UPS 05 KVA,Battery Bank,Battery Rack,SPD at Input,SPD at Output,3 Core Power Cable 2.5 sq mm,3 Core
Airports Authority Of India ,rhq Nr - Rangpuri
Bid Publish Date
05-Jun-2026, 2:04 pm
Bid End Date
26-Jun-2026, 1:00 pm
EMD
₹7,71,940
Progress
Quantity
2298
Category
10 KVA Modular UPS N plus 1 at Dehradun
Bid Type
Two Packet Bid
A tender has been published for Airports Authority Of India, rhq Nr - Rangpuri 10 KVA Modular UPS N plus 1 at Azamgarh, Battery Bank, Battery Rack, SPD at Input, SPD at Output, 3 Core Power Cable 2. 5 sqmm, 3 Core Power Cable 6 sqmm, MCCB 4 Pole 100A, MCB 63A with D-boxes, CAT 6 Network copper cable, PVC Conduit, Installation Testing and Commissioning at Azamgarh, CAMC 1st Year, CAMC 2nd Year, CAMC 3rd Year, CAMC 4th Year, CAMC 5th Year, CAMC 6th Year, 10 KVA Modular UPS N plus 1 at Bikaner, Installation Testing and Commissioning at Bikaner, 10 KVA Modular UPS N plus 1 at Dehradun, Installation Testing and Commissioning at Dehradun, 10 KVA Modular UPS N plus 1 at Khajuraho, Installation Testing and Commissioning at Khajuraho, 10 KVA Modular UPS N plus 1 at Pantnagar, Installation Testing and Commissioning at Pantnagar, 10 KVA Modular UPS N plus 1 at Sirsa, Installation Testing and Commissioning at Sirsa, UPS 05 KVA at Chandigarh, SPD, MCCB 2 Pole 63A, MCB 32A with D boxes, Installation Testing and Commissioning at Chandigarh, UPS 05 KVA at Chitrakoot, Installation Testing and Commissioning at Chitrakoot, UPS 05 KVA at Kangra, Installation Testing and Commissioning at Kangra, UPS 05 KVA at Kishangarh, Installation Testing and Commissioning at Kishangarh, UPS 05 KVA at Lucknow, Installation Testing and Commissioning at Lucknow, UPS 05 KVA at Moradabad, Installation Testing and Commissioning at Moradabad. Quantity: 2298 by. Submission Deadline: 26-06-2026 13: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
10 KVA Modular UPS N plus 1 at Azamgarh , Battery Bank , Battery Rack , SPD at Input , SPD at Output , 3 Core Power Cable 2.5 sqmm , 3 Core Power Cable 6 sqmm , MCCB 4 Pole 100A , MCB 63A with D-boxes , CAT 6 Network copper cable , PVC Conduit , Installation Testing and Commissioning at Azamgarh , CAMC 1st Year , CAMC 2nd Year , CAMC 3rd Year , CAMC 4th Year , CAMC 5th Year , CAMC 6th Year , 10 KVA Modular UPS N plus 1 at Bikaner , Installation Testing and Commissioning at Bikaner , 10 KVA Modular UPS N plus 1 at Dehradun , Installation Testing and Commissioning at Dehradun , 10 KVA Modular UPS N plus 1 at Khajuraho , Installation Testing and Commissioning at Khajuraho , 10 KVA Modular UPS N plus 1 at Pantnagar , Installation Testing and Commissioning at Pantnagar , 10 KVA Modular UPS N plus 1 at Sirsa , Installation Testing and Commissioning at Sirsa , UPS 05 KVA at Chandigarh , SPD , MCCB 2 Pole 63A , MCB 32A with D boxes , Installation Testing and Commissioning at Chandigarh , UPS 05 KVA at Chitrakoot , Installation Testing and Commissioning at Chitrakoot , UPS 05 KVA at Kangra , Installation Testing and Commissioning at Kangra , UPS 05 KVA at Kishangarh , Installation Testing and Commissioning at Kishangarh , UPS 05 KVA at Lucknow , Installation Testing and Commissioning at Lucknow , UPS 05 KVA at Moradabad , Installation Testing and Commissioning at Moradabad
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Airports Authority Of India ,rhq Nr - Rangpuri
Airports Authority Of India
Indian Army
JAMMU, JAMMU & KASHMIR
Airports Authority Of India
JALGAON, MAHARASHTRA
Hindustan Petroleum Corporation Ltd
Tender Results
Loading results...
10 KVA Modular UPS N plus 1 at Azamgarh
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 10 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD at Input
SPD at Input of 10 KVA UPS
SPD at Output
SPD at Output of 10 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 4 Pole 100A
4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input
MCB 63A with D-boxes
MCB power distribution panel with 2 Pole MCB 63A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Azamgarh
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
CAMC 5th Year
CAMC cost of 5th year post warranty period
CAMC 6th Year
CAMC cost of 6th year post warranty period
10 KVA Modular UPS N plus 1 at Bikaner
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 10 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD at Input
SPD at Input of 10 KVA UPS
SPD at Output
SPD at Output of 10 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 4 Pole 100A
4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input
MCB 63A with D-boxes
MCB power distribution panel with 2 Pole MCB 63A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Bikaner
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
CAMC 5th Year
CAMC cost of 5th year post warranty period
CAMC 6th Year
CAMC cost of 6th year post warranty period
10 KVA Modular UPS N plus 1 at Dehradun
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 10 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD at Input
SPD at Input of 10 KVA UPS
SPD at Output
SPD at Output of 10 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 4 Pole 100A
4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input
MCB 63A with D-boxes
MCB power distribution panel with 2 Pole MCB 63A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Dehradun
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
CAMC 5th Year
CAMC cost of 5th year post warranty period
CAMC 6th Year
CAMC cost of 6th year post warranty period
10 KVA Modular UPS N plus 1 at Khajuraho
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 10 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD at Input
SPD at Input of 10 KVA UPS
SPD at Output
SPD at Output of 10 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 4 Pole 100A
4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input
MCB 63A with D-boxes
MCB power distribution panel with 2 Pole MCB 63A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Khajuraho
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
CAMC 5th Year
CAMC cost of 5th year post warranty period
CAMC 6th Year
CAMC cost of 6th year post warranty period
10 KVA Modular UPS N plus 1 at Pantnagar
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 10 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD at Input
SPD at Input of 10 KVA UPS
SPD at Output
SPD at Output of 10 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 4 Pole 100A
4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input
MCB 63A with D-boxes
MCB power distribution panel with 2 Pole MCB 63A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Pantnagar
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
CAMC 5th Year
CAMC cost of 5th year post warranty period
CAMC 6th Year
CAMC cost of 6th year post warranty period
10 KVA Modular UPS N plus 1 at Sirsa
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 10 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD at Input
SPD at Input of 10 KVA UPS
SPD at Output
SPD at Output of 10 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 4 Pole 100A
4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input
MCB 63A with D-boxes
MCB power distribution panel with 2 Pole MCB 63A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Sirsa
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
CAMC 5th Year
CAMC cost of 5th year post warranty period
CAMC 6th Year
CAMC cost of 6th year post warranty period
UPS 05 KVA at Chandigarh
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 5 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD
SPD at Input and Output of 5 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 2 Pole 63A
2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input
MCB 32A with D boxes
MCB power distribution panel with 2 Pole MCB 32A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Chandigarh
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
UPS 05 KVA at Chitrakoot
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 5 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD
SPD at Input and Output of 5 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 2 Pole 63A
2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input
MCB 32A with D boxes
MCB power distribution panel with 2 Pole MCB 32A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Chitrakoot
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
UPS 05 KVA at Kangra
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 5 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD
SPD at Input and Output of 5 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 2 Pole 63A
2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input
MCB 32A with D boxes
MCB power distribution panel with 2 Pole MCB 32A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Kangra
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
UPS 05 KVA at Kishangarh
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 5 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD
SPD at Input and Output of 5 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 2 Pole 63A
2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input
MCB 32A with D boxes
MCB power distribution panel with 2 Pole MCB 32A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Kishangarh
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
UPS 05 KVA at Lucknow
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 5 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD
SPD at Input and Output of 5 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 2 Pole 63A
2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input
MCB 32A with D boxes
MCB power distribution panel with 2 Pole MCB 32A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Lucknow
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
UPS 05 KVA at Moradabad
Single phase Input and Single phase Output
Battery Bank
Battery Bank for 5 KVA UPS with 30 mins Backup
Battery Rack
Battery Rack of Standard Quality with trolley and Top Cover
SPD
SPD at Input and Output of 5 KVA UPS
3 Core Power Cable 2.5 sqmm
3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard
3 Core Power Cable 6 sqmm
3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard
MCCB 2 Pole 63A
2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input
MCB 32A with D boxes
MCB power distribution panel with 2 Pole MCB 32A with DB boxes
CAT 6 Network copper cable
CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx
PVC Conduit
PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard
Installation Testing and Commissioning at Moradabad
Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories
CAMC 1st Year
CAMC cost of 1st year post warranty period
CAMC 2nd Year
CAMC cost of 2nd year post warranty period
CAMC 3rd Year
CAMC cost of 3rd year post warranty period
CAMC 4th Year
CAMC cost of 4th year post warranty period
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 10 KVA Modular UPS N plus 1 at Azamgarh | Single phase Input and Single phase Output | 1 | nos | [email protected] | 180 | |
| 2 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup | 1 | nos | [email protected] | 180 | |
| 3 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 1 | nos | [email protected] | 180 | |
| 4 | SPD at Input | SPD at Input of 10 KVA UPS | 1 | nos | [email protected] | 180 | |
| 5 | SPD at Output | SPD at Output of 10 KVA UPS | 1 | nos | [email protected] | 180 | |
| 6 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 7 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 8 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input | 1 | nos | [email protected] | 180 | |
| 9 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes | 1 | nos | [email protected] | 180 | |
| 10 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | [email protected] | 180 | |
| 11 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 12 | Installation Testing and Commissioning at Azamgarh | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | [email protected] | 180 | |
| 13 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | [email protected] | 365 | |
| 14 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | [email protected] | 365 | |
| 15 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | [email protected] | 365 | |
| 16 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | [email protected] | 365 | |
| 17 | CAMC 5th Year | CAMC cost of 5th year post warranty period | 1 | work | [email protected] | 365 | |
| 18 | CAMC 6th Year | CAMC cost of 6th year post warranty period | 1 | work | [email protected] | 365 | |
| 19 | 10 KVA Modular UPS N plus 1 at Bikaner | Single phase Input and Single phase Output | 2 | nos | [email protected] | 180 | |
| 20 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup | 2 | nos | [email protected] | 180 | |
| 21 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 2 | nos | [email protected] | 180 | |
| 22 | SPD at Input | SPD at Input of 10 KVA UPS | 2 | nos | [email protected] | 180 | |
| 23 | SPD at Output | SPD at Output of 10 KVA UPS | 2 | nos | [email protected] | 180 | |
| 24 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 50 | mtr | [email protected] | 180 | |
| 25 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 50 | mtr | [email protected] | 180 | |
| 26 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input | 2 | nos | [email protected] | 180 | |
| 27 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes | 2 | nos | [email protected] | 180 | |
| 28 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | [email protected] | 180 | |
| 29 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 50 | mtr | [email protected] | 180 | |
| 30 | Installation Testing and Commissioning at Bikaner | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | [email protected] | 180 | |
| 31 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | [email protected] | 365 | |
| 32 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | [email protected] | 365 | |
| 33 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | [email protected] | 365 | |
| 34 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | [email protected] | 365 | |
| 35 | CAMC 5th Year | CAMC cost of 5th year post warranty period | 1 | work | [email protected] | 365 | |
| 36 | CAMC 6th Year | CAMC cost of 6th year post warranty period | 1 | work | [email protected] | 365 | |
| 37 | 10 KVA Modular UPS N plus 1 at Dehradun | Single phase Input and Single phase Output | 4 | nos | [email protected] | 180 | |
| 38 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup | 4 | nos | [email protected] | 180 | |
| 39 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 4 | nos | [email protected] | 180 | |
| 40 | SPD at Input | SPD at Input of 10 KVA UPS | 4 | nos | [email protected] | 180 | |
| 41 | SPD at Output | SPD at Output of 10 KVA UPS | 4 | nos | [email protected] | 180 | |
| 42 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 100 | mtr | [email protected] | 180 | |
| 43 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 100 | mtr | [email protected] | 180 | |
| 44 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input | 4 | nos | [email protected] | 180 | |
| 45 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes | 4 | nos | [email protected] | 180 | |
| 46 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | [email protected] | 180 | |
| 47 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 100 | mtr | [email protected] | 180 | |
| 48 | Installation Testing and Commissioning at Dehradun | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | [email protected] | 180 | |
| 49 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | [email protected] | 365 | |
| 50 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | [email protected] | 365 | |
| 51 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | [email protected] | 365 | |
| 52 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | [email protected] | 365 | |
| 53 | CAMC 5th Year | CAMC cost of 5th year post warranty period | 1 | work | [email protected] | 365 | |
| 54 | CAMC 6th Year | CAMC cost of 6th year post warranty period | 1 | work | [email protected] | 365 | |
| 55 | 10 KVA Modular UPS N plus 1 at Khajuraho | Single phase Input and Single phase Output | 2 | nos | [email protected] | 180 | |
| 56 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup | 2 | nos | [email protected] | 180 | |
| 57 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 2 | nos | [email protected] | 180 | |
| 58 | SPD at Input | SPD at Input of 10 KVA UPS | 2 | nos | [email protected] | 180 | |
| 59 | SPD at Output | SPD at Output of 10 KVA UPS | 2 | nos | [email protected] | 180 | |
| 60 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 50 | mtr | [email protected] | 180 | |
| 61 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 50 | mtr | [email protected] | 180 | |
| 62 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input | 2 | nos | [email protected] | 180 | |
| 63 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes | 2 | nos | [email protected] | 180 | |
| 64 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | [email protected] | 180 | |
| 65 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 50 | mtr | [email protected] | 180 | |
| 66 | Installation Testing and Commissioning at Khajuraho | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | [email protected] | 180 | |
| 67 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | [email protected] | 365 | |
| 68 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | [email protected] | 365 | |
| 69 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | [email protected] | 365 | |
| 70 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | [email protected] | 365 | |
| 71 | CAMC 5th Year | CAMC cost of 5th year post warranty period | 1 | work | [email protected] | 365 | |
| 72 | CAMC 6th Year | CAMC cost of 6th year post warranty period | 1 | work | [email protected] | 365 | |
| 73 | 10 KVA Modular UPS N plus 1 at Pantnagar | Single phase Input and Single phase Output | 1 | nos | [email protected] | 180 | |
| 74 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup | 1 | nos | [email protected] | 180 | |
| 75 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 1 | nos | [email protected] | 180 | |
| 76 | SPD at Input | SPD at Input of 10 KVA UPS | 1 | nos | [email protected] | 180 | |
| 77 | SPD at Output | SPD at Output of 10 KVA UPS | 1 | nos | [email protected] | 180 | |
| 78 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 79 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 80 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input | 1 | nos | [email protected] | 180 | |
| 81 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes | 1 | nos | [email protected] | 180 | |
| 82 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | [email protected] | 180 | |
| 83 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 84 | Installation Testing and Commissioning at Pantnagar | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | [email protected] | 180 | |
| 85 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | [email protected] | 365 | |
| 86 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | [email protected] | 365 | |
| 87 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | [email protected] | 365 | |
| 88 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | [email protected] | 365 | |
| 89 | CAMC 5th Year | CAMC cost of 5th year post warranty period | 1 | work | [email protected] | 365 | |
| 90 | CAMC 6th Year | CAMC cost of 6th year post warranty period | 1 | work | [email protected] | 365 | |
| 91 | 10 KVA Modular UPS N plus 1 at Sirsa | Single phase Input and Single phase Output | 1 | nos | manager_cns_sirsa | 180 | |
| 92 | Battery Bank | Battery Bank for 10 KVA UPS with 30 mins Backup | 1 | nos | manager_cns_sirsa | 180 | |
| 93 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 1 | nos | manager_cns_sirsa | 180 | |
| 94 | SPD at Input | SPD at Input of 10 KVA UPS | 1 | nos | manager_cns_sirsa | 180 | |
