Progress
Southern Railway invites bids for Residual Current Operated Circuit Breakers (RCCB) without Integral Overcurrent Protection ISI Marked To IS 12640 (Part 1) for deployment in Kozhikode, Kerala. Estimated value is ₹722,000 with no explicit EMD disclosed. The tender emphasizes OEM authorization, ISI certification, and pre-dispatch inspection requirements via RITES. Quantity flexibility under clause allows up to ±25% variation during contract execution, with delivery timelines linked to original order dates and potential extended periods. Unique emphasis on pre-inspection and past performance documentation differentiates responsive bidders.
RCCB type: without integral overcurrent protection
Standards: IS 12640 (Part 1); ISI marked
Rated Voltage: as per project requirement
Number of Poles: as specified in BOQ/technical schedule
Rated Current: as specified in technical schedule
Rated Residual Operating Current: as specified
Rated Residual Making and Breaking Capacity: as specified
Rated Conditional Short Circuit Current and Rated Conditional Residual Short Circuit Current: as specified
Brand/OEM: OEM authorization required; manufacturer proof essential
Testing/Quality: pre-dispatch testing by RITES; supplier bears inspection cost
Warranty/Support: terms to be defined in bid; refer to bid documents
Delivery: quantity variation up to ±25%; delivery period from last date of original delivery order
Option clause allows ±25% quantity variation during contract execution with corresponding delivery timing
OEM authorization and ISI certification required; pre-dispatch inspection by RITES at supplier cost
Past performance credentials for similar Railway/PSU/State contracts considered in evaluation
Delivery schedule linked to original order dates; extended period calculations with minimum 30 days
Not specified in available data; verify in bid documents and supplier negotiations
Delivery starts from the last date of original delivery order; option clause allows additional quantity delivery time with minimum 30 days, calculated as (additional/ original) × original delivery period
Not specified; refer to detailed tender terms and contract conditions for LD clauses
OEM authorization from RCCB manufacturer
Compliance with IS 12640 (Part 1) and ISI marking
Experience or past performance in Railway/PSU/State Government supply contracts
Quantity
190
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
50 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Residual Current Operated Circuit Breakers (RCCB) without Integral Overcurrent Protection ISI Marked To IS 12640 (Part 1) (Q2)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Kozhikode
Delivery Pincodes
673001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sijed Bhaskaran | 673001,Office of the Senior Section Engineer / Electrical Near Kozhikode Juntion railway station, Southern Railway, Kozhikode - 673001 | Kozhikode | Kerala | 673001 | 190 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
OEM Authorization Certificate (from the product manufacturer)
Udyam Registration certificate OR NSIC/Factory License copy OR BIS license copy OR Trademark proof
Past performance certificates, contracts/PO copies for similar items
CRAC/Receipt notes or RITES inspection certificates / completion certificates
Evidence of compliance with IS 12640 (Part 1) and ISI marking
Technical bid documents and compliance for each parameter
Inspection/Pre-dispatch testing documents by RITES Ltd
Any applicable GST registration details and PAN
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | RCCB Type | Type AC |
| GENERIC | Rated Voltage | 415 |
| GENERIC | Number of Poles | 4 |
| GENERIC | Rated Current (in Ampere) | 63 |
| GENERIC | Rated Residual Operating Current (in Ampere) | 0.006, 0.01, 0.03, 0.1, 0.3, 0.5 |
| GENERIC | Rated Residual Making and Breaking Capacity | 500 A, 630 A, 800 A, 1000 A |
| GENERIC | Rated Conditional Short Circuit Current and Rated Conditional Residual Short Circuit Current | 6000, 10000, 6000 kA, 10000 kA |
Key insights about KERALA tender market
Bidders must submit OEM authorization, ISI/IS 12640 Part 1 compliance, and pre-dispatch testing documents. Provide past performance certificates, CRAC/inspection notes, and evidence of meeting all electrical rating specifications. Ensure bid pricing includes inspection costs by RITES and complies with the 25% quantity variation clause.
Required documents include OEM authorization, Udyam/NSIC/Factory License/BIS proof, trademark evidence, past performance contracts, CRAC/receipt notes, RITES inspection certificates, ISI marking proof, and technical bid compliance for each parameter. GST PAN details and financial statements may be requested.
RCCBs must be ISI marked and conform to IS 12640 (Part 1). Compliance evidence must be provided via OEM authorization and standard-specific certificates. Pre-dispatch testing by RITES is mandatory, with inspection costs borne by the bidder.
The purchaser may adjust quantity by ±25% and extend delivery time using the option clause. Extended time is calculated as (increased quantity/ original quantity) × original delivery period, with a minimum of 30 days unless the original period exceeds 30 days.
Evaluation favors bidders with Railway/PSU/State Government contract experience. Attach contracts, purchase orders, completion certificates, and RITES/inspection documents to prove execution of similar RCCB supply projects.
Inspection charges are borne by the supplier and not reimbursed by the indenter. Costs must be included in the bid price; RITES will conduct pre-dispatch inspection and issue a compliance certificate.
Submit OEM Authorization Certificate plus proof like Udyam NSIC Factory License or BIS license or Trademark registrations to confirm manufacturer status of the RCCB product.