Bid Publish Date
27-Feb-2026, 10:41 am
Bid End Date
07-Apr-2026, 11:00 am
EMD
₹11,500
Location
Progress
Quantity
3
Bid Type
Two Packet Bid
Bhakra Beas Management Board announces a tender for Air Circuit Breaker (Q2) in MANDI, HIMACHAL PRADESH. Quantity: 3. Submission Deadline: 07-04-2026 11: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Air Circuit Breaker (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| RATINGS | Rated operational voltage (in Volts) | 415 |
| RATINGS | Rated insulation voltage (in Volts) | 1000 |
| RATINGS | Rated current (in Amp) | 1250 |
| RATINGS | No of poles | 3 |
| RATINGS | Rated short circuit breaking current (in KA, rms) | 50 |
| RATINGS | Rated short time withstand current (in KA, rms) | 50 KA for 1 second |
| RATINGS | Rated short circuit making current (in KA, peak ) | 105 |
| RATINGS | Rated insulation level: Rated lightning impulse withstand voltage (in KV) | 12 |
| RATINGS | Opening time (in milli second) | ≤ 40, ≤ 45, ≤ 50 |
| RATINGS | Closing time (in milli second) | ≤ 60, ≤ 70, ≤ 80 |
| RATINGS | Suitable for isolation | Yes |
| CONSTRUCTION | Method of controlling the operating mechanism | Dependent manual operation, Independent manual operation, Dependent power operation, Independent power operation, Stored energy operation, Remote as well as manual, with DC shunt release and closing coil |
| CONSTRUCTION | Provision of Electronic trip unit (ETU) | Yes |
| CONSTRUCTION | Function of ETU | Measurement of current, Over load protection, Short circuit protection, Earth fault protection, Various fault indications, Without ETU unit |
| CONSTRUCTION | Type of mounting | Draw out type |
| CONSTRUCTION | Other provisions for each air circuit breaker | Suitable chasis and connections, Indicators provided on the ACB, Interlocking for under voltage release |
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
07-Apr-2026, 11:00 am
Opening Date
07-Apr-2026, 11:30 am
Extended Deadline
31-Mar-2026, 11:00 am
Opening Date
31-Mar-2026, 11:30 am
Extended Deadline
24-Mar-2026, 11:00 am
Opening Date
24-Mar-2026, 11:30 am
Extended Deadline
17-Mar-2026, 11:00 am
Opening Date
17-Mar-2026, 11:30 am
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS