TenderDekho Logo
Active GEM

Bharat Heavy Electricals Limited Goods Supply Tender Haridwar 2026 - Post-Delivery Inspection & GST Invoicing Standards

Bid Publish Date

20-Jul-2026, 8:16 am

Bid End Date

28-Jul-2026, 3:00 pm

Location

HARIDWAR , UTTARAKHAND

Progress

Issue20-Jul-2026, 8:16 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

2350

Categories 22

Tender Overview

Organization: Bharat Heavy Electricals Limited (BHEL) with mandate from the Department of Heavy Industry seeks supply of goods under a 17-item BOQ framework for delivery to Central Store Plant, BHEL HEEP Haridwar, 249403. The scope specifies Only supply of Goods with post-receipt inspection at the consignee site. Bidder must upload mandatory identification and banking documents (PAN, GSTIN, cancelled cheque, EFT mandate) and acknowledge acceptance of all bid terms. The ATC terms require vendor’s unconditional acceptance via signed bid documents. The tender emphasizes e-bidding terms per GEM GTC 4.0 and adherence to Buyer-specified terms and conditions, with inspection coordinated by the buyer. The opportunity is location-specific to Haridwar, Uttarakhand, and involves 17 unnamed items, implying a broad, multi-item procurement footprint with strict document compliance requirements.

Technical Specifications & Requirements

  • No technical specifications are published in the provided data; BOQ contains 17 items with N/A quantities and units, indicating an unclear itemization.
  • Inspection: Post-receipt inspection at Central Store Plant, BHEL HEEP Haridwar (249403).
  • Scope: Bid price to include all cost components for the supply of goods; no pre-dispatch inspection noted as applicable.
  • Payment/terms: GST-compliant invoicing to consignee; vendor must provide EFT mandates and GSTIN alignment; ATC requires vendor to submit signed/bulk bid documents.
  • Documentation: Mandatory upload of PAN, GSTIN, cancelled cheque, and EFT mandate; adherence to GEM GTC 4.0 terms.

Terms, Conditions & Eligibility

  • EMD: Not specified in the provided data; bidders must follow GEM GTC 4.0 acceptance.
  • Delivery: Delivery timelines are tied to contract terms; failure to deliver can trigger contract termination.
  • Payment terms: Invoices issued in the consignee name with the consignee GSTIN; payment terms not explicitly stated.
  • Documentation: Submit PAN, GSTIN, cancelled cheque, EFT mandate; sign and stamp the attached Buyer specification document.
  • Inspection/Acceptance: Post-receipt inspection at the consignee site; pre-dispatch inspection not applicable in ATC.
  • Additional terms: Agreement to all bid terms, ATC, and vendor’s unconditional acceptance; provide documents as required when requested.

Key Specifications

    • Scope: Only supply of Goods (17 items in BOQ)
    • Delivery Location: Central Store Plant, BHEL HEEP Haridwar 249403
    • Inspection: Post Receipt Inspection at consignee site
    • Invoices: Raised in the name of Consignee with Consignee GSTIN
    • Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate
    • ATC Clause: Vendor must sign and accept bid documents and related terms

Terms & Conditions

  • EMD: Not specified in available data; follow GEM GTC 4.0

  • Delivery: As per contract; termination for non-delivery or delays

  • Payment: GSTIN-aligned invoicing to consignee; no explicit payment term

  • Documents: PAN, GSTIN, cancelled cheque, EFT mandate required

  • Inspection: Post-receipt inspection at Haridwar site

Important Clauses

Payment Terms

Invoices must be raised in consignee name with GSTIN; EFT mandate to banks; no separate payment schedule provided in data.

Delivery Schedule

Delivery terms align with contract; failure to deliver or replace defective materials triggers contract termination.

Penalties/Liquidated Damages

Contract termination rights exist for material non-delivery, delays, or misrepresentation; LD mechanisms not detailed in provided data.

Bidder Eligibility

  • Must submit PAN, GSTIN, and bank EFT mandate documents

  • Must accept GEM GTC 4.0 terms and Buyer-added ATC terms

  • Must provide post-receipt inspection readiness and invoicing alignment with consignee GSTIN

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

HW8415822456 , HW8415822464 , HW8415822472 , HW8415822480 , HW8415822499 , HW8415822502 , HW8415822510 , HW8415822537 , HW8415822545 , HW8415822553 , HW8415822561 , HW8415822570 , HW8415822588 , HW8415822596 , HW8415822600 , HW8415822618 , HW8415822626

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Haridwar

Delivery Pincodes

249403

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Paras249403,Shipping Section, Central Plant Stores, HEEP, BHEL, Haridwar-249403 UttarakhandHaridwarUttarakhand2494035090-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9627659.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 17 Items Sign in for GEM prices

#1

HW8415822456

CAMLOCK CONNECTOR 300 AMP MALE COMPLETE PART NO HE 300 M 121

50 no Delivery: 90 days
#2

HW8415822464

CAMLOCK CONNECTOR 300 AMP FEMALE COMPLETE PART NO HE 300 F 122

50 no Delivery: 90 days
#3

HW8415822472

CAMLOCK CONNECTOR 60 AMP MALE COMPLETE PART NO HE 60 M 101

300 no Delivery: 90 days
#4

HW8415822480

CAMLOCK CONNECTOR 60AMP FEMALE COMPLETE PART NO HE 60 F 102

300 no Delivery: 90 days
#5

HW8415822499

SINGLE POLE CONTACTOR PART NO SP 200 50 70

15 no Delivery: 90 days
#6

HW8415822502

ENERGY REGULATOR PART NO ER 70 090

10 no Delivery: 90 days
#7

HW8415822510

AUTO/MANUAL SWITCH WITH INDICATOR PART NO AMS 70 55

5 no Delivery: 90 days
#8

HW8415822537

3PIN PROGRAMMER PANEL MOUNTING SOCKET PART NO PM 70 75

5 no Delivery: 90 days
#9

HW8415822545

CAMLOCK PANEL MOUNTING 300AMPS PART NO HE 300 PM 123

25 no Delivery: 90 days
#10

HW8415822553

HEATING WIRE NI CR,PART NO HE NCW 142

400 mr Delivery: 90 days
#11

HW8415822561

COLD WIRE,PART NO HE CTW 141

40 mr Delivery: 90 days
#12

HW8415822570

CRIMPING FERRULE FOR JOINING HOT AND COLD WIRE,PART NO HE SF 302

25 no Delivery: 90 days
#13

HW8415822588

LOCKING/SAFETY SLEEVE(SET OF CYLINDRICAL BEAD AND 2 BUSH BEADS),PART NO HE CB 301

25 st Delivery: 90 days
#14

HW8415822596

FIBRE INSULATED SLEEVE FOR MALE/FEMALE CAMLOCK OF 300AMPS PART NO HE 300 S 102

50 st Delivery: 90 days
#15

HW8415822600

BAKELITE PIN FOR SLEEVE OF MALE/FEMALE CAMLOCK OF 300AMPS PART NO HE 300 FP 202

50 no Delivery: 90 days
#16

HW8415822618

FIBRE INSULATED SLEEVE FOR MALE/FEMALE CAMLOCK OF 60AMPS PART NO HE 60 S 101

500 st Delivery: 90 days
#17

HW8415822626

BAKELITE PIN FOR SLEEVE OF MALE/FEMALE CAMLOCK OF 60AMPS PART NO HE 60 FP 201

500 no Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate duly certified by Bank

5

GSTIN and invoicing alignment proof

6

Signed and stamped copy of attached Buyer specification document / Bid document

7

Proof of acceptance of GEM GTC 4.0 terms

8

Any OEM authorization if applicable

Frequently Asked Questions

How to participate in Haridwar goods supply tender with BHEL?

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate, sign the Buyer specification document, and accept GEM GTC 4.0 terms. Ensure invoices are raised to the consignee with the consignee GSTIN and be prepared for post-receipt inspection at Central Store Plant, Haridwar.

What documents are required for BHEL Haridwar tender submission 2026?

Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, signed Buyer specification document, and GST-friendly invoicing proof. OEM authorizations may apply if applicable, and all documents must be uploaded as part of bid submission per ATC.

What are the post-delivery inspection requirements for this tender?

Inspection is conducted post-receipt at the consignee site, Central Store Plant BHEL HEEP Haridwar (249403). The tender specifies post-receipt verification of goods before acceptance, with no pre-dispatch inspection indicated in ATC.

What is the invoicing requirement for BHEL Haridwar procurement?

Invoices must be raised in the name of the consignee and must include the consignee GSTIN. This ensures GST compliance and smooth payment processing under the tender terms.

What happens if delivery is delayed for the Haridwar tender?

Delays can trigger contract termination or remedies at the buyer’s discretion. The terms allow termination for failure to deliver within the stipulated delivery period or to replace defective materials promptly.

Which terms govern this e-bid in Haridwar tender 2026?

The bidding follows GEM GTC 4.0, with Buyer-added ATC terms. Acceptance of all terms constitutes bid validity; non-compliance risks rejection and potential debarment from future bids.

Are there any item-level specifications published for the 17 items?

No item-level specifications are listed in the provided data; the BOQ shows 17 items with N/A quantities. Bidders should seek clarification on item details or assume a broad supply scope requiring compliant delivery of multiple goods.

What is the delivery location for the Haridwar tender supply?

Delivery location is the Central Store Plant, BHEL HEEP Haridwar, 249403. Ensure packaging, transport readiness, and conformity to the consignee’s receiving procedures for successful acceptance.