Bid Publish Date
04-Sep-2026, 5:04 pm
Bid End Date
14-Sep-2026, 6:00 pm
Location
Progress
Indian Army invites bids for Office Gypsum False Ceiling, PVC Wall Paneling, Glass Door, Zebra Blinds, Removal of Existing Flooring, Conference Table, Revolving Chairs, Signage Wall Features, LED Lighting Fixtures, Standard Installation Testing, Complete Bathroom Renovation including demolition of existing in PUNE, MAHARASHTRA. Quantity: 2112. Submission Deadline: 14-09-2026 18: 00: 00. Submit your proposal before the deadline.
Quantity
2112
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
Office Gypsum False Ceiling , PVC Wall Paneling , Glass Door , Zebra Blinds , Removal of Existing Flooring , Conference Table , Revolving Chairs , Signage Wall Features , LED Lighting Fixtures , Standard Installation Testing , Complete Bathroom Renovation including demolition of existing
Pre-Bid Date
09-09-2026 10:00:00
Pre-Bid Venue
Block B8, QM Office, Command Hospital (SC), Pune
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
PUNE CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | PUNE CITY | PUNE CITY | - | - | 576 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Office Gypsum False Ceiling
Gypsum Sheet False Ceiling 2 x 2 including framework accessories and complete installation
PVC Wall Paneling
PVC Wall Paneling including complete fixing and finishing 22ft10ft
Glass Door
Glass Door 7 x 4 complete with floor spring handles and accessories
Zebra Blinds
Zebra Blinds complete with installation 7260
Removal of Existing Flooring
Removal of Existing Flooring Disposal of Debris and Supply Fixing of New Vitrified Tiles 4 x 2 including labour and consumables
Conference Table
Conference Table 12 x 6 with premium finish complete
Revolving Chairs
High Back Executive Revolving Chairs
Signage Wall Features
Decorative Elements Signage Wall Features including Army Logo AcrylicMetal Signage and Decorative Wall Treatment
LED Lighting Fixtures
Electrical Wiring LED Lighting Fixtures Distribution Board DB MCBs Switches Power Data Points complete
Standard Installation Testing
Supply Installation Testing Commissioning of 3 TR Cassette Type Air Conditioner complete with Indoor Unit Outdoor Unit Refrigerant Gas Drain Piping Electrical Interconnection Cable Wireless Remote MS Outdoor Unit Stand and Standard Installation Accessories
Complete Bathroom Renovation including demolition of existing
Complete Bathroom Renovation including demolition of existing tiles waterproofing floor wall tiling brickwork WC wash basin PVC door aluminium window with exhaust fan plumbing works sanitary fittings false ceiling mirror towel hanger napkin holder soap dish and electrical works
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Office Gypsum False Ceiling | Gypsum Sheet False Ceiling 2 x 2 including framework accessories and complete installation | 576 | sq ft | qmprocurementofficer | 15 | |
| 2 | PVC Wall Paneling | PVC Wall Paneling including complete fixing and finishing 22ft10ft | 880 | sq ft | qmprocurementofficer | 15 | |
| 3 | Glass Door | Glass Door 7 x 4 complete with floor spring handles and accessories | 1 | nos | qmprocurementofficer | 15 | |
| 4 | Zebra Blinds | Zebra Blinds complete with installation 7260 | 60 | sqft | qmprocurementofficer | 15 | |
| 5 | Removal of Existing Flooring | Removal of Existing Flooring Disposal of Debris and Supply Fixing of New Vitrified Tiles 4 x 2 including labour and consumables | 576 | sqft | qmprocurementofficer | 15 | |
| 6 | Conference Table | Conference Table 12 x 6 with premium finish complete | 1 | nos | qmprocurementofficer | 15 | |
| 7 | Revolving Chairs | High Back Executive Revolving Chairs | 14 | nos | qmprocurementofficer | 15 | |
| 8 | Signage Wall Features | Decorative Elements Signage Wall Features including Army Logo AcrylicMetal Signage and Decorative Wall Treatment | 1 | job | qmprocurementofficer | 15 | |
| 9 | LED Lighting Fixtures | Electrical Wiring LED Lighting Fixtures Distribution Board DB MCBs Switches Power Data Points complete | 1 | job | qmprocurementofficer | 15 | |
| 10 | Standard Installation Testing | Supply Installation Testing Commissioning of 3 TR Cassette Type Air Conditioner complete with Indoor Unit Outdoor Unit Refrigerant Gas Drain Piping Electrical Interconnection Cable Wireless Remote MS Outdoor Unit Stand and Standard Installation Accessories | 1 | nos | qmprocurementofficer | 15 | |
| 11 | Complete Bathroom Renovation including demolition of existing | Complete Bathroom Renovation including demolition of existing tiles waterproofing floor wall tiling brickwork WC wash basin PVC door aluminium window with exhaust fan plumbing works sanitary fittings false ceiling mirror towel hanger napkin holder soap dish and electrical works | 1 | job | qmprocurementofficer | 15 |
Discover companies most likely to bid on this tender