RAOrganization: Indian Army, Department of Military Affairs. Product/Service: Upkeeping and restoration of BB Racker 239 Nos at GE EP Jodhpur (Jodhpur, Rajasthan 342001) including ground-stacking, rust removal, priming, enamel painting, kerosene cleaning, greasing, and restacking under scope of work. Location: GE EP Jodhpur, Rajasthan. Estimated Value/EMD: Not disclosed; detailed BOQ shows 7 items with undefined quantities. Unique aspect: on-site scope of work with man-power for handling, de-rusting, and multiple coating operations. Tender emphasizes pre-dispatch inspection and advance sample approval per buyer’s instructions, with post-approval bulk supply commitment. Keywords: tender in Jodhpur, Rajasthan government tender, SBI-like maintenance procurements for Army workshops.
BB Racker 239 Nos maintenance scope
Surface preparation: rust removal, old paint dirt removal, wire brush/hand grinder
Coatings: one coat red oxide primer, two coats OG enamel paint
Cleaning: kerosene wash of holes, followed by grease application
Restacking as directed by BSO and GE Engr Park Jodhpur
On-site scope with defined delivery at GE EP Jodhpur; pre-dispatch inspection mandatory
Advance sample approval within 5 days of contract award; modifications within 5 days
Submission of PAN, GSTIN, cancelled cheque, and EFT mandate; inspection fees borne by buyer
Details not disclosed; payment terms to be defined in contract; anticipate standard government terms with milestones linked to inspection and delivery
Delivery aligned with approved advance samples; potential timeline adjustments if buyer delays sample approval; no LD for buyer delays
Not specified in available data; penalties typically apply for delays per contract terms
Experience in maintenance/ refurbishment of equipment at military or government facilities
Valid GST registration and PAN;
Demonstrated capability for on-site mechanical work and coating applications
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | SIDHI VINAYAK ENTERPRISES(MSE,MII) Under PMA Winner | ₹99,656 | Item Categories : Upkeeping of BB Racker 239 Nos at GE EP Jodhpur,Removing from stack arranginh on groud by men power |
| L2 | LAXMI BATTERIES PLATE MANUF. COMPANY (MSE,MII) Under PMA | ₹1,01,236 | Item Categories : Upkeeping of BB Racker 239 Nos at GE EP Jodhpur,Removing from stack arranginh on groud by men power |
| L3 | NARENDRA GENERAL SUPPLIERS (MSE,MII) Under PMA | ₹1,01,486 | Item Categories : Upkeeping of BB Racker 239 Nos at GE EP Jodhpur,Removing from stack arranginh on groud by men power |
🎉 L1 Winner
SIDHI VINAYAK ENTERPRISES(MSE,MII) Under PMA
Final Price: ₹99,656
Start
23-Sep-2026, 12:00 pm
End
24-Sep-2026, 12:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
1088
Category
Upkeeping of BB Racker 239 Nos at GE EP Jodhpur
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
7
OEM Avg. Turnover
1
Past Performance
20 %
Warranty Period
1 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Upkeeping of BB Racker 239 Nos at GE EP Jodhpur , Removing from stack arranginh on groud by men power as per scope of work , De rusting removing old loose paint dirt old grease and Scratching with wire brush or hand grinder as per scope of work , Applying one coat of Red oxide metal primer as per scope of work , Applying two coat of OG enameled metal paint as per scope of work , Washing cleaning of all holes by kerosene then applying the grease as per scope of work , Restacking all as directed by BSO and GE Engr Park jodhpur as per scope of work
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
JODHPUR CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | JODHPUR CITY | JODHPUR CITY | - | - | 1 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Upkeeping of BB Racker 239 Nos at GE EP Jodhpur
Scope of works as per appx A attached last page RFP
Removing from stack arranginh on groud by men power as per scope of work
Scope of works as per appx A attached last page RFP
De rusting removing old loose paint dirt old grease and Scratching with wire brush or hand grinder as per scope of work
Scope of works as per appx A attached last page RFP
Applying one coat of Red oxide metal primer as per scope of work
Scope of works as per appx A attached last page RFP
Applying two coat of OG enameled metal paint as per scope of work
Scope of works as per appx A attached last page RFP
Washing cleaning of all holes by kerosene then applying the grease as per scope of work
Scope of works as per appx A attached last page RFP
Restacking all as directed by BSO and GE Engr Park jodhpur as per scope of work
Scope of works as per appx A attached last page RFP
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Upkeeping of BB Racker 239 Nos at GE EP Jodhpur | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 | |
| 2 | Removing from stack arranginh on groud by men power as per scope of work | Scope of works as per appx A attached last page RFP | 239 | nos | janakiramanm | 60 | |
| 3 | De rusting removing old loose paint dirt old grease and Scratching with wire brush or hand grinder as per scope of work | Scope of works as per appx A attached last page RFP | 239 | nos | janakiramanm | 60 | |
| 4 | Applying one coat of Red oxide metal primer as per scope of work | Scope of works as per appx A attached last page RFP | 45 | ltrs | janakiramanm | 60 | |
| 5 | Applying two coat of OG enameled metal paint as per scope of work | Scope of works as per appx A attached last page RFP | 86 | ltrs | janakiramanm | 60 | |
| 6 | Washing cleaning of all holes by kerosene then applying the grease as per scope of work | Scope of works as per appx A attached last page RFP | 239 | nos | janakiramanm | 60 | |
| 7 | Restacking all as directed by BSO and GE Engr Park jodhpur as per scope of work | Scope of works as per appx A attached last page RFP | 239 | nos | janakiramanm | 60 |
PAN Card
GSTIN
Cancelled Cheque
EFT Mandate certified by Bank
Any prior experience certificates related to maintenance of security equipment
Technical bid documents and OEM authorizations if applicable
Pre-dispatch inspection readiness documentation
Key insights about RAJASTHAN tender market
Bidders should ensure on-site capability for rust removal, primer and enamel coating, and restacking. Submit PAN, GSTIN, cancelled cheque, EFT mandate, and experience certificates; comply with pre-dispatch inspection and advance sample approval timelines (5 days each). Delivery to GE EP Jodhpur with inspection by buyer or nominated agency.
Submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide technical bid documents and OEM authorizations if applicable. Pre-dispatch inspection is conducted at seller premises; buyer bears external inspection charges; 7-day inspection window applies.
Coatings include one coat red oxide primer and two coats OG enamel paint after rust removal and surface prepping. Kerosene cleaning of holes precedes greasing; final restacking as directed by BSO and GE Engr Park Jodhpur.
Advance sample submission is required within 5 days of contract award. Buyer will approve or request modifications within 5 days; bulk delivery aligns with approved sample to avoid LDs for buyer delays.
Delivery and installation are to be performed at GE EP Jodhpur, Jodhpur, Rajasthan 342001, with all work compliant to scope of work and inspection requirements.
If the buyer delays approval, the delivery period is reset without LDs for the period of delay; supplier must maintain readiness for bulk supply once approval is granted.