ST030142049,ST030142045,ST030142043,STO30142052,ST030142046,ST030272692,ST030142034,ST030142038,ST0
Nlc India Limited
CUDDALORE, TAMIL NADU
Bid Publish Date
03-Apr-2025, 4:41 pm
Bid End Date
24-Apr-2025, 3:00 pm
Location
Progress
RAQuantity
1228
Nlc India Limited announces a tender for ST020380134, ST020380114, ST020011142, ST020380126, ST020380093, ST020380092, ST020011112, ST020380136, ST020380135, ST020011117, ST020380130, ST020380115, ST020380110, ST020380131, ST020380107, ST020380109, ST020380127, ST020380117, ST020010582, ST020380125, ST020011118, ST020011122, ST020380106, ST020380105, ST020380103, ST020380129, ST020380116, ST020380132, ST020380128, ST020010583, ST020380133, ST020380111 in CUDDALORE, TAMIL NADU. Quantity: 1228. Submission Deadline: 24-04-2025 15: 00: 00. Last date to apply is approaching fast!
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Nlc India Limited
CUDDALORE, TAMIL NADU
Nlc India Limited
CUDDALORE, TAMIL NADU
Nlc India Limited
CUDDALORE, TAMIL NADU
Nlc India Limited
CUDDALORE, TAMIL NADU
Nlc India Limited
CUDDALORE, TAMIL NADU
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | ST020380134 | IMPELLER(BRONZE) 3L3 PUMP | 1 | pieces | consignee2@tpsst2 | 90 |
| 2 | ST020380114 | PUMP SHAFT WITH ACCESSORIES-3L3 | 12 | set | consignee2@tpsst2 | 90 |
| 3 | ST020011142 | SHAFT SLEEVE (MS) - 3L3 PUMP | 48 | pieces | consignee2@tpsst2 | 90 |
| 4 | ST020380126 | COUPLING COMPLETE SET 3L3 PUMP | 12 | pieces | consignee2@tpsst2 | 90 |
| 5 | ST020380093 | WEARING RING (NECK RING)-3L3 PUMP | 20 | pieces | consignee2@tpsst2 | 90 |
| 6 | ST020380092 | STUFFING BOX BUSH - 3L3 PUMP | 24 | pieces | consignee2@tpsst2 | 90 |
| 7 | ST020011112 | GREASE CUP | 20 | pieces | consignee2@tpsst2 | 90 |
| 8 | ST020380136 | WATER THROWER 3L3 | 30 | pieces | consignee2@tpsst2 | 90 |
| 9 | ST020380135 | WATER SEAL PIPE 3L3 PUMP | 24 | pieces | consignee2@tpsst2 | 90 |
| 10 | ST020011117 | DISTANCE PIECE HYLAM | 24 | pieces | consignee2@tpsst2 | 90 |
| 11 | ST020380130 | SWING BOLT WITH NUT | 50 | pieces | consignee2@tpsst2 | 90 |
| 12 | ST020380115 | PUMP SHAFT- SDB 125/150 | 24 | set | consignee2@tpsst2 | 90 |
| 13 | ST020380110 | Water thrower for Beacon wier pump model | 24 | pieces | consignee2@tpsst2 | 90 |
| 14 | ST020380131 | IMPELLER SDB125/150 | 1 | pieces | consignee2@tpsst2 | 90 |
| 15 | ST020380107 | Distance piece for Beacon make pump mode | 24 | pieces | consignee2@tpsst2 | 90 |
| 16 | ST020380109 | Stuffing box bush for Beacon wier make p | 36 | pieces | consignee2@tpsst2 | 90 |
| 17 | ST020380127 | COUPLING COMPLETE SET | 8 | pieces | consignee2@tpsst2 | 90 |
| 18 | ST020380117 | Split gland for Beacon wier pump moel SD | 180 | set | consignee2@tpsst2 | 90 |
| 19 | ST020010582 | WEARING RING (BRONZE) -SDB125/150 PUMP | 16 | pieces | consignee2@tpsst2 | 90 |
| 20 | ST020380125 | SHAFT SLEEVE BWC 80/100 | 96 | pieces | consignee2@tpsst2 | 90 |
| 21 | ST020011118 | WEARING RING CASING CI | 16 | pieces | consignee2@tpsst2 | 90 |
| 22 | ST020011122 | AIR COCK | 8 | pieces | consignee2@tpsst2 | 90 |
| 23 | ST020380106 | IMPELLER (BRONZE) - BWC 80/100A | 1 | pieces | consignee2@tpsst2 | 90 |
| 24 | ST020380105 | BEARING COVER (NDE) - BWC 50/80 PUMP | 24 | pieces | consignee2@tpsst2 | 90 |
| 25 | ST020380103 | BEARING HOUSING (DE) CI - BWC 50/80 | 24 | pieces | consignee2@tpsst2 | 90 |
| 26 | ST020380129 | BEARING HOUSING NDE | 24 | pieces | consignee2@tpsst2 | 90 |
| 27 | ST020380116 | LATERN RING FOR ESP 50/80 | 48 | set | consignee2@tpsst2 | 90 |
| 28 | ST020380132 | CASING STUD WITH NUT | 336 | pieces | consignee2@tpsst2 | 90 |
| 29 | ST020380128 | COUPLING COMPLETE SET | 8 | pieces | consignee2@tpsst2 | 90 |
| 30 | ST020010583 | BEARING COVER (DE) CI - BWC 50/80 PUMP | 48 | pieces | consignee2@tpsst2 | 90 |
| 31 | ST020380133 | CASING WEAR RING | 16 | pieces | consignee2@tpsst2 | 90 |
| 32 | ST020380111 | IMPELLER-DIA 242mm FOR BWC 50/80 ESP CON | 1 | pieces | consignee2@tpsst2 | 90 |
Start
07-Aug-2025, 2:00 pm
End
08-Aug-2025, 2:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ********** Under PMA | - | 19-04-2025 20:44:49 | Evaluated |
| 2 | ********** Under PMA | - | 18-04-2025 12:42:15 | Evaluated |
| 3 | ********** Under PMA | - | 23-04-2025 15:26:35 | Evaluated |
| 4 | ********** Under PMA | - | 17-04-2025 17:23:47 | Evaluated |
Please sign in or create an account to view contract details and download result documents.
Key insights about TAMIL NADU tender market
The eligibility requirements include being a registered entity with valid business credentials, having relevant industry experience, and compliance with applicable local and national regulations. Bidders should also demonstrate prior delivery of similar products and possess the necessary technical capabilities.
Bidders must align their technical specifications with the requirements outlined in the tender document. This includes ensuring that all spare parts possess the necessary quality certifications and meet the operational standards specified by the Ministry of Coal. Compliance with recognized industry standards is essential to qualify for this tender.
The payment terms will be detailed in the tender documentation. Typically, successful bidders may be required to submit invoices upon delivery, which would be subject to thorough verification and acceptance by the Ministry of Coal. Adherence to stipulated payment timelines is crucial for timely reimbursement.
Micro, Small, and Medium Enterprises (MSEs) are provided with special provisions under this tender, which may include benefits like preferential evaluation criteria, financial advantages, and support in meeting compliance standards. This initiative encourages MSE participation in government procurement, fostering inclusivity in the tendering process.
Proposals must be submitted electronically via the designated online platform specified in the tender communications. Bidders are instructed to ensure that all documents, including technical and financial proposals, are uploaded in the accepted formats for consideration, ensuring compliance with submission guidelines.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS