Progress
Quantity
32
Bid Type
Two Packet Bid
Public procurement opportunity for North Lakhimpur Municipal Board LED Luminaire for High Bay Lighting (Q3) in LAKHIMPUR, ASSAM. Quantity: 32 issued by. Submission Deadline: 12-06-2026 14: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LED Luminaire for High Bay Lighting (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| STANDARDS | Installation and commissioning | Yes |
| STANDARDS | Scope of installation and commissioning | Installation and commissioning includes mounting of lights on roof hooks/fixture and making electrical connections to make the light functional. Wiring is not in scope. |
| RATINGS | Operating input voltage range (in Volts) | 100 to 280 |
| RATINGS | Luminaire System Wattge (in Watts) | 200 |
| RATINGS | Luminaire System Efficacy - Lumen output - (Lumen/watt) | ≥ 120 |
| RATINGS | Color Temperature (CCT) +/- 500 K (in Kelvin) | 6000 K |
| RATINGS | Colour Rendering Index (CRI) (in % age) | ≥ 70 |
| RATINGS | Power Factor (PF) | ≥ 0.95 at full load |
| RATINGS | Ingress Protection (IP) Rating of Luminaire (agreed to furnish test certificates to buyer / consignee on demand) | IP 65 |
| RATINGS | Impact resistance (If claimbed "Yes" - agreed to furnish test certificates to buyer / consignee on demand) | Yes. IK07 (as per IEC 62262:2002) |
| RATINGS | Minimum operating temperature range (in deg. C) | -10 to 0 |
| RATINGS | Maximum operating temperature range (in deg. C) | 60.0 - 60.0 Or higher |
| SAFETY | The luminaire shall be protected against surges and transients ( Internal) | ≥ 5 KV |
| SAFETY | The luminaire shall be protected against surges and transients (External) | ≥ 10 KV |
| SAFETY | Flame/Fire proof compliance (If claimbed - agreed to furnish test certificates to buyer / consignee on demand) | No |
| SAFETY | Other compliacne (If claimbed - agreed to furnish test certificates to buyer / consignee on demand) | EMC (as per IEC:61000-3-2:2014 latest) |
| CONSTRUCTION | Shape of Luminaire | Round |
| CONSTRUCTION | Type of mounting | Metallic adjustable Brackets with Eye Bolt |
| CONSTRUCTION | Installation height range from floor level (in m) - Must declare | 15 |
| CONSTRUCTION | Optic Lens | Yes. Polycarbonate-UV stabilised |
| CONSTRUCTION | Type of Control Gear | Constant Current |
| CONSTRUCTION | Number of electronic control gear on each luminaire (power supplies) - (in Nos.) | 2 |
| CONSTRUCTION | Luminaire fitted with connecting cables for input power | ISI Marked 3 Core cable for input power ( Length:500 mm ) |
| CONSTRUCTION | Accessories for each luminaire | SS Eye Bolts (as per IS:4190:1984 latest), Set of Bolt,Nut, Washers (SS), Die cast aluminium brackets |
| MARKING | Marking/Identification details on inside of each luminaire and outside of each packing box | Manufacturer's Name, Model Number, Serial Number, Month and year of manufacturing, Voltage, System Wattage |
| MARKING | Marking/Identification details on each control gear | Manufacturer's Name, Model Number |
| CERTIFICATIONS | Warranty period (in Months) | 60 Or higher |
| CERTIFICATIONS | Availability of test reports from Central Govt. Lab/NABL/ILAC accrediated laboratory to prove conformity of the specification | Yes |
| CERTIFICATIONS | Agreed to furnish LM 79 , LM 80 reports from Central Government lab/NABL/ILAC accrediated lab | Yes as per IS:16106:2012 latest and as per IS:16105:2012 latest |
| CERTIFICATIONS | Agreed to furnish TM 21 report from Central Government lab/NABL/ILAC accredited lab | Yes |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
12-Jun-2026, 2:00 pm
Opening Date
12-Jun-2026, 2:30 pm
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS