Bid Publish Date
07-Oct-2026, 7:59 pm
Bid End Date
17-Oct-2026, 8:00 pm
Location
Progress
The Indian Army, Department Of Military Affairs, issues a procurement notice for a controller card in Kathua, Jammu & Kashmir 184101. The scope is limited to the supply of goods with option-based quantity adjustments up to 25% during and after contract award. Bidders must provide data sheets, ISO 9001 certification for either the bidder or OEM, and material test certificates. The tender emphasizes stringent verification via the buyer’s lab and mandates End User Certificate formatting when required. The award hinges on data-sheet conformity and adherence to delivery timelines, with the option to expand or modify quantities at contracted rates.
Product name: Controller Card
Certifications: ISO 9001 (bidder or OEM); BIS/type test certificates as applicable
Quality: Material Test Certificate to accompany delivery; buyer lab results final
Documentation: Data Sheet must match offered product; mismatch leads to rejection
Consortium: Allowed; each member equally responsible
Quantity may increase/decrease by 25% of bid quantity
Delivery period linked to the last date of original delivery order
Mandatory data sheets and ISO 9001 certification
Not specified in data
Delivery period starts from the last date of original delivery order; extended time computed by formula; minimum 30 days
Not specified in data
ISO 9001 certification either for bidder or OEM
Ability to provide Data Sheet that matches offered product
Capability to supply Controller Cards with Material Test Certificate
Quantity
1
Bid Type
Single Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
CONTROLLER CARD
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Kathua
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Kathua | Kathua | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
ISO 9001 certificate (bidder or OEM)
Data Sheet of offered product
Material Test Certificate
BIS licence / type test certificate / approval certificates as applicable
End User Certificate in Buyer format (if requested)
Key insights about JAMMU AND KASHMIR tender market
Bidders should submit PAN, GSTIN, cancelled cheque, and EFT mandate; upload Data Sheet matching the offered controller card; provide ISO 9001 certificate (bidder or OEM) and Material Test Certificate. The quantity may vary by up to 25%, with delivery timelines tied to the original order date.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, ISO 9001 certificate, Data Sheet, Material Test Certificate, BIS/type-test certificates as applicable, and End User Certificate if requested by the buyer.
Bidders must provide ISO 9001 certification and any product-specific BIS or type-test certificates; the Data Sheet must align exactly with the offered controller card; Material Test Certificate is mandatory for acceptance by the buyer's lab.
Delivery period begins from the last date of the original delivery order; additional time is calculated by (increase in quantity / original quantity) × original delivery period, with a minimum of 30 days.
The Data Sheet must perfectly match the product specifications in the bid; any unexplained mismatch can lead to bid rejection; ensure all technical parameters are consistent with the offered controller card.
The purchaser may increase or decrease the quantity by up to 25% at contract placement and during currency, with rates unchanged; ensure readiness to supply additional units within the extended delivery timeline.
Submit ISO 9001 certificate, BIS/type-test certificates, End User Certificate (if required), and Material Test Certificate; include data sheets and bank-related KYC docs such as EFT mandate.
Scope is strictly ‘Supply of Goods’ for controller cards; no installation or commissioning services are listed; ensure shipments include required testing certificates and data sheet documentation.