Progress
The State Institute Of Rural Development (SIRD), Jharkhand, located in RANCHI, JHARKHAND 829205, invites a tender for Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2). The BOQ contains 0 items, indicating no predefined quantity in the tender data. A key provision allows the Purchaser to vary quantity by up to 25% of the bid quantity and during the contract term at contracted rates. The delivery timeline will adjust from the original delivery date with a minimum extension of 30 days, depending on the quantity variation. This tender emphasizes ATC terms and reserve power to modify orders within the stated band.
Product/service names: Split Air Conditioner including Green AC, Wall Mount Type (V2) (Q2)
Quantities: Not specified in BOQ; 25% tender quantity variation allowed
Estimated value: Not provided in data
Experience: Not specified in data; verify ATC
Quality/Compliance: ATC terms will govern compliance; no explicit standards listed
Key Term 1: Quantity variation up to 25% at contracted rates
Key Term 2: Delivery period adjustments with minimum 30 days extension
Key Term 3: Compliance with Buyer Added ATC and attached ATC document
Not specified in the provided data; verify with ATC for percentages and schedule
Delivery period starts from the last date of original delivery order; extended time based on increased quantity
Not disclosed in the data; refer to ATC terms and contract for LD rates
Eligibility per ATC and organization-specific terms
Experience in supplying or installing split AC systems
Valid GST registration and financial documentation as required
Quantity
19
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
4
OEM Avg. Turnover
36
Past Performance
10 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar AC supply/installation
Financial statements (latest) and bidFinancials
EMD submission proof (if required by ATC)
Technical bid/documentation demonstrating compliance with ATC
OEM authorizations or dealership certificates (if required by ATC)
Key insights about JHARKHAND tender market
Submit all mandatory documents per ATC: GST, PAN, experience certificates, and financials, along with OEM authorizations if required. Ensure compliance with the 25% quantity variation clause and prepare delivery plans aligned to the extension formula. The ATC governs submission format and delivery schedule.
Required documents typically include GST certificate, PAN card, recent financial statements, experience certificates for similar AC projects, and OEM authorization. Depending on ATC, you may also need technical compliance documents and bid security/EMD proof if mandated.
Delivery starts from the last date of the original delivery order. If quantity increases, the extension is calculated as (increased quantity/original quantity) × original period, with a minimum extension of 30 days. The purchaser may extend to the original delivery period.
No explicit standards are listed in the data. The ATC document will specify compliance requirements. Bidders should reference IS/IEC norms and OEM specifications if indicated by ATC once accessed.
The EMD amount is not specified in the provided data. Verify the ATC attachment for exact EMD details, eligibility-related deposits, and acceptable payment methods or bank guarantees.
Confirm eligibility by checking ATC terms and seller prerequisites: valid GST, PAN, evidence of prior AC supply/install work, and financial health documents. Ensure OEM authorization if required and readiness to meet the 25% quantity variation clause.
The BOQ shows zero items (0). This indicates no predefined quantity; bidders must anticipate potential variations under the 25% option clause and be prepared with scalable installation capacity and stock, subject to ATC-driven orders.
Payment terms are not detailed in the available data. Refer to the ATC for milestone-based payment triggers and timelines post-delivery. Ensure documentation aligns with delivery acceptance testing and warranty if applicable.