Custom Bid for Services - 200140172 Replacement and Erection of water line and Accessories at CHPFS
Ntpc Limited
MURSHIDABAD, WEST BENGAL
Progress
Quantity
1
Bid Type
Two Packet Bid
The opportunity is issued by Hindustan Aeronautics Limited (HAL) under the Department Of Defence Production for a Custom Bid for Services category, focused on the replacement of cooling water circulation pipes of Bell Furnaces at PM Shop. The tender scope is service-oriented with no BOQ items listed and no explicit location, start, or end dates disclosed. The contract includes a flexible quantity/duration clause up to 25%, ensuring adjustments at contract award, and a mandatory excess settlement option allowing additional charges up to a defined percentage when invoices are raised. Bidders should assess potential scope creep and prepare for variable workload. The opportunity appears to target qualified service providers capable of engineering and executing furnace cooling system piping work within HAL’s PM Shop environment, aligning with defense production standards.
Service category: Replacement of cooling water circulation pipes for Bell Furnaces at PM Shop
Delivery scope details: Coordination with HAL site operations for piping removal and replacement
Financial indicators: Estimated value not disclosed; EMD not disclosed in tender text
Experience requirements: Prior capability in furnace cooling systems and piping work
Quality/Compliance: Align with HAL procurement standards and safety regulations
25% quantity/duration adjustment allowed at contract issue
Excess settlement option with documented invoicing requirements
No BOQ items and no explicit EMD or payment terms stated
Excess settlement provision allows additional charges up to a specified percentage with mandatory supporting documents; exact percentage to be confirmed with HAL SCM
Contractual quantity/duration can be amended up to 25% at issue; delivery milestones to be clarified with HAL post-award
No LD details provided in the available terms; bidders should obtain the penalty framework during clarifications
Proven capability in cooling system piping work for furnace applications
Compliant with HAL procurement rules and defense production safety standards
Financial stability evidenced by recent financial statements
Ntpc Limited
MURSHIDABAD, WEST BENGAL
Hindustan Aeronautics Limited (hal)
BANGALORE, KARNATAKA
Office Of Dg ( Ns & M)
HYDERABAD, TELANGANA
National Aluminium Company Limited, Bhubaneswar
KORAPUT, ODISHA
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar furnace piping replacement work
Financial statements or turnover evidence for last 3 years
EMD submission document (amount not disclosed in tender; obtain exact value)
Technical bid documents and compliance statements
OEM authorizations or vendor approvals (if applicable)
Key insights about KARNATAKA tender market
Bidders should submit GST, PAN, experience certificates, financials, EMD documents, and technical compliance statements. Ensure your team has prior furnace piping experience and provide OEM authorizations if required. Clarify site access, safety norms, and warranty expectations with HAL before submission to meet defense procurement standards.
Mandatory documents include GST certificate, PAN, experience evidence for furnace piping, financial statements, and EMD documents. Also submit technical bid documents, OEM authorizations if necessary, and any safety compliance certificates. Ensure these are attested and submitted per HAL terms.
The tender specifies replacement of cooling water circulation pipes for Bell Furnaces at PM Shop. While no detailed specs are published, bidders should demonstrate capability in furnace piping, compatibility with cooling loops, and alignment with HAL site safety and quality expectations.
The contract allows up to 25% adjustment in quantity or duration at the time of issue. After contract issuance, the same 25% limit applies. Bidders should plan for possible scope expansion and factor this into pricing and resource allocation.
Excess settlement permits additional invoicing charges up to a defined percentage for addons. Bidders must declare applicability during invoice creation and provide mandatory supporting documents. The total invoice must stay within the externally defined excess settlement cap.
The released terms do not specify LDs or penalties. Bidders should seek explicit guidance on any liquidated damages, performance bonds, or penalties during clarifications and ensure their pricing accounts for potential delays or performance deviations.
The tender text does not specify mandatory standards. Bidders should confirm whether HAL requires ISI, ISO, or internal HAL safety certifications for furnace piping work and include relevant certifications in the bid if mandated.
Request a site briefing from HAL to understand PM Shop access, safety protocols, and any special installation constraints. Prepare a site-specific methodology, risk assessment, and waste management plan to accompany the technical bid and demonstrate compliance.
Office Of Dg ( Ns & M)
📍 HYDERABAD, TELANGANA
Access all tender documents at no cost
Main Document
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS