Bid Publish Date
08-Aug-2026, 9:06 am
Bid End Date
11-Sep-2026, 5:00 pm
Location
Progress
Hindustan Aeronautics Limited (Department of Defence Production) seeks procurement of a Thermal chamber with humidity test facility. The contract covers Supply, Installation, Testing and Commissioning of the equipment. The scope indicates potential variability: an option to increase or decrease quantity by up to 25% at bid time and during the contract currency, at contracted rates. The delivery timeline hinges on a formula linked to the original delivery period, with a minimum extension of 30 days. This tender emphasizes turnkey delivery and post-installation support within HAL’s defense manufacturing framework. Location is implied to be India, under HAL’s purview, with technical readiness for complex test equipment acquisitions. Unique aspects include the explicit option clause and a combined procurement scope rather than a simple supply order.
Option Clause allows ±25% quantity variation at contract placement and during execution
Scope includes Supply, Installation, Testing and Commissioning of the equipment
Delivery period adjustments follow a formula; minimum extension is 30 days
Purchaser may vary quantity by up to 25% at contract award and during execution at contracted rates; delivery period adjusts accordingly
Bid price must cover supply, installation, testing, and commissioning of the thermal chamber with humidity capability
Buyer-uploaded ATC document governs specific bid terms and conditions; bidders must view and comply
Demonstrated experience in supplying/installing high-precision environmental test chambers
Capability to perform installation, testing and commissioning under defense procurement norms
Compliance with HAL/Department of Defence Production procurement requirements and ATC terms
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Thermal chamber with Humidity test facility
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
SULTANPUR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SULTANPUR | SULTANPUR | - | - | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
11-Sep-2026, 11:30 am
Opening Date
11-Sep-2026, 12:00 pm
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar thermal chamber/humidity test facility projects
Financial statements (last 2-3 years) or bank statements
EMD submission proof (online/DD as applicable)
Technical bid documents demonstrating compliance with the stated scope
OEM authorization or authorised distributor certificate (if applicable)
Any ATC-specific documents uploaded by the purchaser
Key insights about UTTAR PRADESH tender market
Bidders should submit the technical bid with evidence of prior experience in similar environmental test chambers, along with GST, PAN, and financials. Include OEM authorizations and EMD proof. Review the ATC document uploaded by HAL for specific compliance indicators, and ensure readiness for turnkey installation and commissioning.
Essential documents include GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD proof, technical bid, OEM authorization, and any ATC-specified documents. Ensure all documents are current and match the bid’s scope of supply and installation requirements.
Delivery is governed by the original delivery period with an option to extend; quantity may increase or decrease by up to 25% at contract, with the additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Specific standards are not listed in the data; bidders should consult the ATC for any ISO/IEC, BIS, or vendor-specific requirements and provide relevant certifications_across installation and commissioning processes.
The scope includes Supply, Installation, Testing and Commissioning of the Thermal Chamber with humidity testing capability; the bid must include all costs to deliver a turnkey solution under HAL’s defense procurement framework.
Exact submission deadlines are not provided in the data; bidders must refer to the ATC document uploaded by the purchaser and HAL communications for the definitive bid submission date and portal requirements.
The ATC document governs bidder obligations beyond the base tender, including compliance, documentation, and any special clauses; bidders must view and comply with its terms to avoid disqualification.