

As per BOQ Item Specification Document

5 nos Delivery: 60 days
#73

U Type Wire Clip 6mm

As per BOQ Item Specification Document

2 pac Delivery: 60 days
#74

U Type Wire Clip 8mm

As per BOQ Item Specification Document

2 pac Delivery: 60 days
#75

GI saddle 50 pcs

As per BOQ Item Specification Document

5 box Delivery: 60 days
#76

GI saddle 25mm

As per BOQ Item Specification Document

5 box Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer