TenderDekho Logo
Active GEM

Bids are Invited For M-PIPE-00005,M-PIPE-00084,M-PIPE-00050,M-PIPE-0934,M-PIPE-0948,M-PIPE-01005,M-PIPE-00293,M-PIPE-009 in GOLAGHAT, ASSAM

Bid Publish Date

30-Jul-2026, 4:19 pm

Bid End Date

13-Aug-2026, 1:00 pm

Location

GOLAGHAT , ASSAM

Progress

Issue30-Jul-2026, 4:19 pm
Corrigendum03-Aug-2026
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

5773

Category

M-PIPE-00014-2

Bid Type

Two Packet Bid

Categories 10

Numaligarh Refinery Limited invites bids for M-PIPE-00005, M-PIPE-00084, M-PIPE-00050, M-PIPE-0934, M-PIPE-0948, M-PIPE-01005, M-PIPE-00293, M-PIPE-00901, M-PIPE-00083, M-PIPE-00003, M-PIPE-00248, M-PIPE- 00246, M-PIPE-00247, M-PIPE-00007, M-PIPE-00004, M- PIPE-00321, M-PIPE-00768, M-PIPE-00142, M-PIPE-00188, M-PIPE-0916, M-PIPE-00236, M-PIPE-0931, M-PIPE-00309, M-PIPE-00253, M-PIPE-00773, M-PIPE-01002, M-PIPE-01003, M-PIPE-0952, M-PIPE-00170, M-PIPE-00202, M-PIPE-00895, M-PIPE-00315, M-PIPE-00984, M-PIPE-00788, M-PIPE-0929, M-PIPE-00318, M-PIPE-00969, M-PIPE-00014-2, M-PIPE- 00731, M-PIPE-00864, M-PIPE-00880, M-PIPE-00889, M- PIPE-00894, M-PIPE-0941, M-PIPE-00118, M-PIPE-00270, M-PIPE-00317, M-PIPE-00277, M-PIPE-00229, M-PIPE-00221, M-PIPE-00981, M-PIPE-00372, M-PIPE-0930, M-PIPE-00021, M-PIPE-0944, M-PIPE-0946 in GOLAGHAT, ASSAM. Quantity: 5773. Submission Deadline: 13-08-2026 13: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

M-PIPE-00005 , M-PIPE-00084 , M-PIPE-00050 , M-PIPE-0934 , M-PIPE-0948 , M-PIPE-01005 , M-PIPE-00293 , M-PIPE-00901 , M-PIPE-00083 , M-PIPE-00003 , M-PIPE-00248 , M-PIPE- 00246 , M-PIPE-00247 , M-PIPE-00007 , M-PIPE-00004 , M- PIPE-00321 , M-PIPE-00768 , M-PIPE-00142 , M-PIPE-00188 , M-PIPE-0916 , M-PIPE-00236 , M-PIPE-0931 , M-PIPE-00309 , M-PIPE-00253 , M-PIPE-00773 , M-PIPE-01002 , M-PIPE-01003 , M-PIPE-0952 , M-PIPE-00170 , M-PIPE-00202 , M-PIPE-00895 , M-PIPE-00315 , M-PIPE-00984 , M-PIPE-00788 , M-PIPE-0929 , M-PIPE-00318 , M-PIPE-00969 , M-PIPE-00014-2 , M-PIPE- 00731 , M-PIPE-00864 , M-PIPE-00880 , M-PIPE-00889 , M- PIPE-00894 , M-PIPE-0941 , M-PIPE-00118 , M-PIPE-00270 , M-PIPE-00317 , M-PIPE-00277 , M-PIPE-00229 , M-PIPE-00221 , M-PIPE-00981 , M-PIPE-00372 , M-PIPE-0930 , M-PIPE-00021 , M-PIPE-0944 , M-PIPE-0946

Advisory Bank

AXIS BANK LTD

ePBG Percentage

3%

ePBG Duration (Months)

21

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

06-08-2026 15:00:00

Pre-Bid Venue

The Pre Bid will be conducted on above mentioned date & time via MS Teams / Online / VC. For Teams meeting link please mail at [email protected]. Any change in the pre bid schedule will be intimated through GeM Only.

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Golaghat

Delivery Pincodes

785699

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Dibakar Barhoi785699,Numaligarh Refinery Limited, Chief General Manager (Commercial) PO-NRP, Numaligarh Warehouse office 03776-265562GolaghatAssam785699534180-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASNUMALIGARH REFINERY LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9683120.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 56 Items Sign in for GEM prices

#1

M-PIPE-00005

C.WELDEDPIPE 2.00 IS-1239 BE HVY IS-1239

534 m Delivery: 180 days
#2

M-PIPE-00084

PIPE,ASTM A106 GR.B, IBR, 0.75 INCH,S16

96 m Delivery: 180 days
#3

M-PIPE-00050

SEAMLESSPIPE 1.00 B36.10 PE S80 ASTMA106

132 m Delivery: 180 days
#4

M-PIPE-0934

SMLS PIPE 4.0 STD BE A106 Gr. B

426 m Delivery: 180 days
#5

M-PIPE-0948

SMLS PIPE 6.0 S120 A106 Gr.B H2

27 m Delivery: 180 days
#6

M-PIPE-01005

SMLS PIPE 4.0 Sch XS A 106 GR.B H2

12 m Delivery: 180 days
#7

M-PIPE-00293

SMLS PIPE 12.0 S80 BE A106GrB NACE+H2

6 m Delivery: 180 days
#8

M-PIPE-00901

C.WELDED PIPE 0.75 PE HVY IS-1239 BLACK

226 m Delivery: 180 days
#9

M-PIPE-00083

PIPE, ASTM A106 GR.B, IBR, 0.5 INCH,S16

54 m Delivery: 180 days
#10

M-PIPE-00003

C.WELDEDPIPE 1.00 IS-1239 PE HVY BLACK .

534 m Delivery: 180 days
#11

M-PIPE-00248

SEAMLESSPIPE 1.00 B36.10 PE XS ASTMA106G

42 m Delivery: 180 days
#12

M-PIPE-00246

SEAMLESSPIPE 0.50 B36.10 PE XS ASTMA106G

216 m Delivery: 180 days
#13

M-PIPE-00247

SEAMLESSPIPE 0.75 B36.10 PE XS ASTMA106G

432 m Delivery: 180 days
#14

M-PIPE-00007

C.WELDEDPIPE 3.00 IS-1239 BE HVY IS-1239

316 m Delivery: 180 days
#15

M-PIPE-00004

C.WELDEDPIPE 1.50 IS-1239 PE HVY IS-1239

404 m Delivery: 180 days
#16

M-PIPE-00321

SEAMLESS PIPE 0.5 Sch 160 A 333 Gr.6

18 m Delivery: 180 days
#17

M-PIPE-00768

PIPE2 BE, SEAMLESS,A106 Gr.B,XS,B-36.10

12 m Delivery: 180 days
#18

M-PIPE-00142

SEAMLESSPIPE 0.75 B36.10 PE S160 ASTMA10

18 m Delivery: 180 days
#19

M-PIPE-00188

SEAMLESS PIPE 5.00 BE STDA106GR.B

120 m Delivery: 180 days
#20

M-PIPE-0916

SMLS PIPE 4.00 B36.10 XS A106GrB NACE

42 m Delivery: 180 days
#21

M-PIPE-00236

SMLS PIPE 3.0 XS BE A106GrB NACE

30 m Delivery: 180 days
#22

M-PIPE-0931

SMLS PIPE 1.5 XXS PE A106 GR.B

24 m Delivery: 180 days
#23

M-PIPE-00309

SMLS PIPE 2.0 Sch XXS BE A106 Gr.B

24 m Delivery: 180 days
#24

M-PIPE-00253

SEAMLESSPIPE 6.00 B36.10 BE STD ASTMA106

18 m Delivery: 180 days
#25

M-PIPE-00773

PIPE 106 GR.B BE SEAMLESS 8.0 INCH XS

198 m Delivery: 180 days
#26

M-PIPE-01002

SMLS PIPE 6.0 Sch XS A 106 GR.B

18 m Delivery: 180 days
#27

M-PIPE-01003

SMLS PIPE 10.0 Sch 30 A 106 GR.B

12 m Delivery: 180 days
#28

M-PIPE-0952

SMLS PIPE 0.75 Sch XXS A106 GR.B H2

180 m Delivery: 180 days
#29

M-PIPE-00170

SEAMLESSPIPE 1.50 S160 ASTM A106 GR. B

126 m Delivery: 180 days
#30

M-PIPE-00202

PIPE 4.0 B36.10 Sch 160 A106GrB NORM H2

24 m Delivery: 180 days
#31

M-PIPE-00895

SMLS PIPE 1.00 B36.10 S160 ASTMA106GR.B

12 m Delivery: 180 days
#32

M-PIPE-00315

SMLS PIPE 0.75 Sch 160 BE A106 Gr.B IBR

78 m Delivery: 180 days
#33

M-PIPE-00984

SMLS PIPE 1.0 Sch 160 A106 Gr.B H2

18 m Delivery: 180 days
#34

M-PIPE-00788

SEAMLESS PIPE 6.0 STD BE A106 GRADE B H2

6 m Delivery: 180 days
#35

M-PIPE-0929

SMLS PIPE 2.0 S160 A106 Gr. B H2

18 m Delivery: 180 days
#36

M-PIPE-00318

SMLS PIPE 3.0 Sch XS BE A106 Gr.B

18 m Delivery: 180 days
#37

M-PIPE-00969

SMLSPIPE 6.0 B36.10 S160 A106GrB NORM H2

18 m Delivery: 180 days
#38

M-PIPE-00014-2

C WELDED PIPE 12.00 IS-3589 Gr 410 6MM

582 m Delivery: 180 days
#39

M-PIPE-00731

ERW PIPE 12.000 INCH BE 6.35 MM IS-3589G

144 m Delivery: 180 days
#40

M-PIPE-00864

SMLS PIPE 2.00 B36.10 BE S160 A 106 Gr B

18 m Delivery: 180 days
#41

M-PIPE-00880

SMLS PIPE 1.5 S160 B36.10 PE A106GRB IBR

120 m Delivery: 180 days
#42

M-PIPE-00889

SMLS PIPE 1.0 S40 B36.10 PE A106GRB

18 m Delivery: 180 days
#43

M-PIPE-00894

SMLS PIPE 2.00 B36.10 S80 ASTM A333GR.6

96 m Delivery: 180 days
#44

M-PIPE-0941

SMLS PIPE 0.75 S160 A106 Gr.B NACE

18 m Delivery: 180 days
#45

M-PIPE-00118

SMLS PIPE 2.0 BE XS A 335 Gr. P11 IBR

84 m Delivery: 180 days
#46

M-PIPE-00270

SEAMLESS PIPE 3.00 B36.10 BE S80 P11 IBR

6 m Delivery: 180 days
#47

M-PIPE-00317

SMLS PIPE 0.75 Sch 160 A335 Gr.P11 IBR

12 m Delivery: 180 days
#48

M-PIPE-00277

SEAMLESSPIPE 6.00 B36.10 BE S80 ASTMA335

24 m Delivery: 180 days
#49

M-PIPE-00229

SMLS PIPE 2.0 S160 BE A 335 GR.P11 H2

24 m Delivery: 180 days
#50

M-PIPE-00221

SMLS PIPE 1.0 S160 A 335 GR.P11 I

18 m Delivery: 180 days
#51

M-PIPE-00981

SMLS PIPE 2.0 BE Sch.XS A335 Gr.P5 B36.1

18 m Delivery: 180 days
#52

M-PIPE-00372

SEAMLESS PIPE 0.50 PE S40 A 312 TP 304L

24 m Delivery: 180 days
#53

M-PIPE-0930

EFSW PIPE 10 34mm A358 TP316L SHTP H2

12 m Delivery: 180 days
#54

M-PIPE-00021

PIPE,TP304, PE, SEAMLESS, 0.5 INCH, 80S

24 m Delivery: 180 days
#55

M-PIPE-0944

SMLS PIPE 0.5 80S PE A312 Gr.TP 304L

24 m Delivery: 180 days
#56

M-PIPE-0946

SMLS PIPE 1.5 40S A312 TP 316L

18 m Delivery: 180 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Corrigendum Updates

1 Update
#1

Update

03-Aug-2026