TenderDekho Logo
Active GEM

Bharatiya Rail Bijlee Company Limited UV-Visible Dual Beam Spectrophotometer Tender 2026 India

Bid Publish Date

07-Oct-2026, 10:20 am

Bid End Date

27-Oct-2026, 11:00 am

Progress

Issue07-Oct-2026, 10:20 am
AwardPending

Tender Overview

Organization: Bharatiya Rail Bijlee Company Limited. Product: UV-Visible Dual Beam Spectrophotometer procurement. Location: tender data lacks explicit city/state details. Estimated value: not disclosed; EMD: not disclosed. Scope appears to be a single-supply instrument with potential quantity adjustments up to 25% during and after contract placement. The tender references an ATC document and a Buyer Added Clause detailing flexible delivery timelines tied to quantity variations. The absence of BOQ items suggests either a direct equipment quote or an incomplete procurement set. The unique clause enabling volume variation at contracted rates differentiates this bid from standard fixed-quantity calls. This opportunity hinges on compliance with the ATC terms and accurate specification alignment to the spectrophotometer category.

Technical Specifications & Requirements

  • Product category: UV-Visible spectrophotometer, dual-beam configuration.
  • Key clause: Option to increase/decrease quantity by up to 25% of bid/contract quantity.
  • Delivery timeline rules: Delivery period starts from the last date of the original delivery order; additional time formula is (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • ATC document: Uploaded by buyer; bidders must review for site-specific compliance.
  • BOQ: No items listed; implies a need for technical/commercial alignment with instrument specifications and optional quantities.
  • Standards/Compliance: Not explicitly specified in the data; bidders should seek IS/ISO alignment through ATC if required.

Terms, Conditions & Eligibility

  • EMD: Not disclosed in tender data.
  • Delivery: Flexible according to option clause; additional time mechanics defined above.
  • Pricing/Quantity: 25% quantity variation permitted; contract rates apply across extended period.
  • Documentation: Review ATC; ensure compliance with bidder requirements for spectrophotometer procurement.
  • Warranty/Support: Not specified in data; bidders should verify through ATC.
  • BOQ: Not present; confirm instrument model, accessories, and service terms in final offer.
  • Compliance: Follow buyer-added terms and any OEM/brand requirements in ATC.

Key Specifications

  • Product/service names: UV-Visible Dual Beam Spectrophotometer

  • Estimated value: Not disclosed

  • Quantity: Not specified; 25% variation allowed

  • Delivery: As per option clause; minimum 30 days additional time

  • Standards/certifications: Not specified; verify via ATC

  • Warranty/AMC: Not specified

  • OEM/Brand: Not specified in data

Terms & Conditions

  • Option clause allows ±25% quantity variation at contract time

  • Delivery period calculation includes minimum 30 days for added quantity

  • ATC document governs specific terms and compliance

Important Clauses

Payment Terms

Not specified in data; verify in ATC and final contract

Delivery Schedule

Delivery period may extend due to option clause; calculation defined as (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days

Penalties/Liquidated Damages

Not specified in data; confirm in ATC

Bidder Eligibility

  • Experience in supplying UV-Visible spectrophotometers or similar analytical instruments

  • Capability to handle 25% quantity variation at contracted rates

  • Compliance with OEM/brand terms as per ATC document

Advertisement

Tender Data

Bid Details

Quantity

2

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

UV-VISIBLE DUAL BEAM SPECTROPHOTOMETER-M26970010

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Aurangabad

Delivery Pincodes

824303

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Gajendra Singh Bandi824303,Bhartiya Rail Bijlee Company Limited- A subsidiary of NTPC Ltd. Nabinagar Khaira Thana AURANGABADAurangabadBihar824303290-

Authority Records

MINISTRY OF POWERBHARTIYA RAIL BIJLEE COMPANY LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9979271.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Bhartiya Rail Bijlee Company Limited

Grievance Contact

[email protected]

Categories 19

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar spectrophotometer supply

4

Financial statements / turnover documentation

5

EMD submission (method not disclosed in data; verify via ATC)

6

Technical bid documents demonstrating instrument specifications

7

OEM authorization / dealership certificates (if applicable)

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for UV-Visible spectrophotometer tender in India with option quantity

Bidders should submit technical bid detailing instrument specs, OEM authorizations, and financial statements, along with tender documents per ATC. Ensure compliance with the 25% quantity variation clause and verify delivery timelines. Include any required warranty and service terms as specified in the ATC.

What documents are required for spectrophotometer procurement in this tender

Required documents include GST certificate, PAN, experience certificates for similar supplies, financial statements, EMD submission as per ATC, technical bid demonstrating instrument specifications, and OEM authorization if not directly supplied by the manufacturer.

What are the delivery terms for the UV-Visible spectrophotometer bid 2026

Delivery is governed by the option clause permitting up to 25% extra quantity; the delivery period starts from the last date of the original delivery order, with additional time calculated by (Increased quantity ÷ Original quantity) × Original period, minimum 30 days.

What standards or certifications are required for this spectrophotometer tender

The tender data does not specify standards; bidders should consult the ATC document for IS/ISO requirements or OEM compliance. Ensure spectrophotometer model alignment with IS 550 or ISO standards if indicated in the ATC.

How is the estimated value determined for this BRCBL spectrophotometer tender

No estimated value is disclosed in the tender data; bidders should infer pricing from instrument configuration, accessories, and potential quantity variations under the 25% option clause, confirmed in the ATC.

What is the eligibility criteria for supplying this spectrophotometer to BRCBL

Eligibility includes demonstrated experience in supplying UV-Visible spectrophotometers or comparable instruments, financial stability, GST registration, and compliance with OEM/brand terms as per the ATC document; provide relevant completion certificates.

When is the bidding window for the UV-Visible spectrophotometer procurement in 2026

The tender data does not present explicit start/end dates; bidders must refer to the ATC and official bid notice for exact submission deadlines and any extension provisions linked to quantity variation.

What is the process to verify OEM authorization for this spectrophotometer bid

Submit OEM authorization or dealership certificates proving rights to supply the specified UV-Visible dual beam spectrophotometer; include manufacturer’s product datasheet and warranty terms as part of the technical bid.