| 95 | SPD at Output | SPD at Output of 10 KVA UPS | 1 | nos | manager_cns_sirsa | 180 | |
| 96 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 25 | mtr | manager_cns_sirsa | 180 | |
| 97 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 25 | mtr | manager_cns_sirsa | 180 | |
| 98 | MCCB 4 Pole 100A | 4 Pole MCCB rating 100A with individual DB boxes for 10 KVA UPS input | 1 | nos | manager_cns_sirsa | 180 | |
| 99 | MCB 63A with D-boxes | MCB power distribution panel with 2 Pole MCB 63A with DB boxes | 1 | nos | manager_cns_sirsa | 180 | |
| 100 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | manager_cns_sirsa | 180 | |
| 101 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 25 | mtr | manager_cns_sirsa | 180 | |
| 102 | Installation Testing and Commissioning at Sirsa | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | manager_cns_sirsa | 180 | |
| 103 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | manager_cns_sirsa | 365 | |
| 104 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | manager_cns_sirsa | 365 | |
| 105 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | manager_cns_sirsa | 365 | |
| 106 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | manager_cns_sirsa | 365 | |
| 107 | CAMC 5th Year | CAMC cost of 5th year post warranty period | 1 | work | manager_cns_sirsa | 365 | |
| 108 | CAMC 6th Year | CAMC cost of 6th year post warranty period | 1 | work | manager_cns_sirsa | 365 | |
| 109 | UPS 05 KVA at Chandigarh | Single phase Input and Single phase Output | 1 | nos | [email protected] | 180 | |
| 110 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup | 1 | nos | [email protected] | 180 | |
| 111 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 1 | nos | [email protected] | 180 | |
| 112 | SPD | SPD at Input and Output of 5 KVA UPS | 2 | nos | [email protected] | 180 | |
| 113 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 114 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 115 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input | 1 | nos | [email protected] | 180 | |
| 116 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes | 1 | nos | [email protected] | 180 | |
| 117 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | [email protected] | 180 | |
| 118 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 119 | Installation Testing and Commissioning at Chandigarh | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | [email protected] | 180 | |
| 120 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | [email protected] | 365 | |
| 121 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | [email protected] | 365 | |
| 122 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | [email protected] | 365 | |
| 123 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | [email protected] | 365 | |
| 124 | UPS 05 KVA at Chitrakoot | Single phase Input and Single phase Output | 4 | nos | eng_civil_chitrakoot | 180 | |
| 125 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup | 4 | nos | eng_civil_chitrakoot | 180 | |
| 126 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 4 | nos | eng_civil_chitrakoot | 180 | |
| 127 | SPD | SPD at Input and Output of 5 KVA UPS | 8 | nos | eng_civil_chitrakoot | 180 | |
| 128 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 100 | mtr | eng_civil_chitrakoot | 180 | |
| 129 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 100 | mtr | eng_civil_chitrakoot | 180 | |
| 130 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input | 4 | nos | eng_civil_chitrakoot | 180 | |
| 131 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes | 4 | nos | eng_civil_chitrakoot | 180 | |
| 132 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | eng_civil_chitrakoot | 180 | |
| 133 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 100 | mtr | eng_civil_chitrakoot | 180 | |
| 134 | Installation Testing and Commissioning at Chitrakoot | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | eng_civil_chitrakoot | 180 | |
| 135 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | eng_civil_chitrakoot | 365 | |
| 136 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | eng_civil_chitrakoot | 365 | |
| 137 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | eng_civil_chitrakoot | 365 | |
| 138 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | eng_civil_chitrakoot | 365 | |
| 139 | UPS 05 KVA at Kangra | Single phase Input and Single phase Output | 1 | nos | [email protected] | 180 | |
| 140 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup | 1 | nos | [email protected] | 180 | |
| 141 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 1 | nos | [email protected] | 180 | |
| 142 | SPD | SPD at Input and Output of 5 KVA UPS | 2 | nos | [email protected] | 180 | |
| 143 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 144 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 145 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input | 1 | nos | [email protected] | 180 | |
| 146 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes | 1 | nos | [email protected] | 180 | |
| 147 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | [email protected] | 180 | |
| 148 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 25 | mtr | [email protected] | 180 | |
| 149 | Installation Testing and Commissioning at Kangra | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | [email protected] | 180 | |
| 150 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | [email protected] | 365 | |
| 151 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | [email protected] | 365 | |
| 152 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | [email protected] | 365 | |
| 153 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | [email protected] | 365 | |
| 154 | UPS 05 KVA at Kishangarh | Single phase Input and Single phase Output | 4 | nos | [email protected] | 180 | |
| 155 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup | 4 | nos | [email protected] | 180 | |
| 156 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 4 | nos | [email protected] | 180 | |
| 157 | SPD | SPD at Input and Output of 5 KVA UPS | 8 | nos | [email protected] | 180 | |
| 158 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 100 | mtr | [email protected] | 180 | |
| 159 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 100 | mtr | [email protected] | 180 | |
| 160 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input | 4 | nos | [email protected] | 180 | |
| 161 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes | 4 | nos | [email protected] | 180 | |
| 162 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | [email protected] | 180 | |
| 163 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 100 | mtr | [email protected] | 180 | |
| 164 | Installation Testing and Commissioning at Kishangarh | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | [email protected] | 180 | |
| 165 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | [email protected] | 365 | |
| 166 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | [email protected] | 365 | |
| 167 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | [email protected] | 365 | |
| 168 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | [email protected] | 365 | |
| 169 | UPS 05 KVA at Lucknow | Single phase Input and Single phase Output | 4 | nos | [email protected] | 180 | |
| 170 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup | 4 | nos | [email protected] | 180 | |
| 171 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 4 | nos | [email protected] | 180 | |
| 172 | SPD | SPD at Input and Output of 5 KVA UPS | 8 | nos | [email protected] | 180 | |
| 173 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 100 | mtr | [email protected] | 180 | |
| 174 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 100 | mtr | [email protected] | 180 | |
| 175 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input | 4 | nos | [email protected] | 180 | |
| 176 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes | 4 | nos | [email protected] | 180 | |
| 177 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | [email protected] | 180 | |
| 178 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 100 | mtr | [email protected] | 180 | |
| 179 | Installation Testing and Commissioning at Lucknow | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | [email protected] | 180 | |
| 180 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | [email protected] | 365 | |
| 181 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | [email protected] | 365 | |
| 182 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | [email protected] | 365 | |
| 183 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | [email protected] | 365 | |
| 184 | UPS 05 KVA at Moradabad | Single phase Input and Single phase Output | 2 | nos | engg_ee_moradabad | 180 | |
| 185 | Battery Bank | Battery Bank for 5 KVA UPS with 30 mins Backup | 2 | nos | engg_ee_moradabad | 180 | |
| 186 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover | 2 | nos | engg_ee_moradabad | 180 | |
| 187 | SPD | SPD at Input and Output of 5 KVA UPS | 4 | nos | engg_ee_moradabad | 180 | |
| 188 | 3 Core Power Cable 2.5 sqmm | 3 Core Power Cable Copper with each core of 2.5 sq mm of good quality as per ISI standard | 50 | mtr | engg_ee_moradabad | 180 | |
| 189 | 3 Core Power Cable 6 sqmm | 3 Core Power Cable Copper with each core of 6 sq mm of good quality as per ISI standard | 50 | mtr | engg_ee_moradabad | 180 | |
| 190 | MCCB 2 Pole 63A | 2 Pole MCCB rating 63A with individual DB boxes for 05 KVA UPS input | 2 | nos | engg_ee_moradabad | 180 | |
| 191 | MCB 32A with D boxes | MCB power distribution panel with 2 Pole MCB 32A with DB boxes | 2 | nos | engg_ee_moradabad | 180 | |
| 192 | CAT 6 Network copper cable | CAT 6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS 1 Bundle of 305 Mtr approx | 1 | bundle | engg_ee_moradabad | 180 | |
| 193 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer of good quality as per ISI standard | 50 | mtr | engg_ee_moradabad | 180 | |
| 194 | Installation Testing and Commissioning at Moradabad | Including Complete Wiring i.e. wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories | 1 | work | engg_ee_moradabad | 180 | |
| 195 | CAMC 1st Year | CAMC cost of 1st year post warranty period | 1 | work | engg_ee_moradabad | 365 | |
| 196 | CAMC 2nd Year | CAMC cost of 2nd year post warranty period | 1 | work | engg_ee_moradabad | 365 | |
| 197 | CAMC 3rd Year | CAMC cost of 3rd year post warranty period | 1 | work | engg_ee_moradabad | 365 | |
| 198 | CAMC 4th Year | CAMC cost of 4th year post warranty period | 1 | work | engg_ee_moradabad | 365 |
Discover companies most likely to bid on this tender
Gail Mangalore Petrochemicals Limited
📍 DAKSHINA KANNADA, KARNATAKA
Iocl- Erpl
📍 BONGAIGAON, ASSAM
Border Security Force (bsf)
📍 DHUBRI, ASSAM
Indian Army
📍 KAMRUP, ASSAM
Indian Air Force
📍 SONITPUR, ASSAM
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS