TenderDekho Logo
Open EPROCURE-BIHAR

Open Tender for Price BOQ in BIHAR

Bid Publish Date

22-May-2026, 8:01 am

Bid End Date

15-Jun-2026, 10:30 am

EMD

₹31,80,000

Value

₹3,18,14,828

Location

Progress

Issue22-May-2026, 8:01 am
AwardPending
Explore all 3 tabs to view complete tender details

Tender Type

Open

Tender Fee

₹11,800

Tender Fee Exemption

No

EMD Exemption

No

Category

ELECTRICAL

Categories 1

The issuing authority announces a tender for Construction of 01no 33 kV Feeder bay at Each GSS Namely, 132/33 kV GSS Gangwara, 220/132/33KV GSS Thakurganj and 132/33KV GSS Bikramganj. in BIHAR. Submission Deadline: 15-06-2026 10: 30: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Processing Fee

₹5,900

Tender Currency

INR

Bid Currency

INR

Ranking Sequence

L1 Ranking

Estimated Value Visibility

Y

Bid To RA

No

Authority & Contact

Organization Hierarchy

Government of Bihar->Bihar State Power Transmission Company Limited->BSPTCL->Headquarter->Operation Maintenance

Approving Authority

Chief Engineer OM BSPTCL (CE)

Tender Creator

Mr Sushank Saurobh (EXECUTIVE ENGINEER)

Pre-Bid & Qualification

Pre-Bid Meeting Start

01-06-2026 05:30:00

Pre-Bid Meeting End

01-06-2026 07:30:00

Pre-Bid Discussion Type

OFFLINE

Pre-Bid Venue

Office of C.E (OM), 4th floor, Vidyut bhawan-II, Bailey Road, Patna

Payment Breakdown

TypeAmountCurrencyModeExemption
EMD₹31,80,000INRInternet Payment Gateway(IPG),Challan|Bank GuaranteeNo
Tender Fee₹11,800INRInternet Payment Gateway(IPG),Challan|No
Tender Processing Fee₹5,900INRInternet Payment Gateway(IPG),Challan|No

Document Requirements

COPY OF ELECTRICAL CONTRACTOR?S LICENCE.

BidPart1OthersMandatoryNo Exemption

AUTHORITY OF SEEK REFERENCES FROM THE TENDERER?S BANKERS.

BidPart1FinancialMandatoryNo Exemption

FOR LETTER OF UNDERTAKINGS - PXV

BidPart1OthersMandatoryNo Exemption

BALANCE SHEET FOR LAST 5 YEARS i.e, PROFIT & LOSS STATEMENT. (FURNISH MAAT VALUE)

BidPart1FinancialMandatoryNo Exemption

POWER OF ATTORNEY IN RESPECT OF TENDERERS SIGNATURE - PXVIII

BidPart1FinancialMandatoryNo Exemption

ATTORNEY IN RESPECT OF JOINT VENTURES-PXIX

BidPart1FinancialMandatoryNo Exemption

FOR QUALIFICATION REQUIREMENT - PXX

BidPart1ExperiencesMandatoryNo Exemption

FOR TENDER TECHNICAL BID - PXXI

BidPart1ExperiencesMandatoryNo Exemption

FOR TENDER PRICE BID - PXXII

BidPart1FinancialMandatoryNo Exemption

DETAILS OF LIQUID ASSETS.

BidPart1FinancialMandatoryNo Exemption

FOR EVIDENCE OF ACCESS TO OR AVAILABILITY OF CREDIT FACILITIES - PXXIV

BidPart1FinancialMandatoryNo Exemption

WORK COMPLETION SCHEDULE FOR WORK -PXXVII

BidPart1OthersMandatoryNo Exemption

AFFIADEVIT CONFORMING THE ALL DETAILS & DOCUMENTS FURNISHED ARE CORRECT & TRUE COPIES OF ORIGINALS

BidPart1OthersMandatoryNo Exemption

Original doc. copies constituational/ legal status, place of reg.& principal place of business,POA

BidPart1OthersMandatoryNo Exemption

Total annual turnover in work of a similar nature in his own name in each of the last 5 year

BidPart1FinancialMandatoryNo Exemption

Exp in executing similar projects for each of the last 5years. Perform. certificate furnished

BidPart1ExperiencesMandatoryNo Exemption

Qualifications and exp of key site management and technical person proposed for the contract.

BidPart1ExperiencesMandatoryNo Exemption

certificate from a bank or reputable firm of accountants conforming the liquidity

BidPart1FinancialMandatoryNo Exemption

Solvency Certificate to be furnished.

BidPart1FinancialMandatoryNo Exemption

Evidence of adequacy of working capital for this contract i.e.evidence of access of line (s) of cre

BidPart1OthersMandatoryNo Exemption

Authority to seek references from the tenderers bankers.

BidPart1FinancialMandatoryNo Exemption

Statement of safety policy and safety statistics for the last 5 years.

BidPart1OthersMandatoryNo Exemption

Copy of QA Certification and associated documentation.

BidPart1ExperiencesMandatoryNo Exemption

Dully filled TECHNICALSHEET

BidPart1OthersMandatoryNo Exemption

Dully filled TECHNOCOMMERCIALSHEET

BidPart1OthersMandatoryNo Exemption

Any other documents as per NIT

BidPart1OthersMandatoryNo Exemption

General Particulars

1

Name and designation of the officer of the Bidder to whom all reference shall be made for expeditious technical co-ordinationn.

2

Place of manufacture: (Item wise)

3

Services or facilities available

4

Availability of spare parts

Tender Terms

Section 1

Details

Whether terms of taking over, guarantee, Insurance are acceptable or not

Whether terms of taking over, guarantee, Insurance are acceptable or not

Section 2

Details

Whether the delivery & execution schedule indicated in the specification acceptable

Whether the delivery & execution schedule indicated in the specification acceptable

Section 3

Details

Whether liquidated damage for delay in delivery and Execution as indicated in the specification is acceptable

Whether liquidated damage for delay in delivery and Execution as indicated in the specification is acceptable

Section 4

Details

Whether latest copy of income tax clearance certificate and sales tax certificate enclosed with the bid or not.

Whether latest copy of income tax clearance certificate and sales tax certificate enclosed with the bid or not.

Section 5

Details

Whether terms of payment indicated in the specification acceptable.

Whether terms of payment indicated in the specification acceptable.

Section 6

Details

Whether terms as stipulated under security deposit /CONTRACT PERFORMANCE GUARANTEEE is acceptable.

Whether terms as stipulated under security deposit /CONTRACT PERFORMANCE GUARANTEEE is acceptable.

Section 7

Details

Whether bank guarantees as stipulated under advance payment, Security deposit and performance guarantee clause of the Specification will be submitted

Whether bank guarantees as stipulated under advance payment, Security deposit and performance guarantee clause of the Specification will be submitted

Section 8

Details

Whether agreeable to enter into a contract (As per the Performa enclosed) in the event of an order.

Whether agreeable to enter into a contract (As per the Performa enclosed) in the event of an order.

Section 9

Details

Are the prices quoted in price bid FIRM(only firm prices are acceptable)

Are the prices quoted in price bid FIRM(only firm prices are acceptable)

Section 10

Details

Whether unit FOR destination prices have been quoted in the price bid.

Whether unit FOR destination prices have been quoted in the price bid.

Section 11

Details

Whether prices quoted are also applicable On reduced quantity or not? Rebate, on any account, if any may be mentioned.

Whether prices quoted are also applicable On reduced quantity or not? Rebate, on any account, if any may be mentioned.

Section 12

Details

Whether a statement showing deviations for General conditions enclosed.

Whether a statement showing deviations for General conditions enclosed.

Section 13

Details

Whether a statement showing deviations from Technical specification enclosed.

Whether a statement showing deviations from Technical specification enclosed.

Section 14

Details

Whether the bidder is agreeable to execute the Contract in case deviation stipulated by him are not acceptable to BSPTCL

Whether the bidder is agreeable to execute the Contract in case deviation stipulated by him are not acceptable to BSPTCL

Section 15

Details

Whether excise duty is leviable? (for the items to be supplied by the contractor directly to the BSPTCL.). If included, Indicate actual amount

Whether excise duty is leviable? (for the items to be supplied by the contractor directly to the BSPTCL.). If included, Indicate actual amount

Section 16

Details

Whether sales tax is chargeable? (for the items to be supplied by the contractor directly to the BSPTCL.). If included, Indicate actual amount(item wise)

Whether sales tax is chargeable? (for the items to be supplied by the contractor directly to the BSPTCL.). If included, Indicate actual amount(item wise)

Section 17

Details

Whether certificate of past performance enclosed or not

Whether certificate of past performance enclosed or not

Section 18

Details

Whether unit FOR destination price (landed) of all individual items quoted in the price bid or not?

Whether unit FOR destination price (landed) of all individual items quoted in the price bid or not?

Section 19

Details

Whether all commercial terms are accepted or not

Whether all commercial terms are accepted or not

Section 20

Details

Whether all technical specifications accepted or not

Whether all technical specifications accepted or not

Section 21

Details

Whether prices are quoted for all works including Design, Engineering, drawing, supply of materials / Equipments, erection and commissioning of complete Subs...

Whether prices are quoted for all works including Design, Engineering, drawing, supply of materials / Equipments, erection and commissioning of complete Substation and .s (all works involved.)

Section 22

Details

Power of Attorney authorizing the signatories of the tenderer to fill up & sign the tender is furnished in the tender or not.

Power of Attorney authorizing the signatories of the tenderer to fill up & sign the tender is furnished in the tender or not.

Section 23

Details

Whether certificates granted by bankers regarding credit limit allowed to the Contractor and Bankers assessment of their Solvency submitted

Whether certificates granted by bankers regarding credit limit allowed to the Contractor and Bankers assessment of their Solvency submitted

Section 24

Details

Whether Audited balance sheets of last five years submitted or not

Whether Audited balance sheets of last five years submitted or not

Section 25

Details

To confirm whether the price for ?supply? and ?erection component? for sub station automation system has been quoted in complete shape considering the system...

To confirm whether the price for ?supply? and ?erection component? for sub station automation system has been quoted in complete shape considering the system as a whole including mandatory spare . Also, that the break up and details of different component of SAS has been described in complete shape in the techno commercial bid plus price schedule. Also that the quoted price of project includes provision of guarantee to be extended by contractor for SAS for a period of 5 years, after successful availability test.

Section 26

Details

Confirm that the total price for the complete project including design & drawing has been furnished and no extra claims shall be made for any other work requ...

Confirm that the total price for the complete project including design & drawing has been furnished and no extra claims shall be made for any other work required for completion of the project

Section 27

Details

Offer must be made complete in all respects as per Technical specification

Offer must be made complete in all respects as per Technical specification

Section 28

Details

Prices of spares and tools and plants shall be furnished separately by the bidder on FOR site basis inclusive of all taxes etc. BSPTCL reserves the right to ...

Prices of spares and tools and plants shall be furnished separately by the bidder on FOR site basis inclusive of all taxes etc. BSPTCL reserves the right to vary the quantity of spares during order.

Section 29

Details

All distribution Boards shall be fully enclosed, cabined type, fabricated from CRCA sheet steel minimum thickness as Specified in specification suitable for ...

All distribution Boards shall be fully enclosed, cabined type, fabricated from CRCA sheet steel minimum thickness as Specified in specification suitable for either wall/column/floor mounting. Indoor panels shall be dust and vermin prof. Outdoor panels shall be weather proof with canopy.

Section 30

Details

Though in the Specification for some equipments, particular make and type have not been mentioned, Equipments of make and types which are being used satisfac...

Though in the Specification for some equipments, particular make and type have not been mentioned, Equipments of make and types which are being used satisfactorily in BSPTCL, will be preferred. However, in case of equipments of makes, not supplied earlier to BSPTCL the credentials and updated performance reports regarding supplies made to other central and state Power utilities should be furnished. BSPTCL reserves the right to opt for the make and type.

Section 31

Details

Only type tested equipments and materials shall be supplied by the contractor

Only type tested equipments and materials shall be supplied by the contractor

Section 32

Details

All street light poles must have independent LILO junction box, isolating switches and fuses.

All street light poles must have independent LILO junction box, isolating switches and fuses.

Section 33

Details

For inside Control Room area and separate switchyard area tenderer shall have to arrange independent cable trays/racks for entire scheme with separate arrang...

For inside Control Room area and separate switchyard area tenderer shall have to arrange independent cable trays/racks for entire scheme with separate arrangement for D.C. cables.

Section 34

Details

Tenderer shall note and confirm that their scope of work shall fully comply with the requirement as detailed in BSPTCL's Specn.

Tenderer shall note and confirm that their scope of work shall fully comply with the requirement as detailed in BSPTCL's Specn.

Section 35

Details

The Insurance covering Transit Risk, Transportation Risk, handling (during loading and unloading), risk during storage, erection, commissioning, theft and fi...

The Insurance covering Transit Risk, Transportation Risk, handling (during loading and unloading), risk during storage, erection, commissioning, theft and fire shall be done and borne by the Tenderer for all the equipment/items devices pertaining to the sub-stn under turnkey package till the installation is handed over to BSPTCL authorities.

Section 36

Details

Tenderer to note and confirm that storing of all materials under this contract shall be within the Tenderer's scope of work and adequate security arrangement...

Tenderer to note and confirm that storing of all materials under this contract shall be within the Tenderer's scope of work and adequate security arrangement for the stores as well as in the areas of erection till the date of handling over, shall be tenderer's responsibility.

Section 37

Details

Tenderer to arrange their own suitable storage at their cost for lmaterials. Bidder also to construct temporary store as well as Site office at Bidders cost.

Tenderer to arrange their own suitable storage at their cost for lmaterials. Bidder also to construct temporary store as well as Site office at Bidders cost.

Section 38

Details

Tenderer to note and confirm that the BSPTCL and his duly authorised representative shall have an access to the contractor's premises, manufacturer's work fo...

Tenderer to note and confirm that the BSPTCL and his duly authorised representative shall have an access to the contractor's premises, manufacturer's work for all tests of the equipment, cable etc. as listed in the schedule of tender. Inspection and testing shall be carried out as per tender specification.

Section 39

Details

Tenderer to note and confirm that all the supplies shall conform to relevant ISS, IEC, I.E. RULES and BSPTCLspecifications. No material will be accepted unle...

Tenderer to note and confirm that all the supplies shall conform to relevant ISS, IEC, I.E. RULES and BSPTCLspecifications. No material will be accepted unless covered by relevant ISS, IEC on any other relevant approved specification as required.

Section 40

Details

Tenderer to note and confirm that the installation shall be complete in all respects for efficient and trouble free service For this purpose any part or part...

Tenderer to note and confirm that the installation shall be complete in all respects for efficient and trouble free service For this purpose any part or parts required whether specifically mentioned or not shall be deemed to be within tenderer's Scope. Any additional quantity which may be required over and above the quantiy as per approved bill of materials based on BSPTCL approved drawing to meet the site layout requirements and to achieve the best performance level as specified to BSPTCL shall be supplied and installed at no extra cost of BSPTCL During installation of equipments at site any minor modification of civil work like chipping, grouting, make chase or holes on the walls, floors etc. including materials such as sand, steel, cement as may be required at no extra cost to BSPTCL.

Section 41

Details

Tenderer to note that erection tools and tackles as may be required to complete installation work shall be arranged by you at no extra cost to BSPTCL. All pe...

Tenderer to note that erection tools and tackles as may be required to complete installation work shall be arranged by you at no extra cost to BSPTCL. All per commissioning checks and commissioning tools and istruments shall have to be arranged by the bidder at no extra cost to BSPTCL.

Section 42

Details

Tenderer to note and confirm that connectors, hardwares required for substation shall be quoted in lump sum basis which will be utilised in switchyard and sh...

Tenderer to note and confirm that connectors, hardwares required for substation shall be quoted in lump sum basis which will be utilised in switchyard and shall be as per the approved drawing. These should be type tested.

Section 43

Details

Tenderer to note and confirm that without the written consent of BSPTCL they will not assign or sublet the total contract or any part there of other than for...

Tenderer to note and confirm that without the written consent of BSPTCL they will not assign or sublet the total contract or any part there of other than for any part of the work for which the maker are named in the contract. Such contract if given shall not relieve him from any obligation, duty or responsibility as per the terms and conditions of the specification and the contract.

Section 44

Details

Tenderer to note and confirm that all the cable trays/racks/ladders/cable end boxes/conduties/electrical equipment (such as switchboard, panels, junction box...

Tenderer to note and confirm that all the cable trays/racks/ladders/cable end boxes/conduties/electrical equipment (such as switchboard, panels, junction boxes etc shall be effectively grounded with 50x6 Flat.)

Section 45

Details

Tenderer to note and confirm the following for the civil work required to complete foundation under the scope of vendor on turnkey basis. Tenderer to note an...

Tenderer to note and confirm the following for the civil work required to complete foundation under the scope of vendor on turnkey basis. Tenderer to note and confirm that relevant data those may be required for the above work and the survey work will be undertaken immediately on receipt of confirmed order. Tenderer also to note that all supply of consumable materials including cement and steel shall be arranged by the contractor. No separate charges for design and preparation of detailed drawing will be entertained by BSPTCL.

Section 46

Details

Construction of approach road, culverts, roads inside Grid sub - stn. Including switchyard for transportation of heavy equipment i.e. Power transformer of 50...

Construction of approach road, culverts, roads inside Grid sub - stn. Including switchyard for transportation of heavy equipment i.e. Power transformer of 50MVA etc.is included in the scope of work whether mentioned in the price schedule or not. The road shall be made of PCC of adequate strength.

Section 47

Details

Tenderer to note and confirm the following drawings and details in quadruplicate shall be furnished as per tender specifications - (A) Tentative scheme for e...

Tenderer to note and confirm the following drawings and details in quadruplicate shall be furnished as per tender specifications - (A) Tentative scheme for extension of control building as per specification. Complete schedule to be furnished. (B) Tentative scheme for drainage and approach road. (C) Tentative lighting scheme both indoor and outdoor with design calculation with the light fittings used. (D) Tentative scheme for grounding along with calculations. (E) Plan, elevation and other detailed drawing for extension of control building for extension works as and where specified. (F) Detailed drawing for all connectors, hardwares and insulators. (G) Detailed plan, elevation of extension portion of 220/132/33 KV switchyard mentioning all parameter as per CBIP, ISS, I.E Rules etc.

Section 48

Details

Tenderer to note and confirm that AC/DC change over BSPTCL Indoor type suitable for mounting complete with AC/DC conductor, auxiliary conductor, timer, test ...

Tenderer to note and confirm that AC/DC change over BSPTCL Indoor type suitable for mounting complete with AC/DC conductor, auxiliary conductor, timer, test push button, DC Voltmeter, DC feeder shall have to be included in your price.

Section 49

Details

Tenderer to note and confirm that the lighting switch boards flash type with 5 A switch and 5A socket including space for fixing electronic hand regulator sh...

Tenderer to note and confirm that the lighting switch boards flash type with 5 A switch and 5A socket including space for fixing electronic hand regulator shall be used.

Section 50

Details

Tenderer to note and confirm that any additional requirement for AC/DC changeover board, lighting junction boxes and lighting board are required to fulfill t...

Tenderer to note and confirm that any additional requirement for AC/DC changeover board, lighting junction boxes and lighting board are required to fulfill the entire installation, depending on the requirement, shall be within the scope of work with no extra cost to BSPTCL.

Section 51

Details

Tenderer to note and confirm the following for the civil work required to complete foundation under the scope of vendor - Preparation of design and detailed ...

Tenderer to note and confirm the following for the civil work required to complete foundation under the scope of vendor - Preparation of design and detailed working drawing and construction of foundation for equipment and structure to be supplied by tenderer as per approved drawing. (A) Preparation of design and detailed working drawing for construction of control room building and execution of the same as per approved drawing. (B) Construction of RCC cover for cable trench as per approved drawing. (C) Tenderer also to note that supply of all consumable materials including cement and steel shall be arranged by the contractor. No separate charges for design and preparation of detailed drawing will be entertained by BSPTCL.

Section 52

Details

Tenderer to note and confirm that the transformer shall be completely assembled and tested at the factory. Tests shall be performed in compliance of relevant...

Tenderer to note and confirm that the transformer shall be completely assembled and tested at the factory. Tests shall be performed in compliance of relevant ISS/IEC (as amended uptodate) CBIP regulations and BSPTCL specification.

Section 53

Details

Tenderer to note and confirm that type tests( as specified in the tender specifications) shall be carried out as per IS 2026 or IEC publication on the new tr...

Tenderer to note and confirm that type tests( as specified in the tender specifications) shall be carried out as per IS 2026 or IEC publication on the new transformer (to be supplied by tenderer). All the equipments provided shall also comply with the latest revision of Indian Electricity Act and Indian Electricity Rules and any another applicable statutory provisions, rules and regulations. All equipments provided under the specification shall generally conform to the latest issue of the ISS and BSPTCL specifications.

Section 54

Details

Tenderer to confirm that they will furnish following documents: i) Bank Guarantee towards security deposit/contract performance, guarantee before execution o...

Tenderer to confirm that they will furnish following documents: i) Bank Guarantee towards security deposit/contract performance, guarantee before execution of the contract Agreement. ii) Bank Guarantee for advance payment. iii) Pert CPM/Barchart/Execution schedule for completion of the project before execution of the agreement. iv) Indemnity Bond for the equipments delivered and handed over to the contractor. v) Bank Guarantee against performance guarantee. vi) Power of Attorney by all the partners in case of Joint Venture for authorising the lead partner. vii) Copy of Agreement executed by the members of Joint Ventures.

Section 55

Details

Sales tax on Works contract, Turnover Tax on any other similar taxes under the Sales Tax, Act, as applicable, are included in the Bid/tendered price and BSPT...

Sales tax on Works contract, Turnover Tax on any other similar taxes under the Sales Tax, Act, as applicable, are included in the Bid/tendered price and BSPTCL/Purchaser shall not bear any expenditure/liability on this account. Entry tax, if any shall be extra.

Section 56

Details

The tenderer prices quoted in price schedule included all import duties and levies including licence fees lawfully payable by the contractor on imported good...

The tenderer prices quoted in price schedule included all import duties and levies including licence fees lawfully payable by the contractor on imported goods/items and other taxes and duties on bought-out components, materials, equipments and other items and no such taxes, duties & levies shall be additionally payable by the BSPTCL. Tenderer are also to confirm that no taxes and duties (except octrai/entry tax if applicable) shall be payable by the BSPTCL/Purchaser on bought-out items which are dispatched by the Sub-vendors of the contractor directly to the project site on sale-in-transit basis. However, BSPTCL shall provide necessary concessional sales tax declaration from, as concessional sales tax has been included in the price for such sale in transit transactions. The applicable Octroi/entry tax, as indicated in price also be reimbursed by the BSPTCL subject to furnishing of documentary proof.

Section 57

Details

It is hereby confirmed that the bidder/tenderer is making the offer on the basis of a divisible supply-cum-Erection Contract on a single source responsibilit...

It is hereby confirmed that the bidder/tenderer is making the offer on the basis of a divisible supply-cum-Erection Contract on a single source responsibility basis. The supply portion of the Contract will relate to supply of equipments/materials and erection portion will relate to transportation, insurance, storage, intallation, construction, stringing, testing and commissioning etc as defined in price schedules. The Tender/bidder has no objection if the contract is considered to be placed in to separate contracts, i.e., one contract for supply of all equipment on ex-works basis and second contract for all services such as in land transportation, insurance, handling at site, storage, isurance, erection, testing and commissioning etc of materials/ items as defined in the tender specifications. This is also hereby confirmed that the award of two contracts will not in any way absolve the contractor of any responsibility and obligation as per the terms and conditions of the tender specification for succesful completion of the complete work as per the tender specifications and both the contract will have a cross fall breach Clause i.e., a breach in one contract will automatically be considered as breech of the other contract which will conform the BSPTCL/Purchaser/ Employer the right to terminate the other contract at th contractor's risk and cost.

Section 58

Details

It is hereby confirmed that if any income-tax, surcharge on income tax or any other corporate tax is applicable/payble under the law, the same shall be paid ...

It is hereby confirmed that if any income-tax, surcharge on income tax or any other corporate tax is applicable/payble under the law, the same shall be paid by the contractor.

Section 59

Details

It is confirmed that the contract shall be executed strictly in accordance with the specifications and documents except for the variations and deviations, al...

It is confirmed that the contract shall be executed strictly in accordance with the specifications and documents except for the variations and deviations, all of which have been detailed out exhaustively in the following schedules irrespective of what soever has been stated to the contrary any where else in the tender/offer/bid. - (i) Schedule of deviations against technical specifications. (ii) Schedule of deviations against general conditions of the contract. (iii) Schedule of revision of prices against deviations as detatiled.

Section 60

Details

Confirm that the following clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...

Confirm that the following clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.: Prices, Security Deposit, Earnest Money, Liquidated damage for delay,stage penalty, incentives., Guarantee, Terms of Payment, Performance guarantee, Taking Over, Insurance,

Section 61

Details

Confirm that additional conditions, deviations, if any, found in the proposal documents other than those stated in the deviation schedules, save the pretaini...

Confirm that additional conditions, deviations, if any, found in the proposal documents other than those stated in the deviation schedules, save the pretaining to any rebate, offered, shall stand with drawn.

Section 62

Details

Unit rates of items/equipments/works as and where required have been furnished

Unit rates of items/equipments/works as and where required have been furnished

Section 63

Details

The details of equipments/materials proposed to be supplied as bought out items have been furnished in a separate schedule.

The details of equipments/materials proposed to be supplied as bought out items have been furnished in a separate schedule.

Section 64

Details

The required documents related to the pre-qualification of he tenderers as detailed in the tender specifications has been furnished in the tender. The docume...

The required documents related to the pre-qualification of he tenderers as detailed in the tender specifications has been furnished in the tender. The documents for the fulfillment of the requirement of the tender specifications have been furnished.

Section 65

Details

Confirm that if the offer is submitted against the tender is accepted by the BSPTCL, the contractor agree to submit engineering data, provide services and co...

Confirm that if the offer is submitted against the tender is accepted by the BSPTCL, the contractor agree to submit engineering data, provide services and complete the entire work in accordance with schedule indicated in the tender/offer. It has been clearly understood that the time for completion of the project is the essence of the contract and hence the execution schedule shall be strictly adhered to the execution schedule has been furnished with the offer.

Section 66

Details

Separate schedule for each item for which L.S. price have been quoted should be furnished with part I of the tender.

Separate schedule for each item for which L.S. price have been quoted should be furnished with part I of the tender.

Section 67

Details

Confirm that all equipments and materials confirming strictly to the tender specification only shall be offered to be delivered in case the order is placed o...

Confirm that all equipments and materials confirming strictly to the tender specification only shall be offered to be delivered in case the order is placed on the bidder. In case of any deviations in the technical specification or make of offered materials/equipments, the BSPTCL shall not be responsibble for any delay even if it is approved proved.

Section 68

Details

Confirm that no extra claim shall be entertained by the BSPTCL for the specified scope of work

Confirm that no extra claim shall be entertained by the BSPTCL for the specified scope of work

Section 69

Details

To confirm whether the price for ?supply? and ?erection component? for sub station automation system has been quoted in complete shape considering the system...

To confirm whether the price for ?supply? and ?erection component? for sub station automation system has been quoted in complete shape considering the system as a whole including mandatory spare . Also, that the break up and details of different component of SAS has been described in complete shape in the techno commercial bid plus price schedule. Also that the quoted price of project includes provision of guarantee to be extended by contractor for SAS for a period of 5 years after successful availability test.

Section 70

Details

To confirm whether 10% BG would be furnished by that contractor towards employing vendor support if any during guarantee period of SAS as per Cl. 1.3.39.1 of...

To confirm whether 10% BG would be furnished by that contractor towards employing vendor support if any during guarantee period of SAS as per Cl. 1.3.39.1 of Vol. I of tender specification. Please specify clearly whether support of vendor would be obtained for SAS system or the contractor itself is capable for design, manufacture, supply and installation of SAS system.

Section 71

Details

Required supplementary information and supportive document to complement the bid be submitted as attachment to shedule 'P-III'

Required supplementary information and supportive document to complement the bid be submitted as attachment to shedule 'P-III'

Section 72

Details

Bidder must fill up attached BOQ excel sheet and upload the same. Also fill up the final project cost obtained from BOQ excel summary sheet to BOQ tab of e-p...

Bidder must fill up attached BOQ excel sheet and upload the same. Also fill up the final project cost obtained from BOQ excel summary sheet to BOQ tab of e-portal. Bidder must ensure that the total project cost in filled excel sheet and cost filled in BOQ tab of e-portal must be same. If any discrepancy is found, the project cost filled in attached BOQ excel sheet shall prevail.

Authority Records

BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 16

NIT-21 E-tender notice.PDF

NIT

SBD Rev-21 21-05-2026.pdf

GENERAL_DOCUMENT

VOL-2A NIT-21-2026.pdf

NIT

Technical sheet bay NIT-21-2026.xlsx

NIT

Technocommercial Sheet NIT-21-2026.xls

NIT

33kV System.pdf

GENERAL_DOCUMENT

ABT Meter.pdf

GENERAL_DOCUMENT

Circuit Breaker.pdf

GENERAL_DOCUMENT

Control & Protection Panel.pdf

GENERAL_DOCUMENT

MAINTENANCE FREE EARTHPITS -ROCKY SOIL.pdf

GENERAL_DOCUMENT

Maintenance Free Treated Earth Pit.pdf

GENERAL_DOCUMENT

MAINTENANCE-FREE-EARTHPITS -NORMAL-SOIL.pdf

GENERAL_DOCUMENT

Power & Control Cables.pdf

GENERAL_DOCUMENT

TS for Isolator.pdf

GENERAL_DOCUMENT

SURGE ARRESTER.pdf

GENERAL_DOCUMENT

BOQ FINAL - TO Upload.xlsx

BOQ

Past Similar Tenders (Historical Results)

5 found

Government Tender Published for Design, Engineering, Supply, Erection, Testing and Commissioning of 03 (Three) nos. 33kV line feeder bay at 132/33 kV GSS, Bhawnathpur (Nagar Untari) on turnkey basis. in GARHWA, JHARKHAND

N/A

GARHWA, JHARKHAND

Posted: 19 January 2024
Closed: 12 February 2024
EPROCURE

Bids are Invited For Construction of 33 KV Bay (RDSS Scheme) at 132 KV GSS Dhola Kuwa in DAUSA, RAJASTHAN

N/A

DAUSA, RAJASTHAN

Posted: 1 January 2025
Closed: 15 January 2025
EPROCURE

Contract Bidding Open For Turnkey Construction of 01 (one) no. of 33kV Feeder Bay including Civil works at 132 kV AIIMS GSS, AEGCL in KAMRUP, ASSAM

N/A

KAMRUP, ASSAM

Posted: 8 November 2024
Closed: 13 December 2024
EPROCURE

Tender Notice for Construction of 02 Nos. 132 KV GSS Harnavda Shahji and Sunel along with associated lines and Bays under BN-9016002421 in JAIPUR, RAJASTHAN

N/A

JAIPUR, RAJASTHAN

Posted: 19 December 2024
Closed: 12 February 2025
EPROCURE

Government Tender Published for Turnkey construction of 33kV Feeder Bay in KAMRUP, ASSAM

N/A

KAMRUP, ASSAM

Posted: 15 March 2024
Closed: 8 April 2024
EPROCURE

Bill of Quantities (BOQ) 1 Item Sign in for GEM prices

#01

Price BOQ

Price BOQ

1 Work Rate: ₹3,18,14,828 Est: ₹1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Similar Tenders

5 found

Construction of 132 Kv and 33 Kv bays along with associated works at 132/33 kV GSS Valmikinagar.

📍 BIHAR

EMD: ₹5.0 L
Est: ₹5.0 Cr
⏰ Deadline: 2 weeks left
View EPROCURE-BIHAR
Urgent

Invitation to Bid - Construction of 1No. 33KV Bay towards reorientation of existing 33KV Shivgarh feeder from 132KV Ss to 220 KV Ss Ratlam and providing 33 KV power supply from the vacant bay at 132KV Ss Ratlam to Substation for Industrial Park Alcohol Plant Ratlam in RATLAM, MADHYA PRADESH

MP Industrial Development Corporation Limited

📍 RATLAM, MADHYA PRADESH

EMD: ₹50,000
Est: ₹48.9 L
⏰ Deadline: 2 days left
🛒 Type: Works
View EPROCURE

Invitation to Bid - Construction of 03 Nos. 132KV bays (01 No. each at 132KV GSS Siwana, 132KV GSS Panoriya and 220KV GSS Sheo) for erection of 132KV equipment, structures, Jumpering and Earthing work, laying, termination and joining of cables on labour contract basis. in BARMER, RAJASTHAN

RRVPN - CMD

📍 BARMER, RAJASTHAN

EMD: ₹15,100
Est: ₹7.5 L
⏰ Deadline: 2 weeks left
🛒 Type: Works
View EPROCURE
Urgent

Procurement Opportunity: To Create 33 KV bay for fee... in SIRSA, HARYANA

Haryana Board Corporation

📍 SIRSA, HARYANA

EMD: ₹30,570
Est: ₹15.3 L
⏰ Deadline: 7 days left
🛒 Type: Works
View EPROCURE
Urgent

Bids are Invited For Civil works for Construction of 01 No. 33 KV Bay for M/s Okas Ganga Agritech Pvt. Ltd. at 220 KV S/S Sikandrabad, Bulandsahar. in GAUTAM BUDDHA NAGAR, UTTAR PRADESH

UP Power Transmission Corp.Ltd (Works and Projects))

📍 GAUTAM BUDDHA NAGAR, UTTAR PRADESH

EMD: ₹5,500
⏰ Deadline: 6 days left
🛒 Type: Works
View EPROCURE

Explore More Opportunities

Quick Access
Chat with us