Organization: Indian Oil Corporation Limited – IOCL Panipat Refinery. Product/category: Rim Seal Fire Protection System with Scope including Supply, Installation, Testing and Commissioning (SITC). Location: Panipat, Haryana. Delivery/quantity flexibility: option to increase/decrease quantity up to 25%; delivery period computed from the original delivery date, with minimum extension of 30 days. Payment terms: 90% within 10 days of consignee receipt-cum-acceptance certificate; remaining 10% after commissioning with as-built docs, onsite training. Unique aspect: ATC emphasizes SITC scope and flexible quantities within contract terms, aligning with complex fire protection installs at a refinery site.
Option to modify quantity by ±25% during contract at contracted rates
SITC scope with payments split 90%/10% after acceptance and commissioning
Delivery period adjustments follow original delivery term with a minimum 30-day extension
For Supply: 90% payment within ten days of consignee receipt-cum-acceptance certificate and bill submission; remaining 10% after commissioning with as-built drawings and onsite training.
Delivery period commences from the last date of the original delivery order; option-based extension uses (increase/original quantity) × original delivery period, minimum 30 days.
Not specified in the provided ATC; bidders should verify penalties in final contract.
Experience in SITC of fire protection systems in refinery environments
Financial capability to handle contracts with 90%/10% payment milestones
Ability to supply or install Rim Seal Fire Protection System per refinery standards
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Rim Seal Fire Protection System
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
38
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Panipat
Delivery Pincodes
132140
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Vinod Kumar Malik | 132140,INDIANOIL CORPORATION LTD. PANIPAT REFINERY , PO. BOHALI , PANIPAT | Panipat | Haryana | 132140 | 2 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar Rim Seal Fire Protection System SITC projects
Financial statements (last 2-3 years)
EMD/Security deposit information (as applicable per tender terms)
Technical bid documents demonstrating SITC capability
OEM authorization letters (if bidding as an authorized distributor/installer)
As-built drawings and installation manuals (post-commission)
Key insights about HARYANA tender market
Bidders should submit GST, PAN, experience certificates for similar SITC projects, financial statements, and EMD as applicable. Provide technical bid with capability to Supply, Install, Test and Commission, plus OEM authorizations if required. Payment terms specify 90% within 10 days post-acceptance and 10% after commissioning.
Required documents include GST certificate, PAN, two to three years of financial statements, experience certificates for relevant SITC projects, OEM authorizations, and technical bid detailing SITC capabilities. Also prepare as-built documentation templates and training plan for site personnel.
Payment terms specify 90% within ten days of consignee receipt-cum-acceptance certificate and bill submission; remaining 10% after commissioning with submission of as-built drawings, documentation in hard and soft form, and onsite training.
Delivery period follows the original delivery date; the option clause allows ±25% quantity change with delivery extension calculated as (increased quantity/original quantity) × original period, with a minimum extension of 30 days.
Scope includes Supply, Installation, Testing and Commissioning (SITC) of Rim Seal Fire Protection System; associated documentation and SAT are required post-commissioning.
Eligible bidders should demonstrate refinery SITC experience, financial stability, ability to provide OEM authorizations if applicable, and compliance with the contract’s acceptance and training requirements.
Provide technical bid with system drawings, installation manuals, and as-built documentation; include OEM certifications if required, and evidence of prior Rim Seal Fire Protection installations in similar facilities.
The tender data does not specify exact start/end dates; bidders should monitor the portal for bid release, with SITC completion contingent on consignee acceptance and SAT as per ATC terms.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS