ROTORK ELECTRICAL ACTUATOR Model: KL30 (As per drawing attached)
Instrumentation Limited
Bid Publish Date
18-Feb-2026, 6:36 pm
Bid End Date
05-Mar-2026, 7:00 pm
Location
Progress
Quantity
9
Category
Elomatic Actuator Sub-assembly with actuator Model no. ED200
Bid Type
Single Packet Bid
Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow. Product category: Elomatic actuator sub-assembly with ELOMATIC actuator (Model PD60, ED200). Location: Jhansi, Uttar Pradesh 284001. Estimated value and quantity are not disclosed; procurement focuses on actuator sub-assembly components. Unique clause permits a 25% quantity upsize/upsell at contracted rates, with delivery timelines adjustable from the last delivery order date. This tender emphasizes the integration of Elomatic PD60/ED200 subsystems within power plant equipment, requiring compatibility with existing control interfaces and mechanical interfaces. The tender’s ATC file and BOQ are not populated, indicating a specification gap that bidders must clarify during pre-bid engagement. The opportunity hinges on vendor capability to supply sub-assemblies under flexible delivery terms while complying with the option clause.
Elomatic actuator sub-assembly with Model PD60 and ED200
Bid quantity subject to 25% upsize during contract
Delivery period linked to last delivery order date with extension formula
ATC document uploaded; technical data not publicly visible in BOQ
No explicit performance or material standards listed in available data
Key Term 1: Option clause allows ±25% quantity change at contracted rates
Key Term 2: Delivery extension calculated with minimum 30 days
Key Term 3: No BOQ items; requires bidder due diligence and clarifications
Delivery period starts from last date of original order; extended period uses (additional/ original) × original days, min 30 days
Not explicitly provided; bidders should confirm payment terms during bid submission and clarifications
Not specified; bidders should verify any LD provisions during pre-bid inquiry
Experience in supplying actuator sub-assemblies or OEM components
Financial stability evidenced by recent financial statements
Ability to comply with option clause and delivery extensions
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Instrumentation Limited
Nuclear Power Corporation Of India Limited
KANCHIPURAM, TAMIL NADU
Patratu Vidyut Utpadan Nigam Limited
HAZARIBAG, JHARKHAND
Indian Army
AGRA, UTTAR PRADESH
Instrumentation Limited
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar actuator sub-assembly supply
Financial statements (last 2-3 years)
EMD submission details (amount and instrument)
Technical bid documents demonstrating compliance with PD60/ED200 sub-assemblies
OEM authorization letter from Elomatic (if required)
Any pre-bid inquiry responses or ATC clarifications
Key insights about UTTAR PRADESH tender market
Bidders should review the ATC document, confirm PD60/ED200 compatibility, and submit the required documents (GST, PAN, experience, financials, EMD). Clarify the 25% quantity option and delivery extension mechanism in the bid. Ensure OEM authorization is provided if required.
Required documents include GST certificate, PAN, latest financial statements, experience certificates for similar supply, EMD documentation, technical bid for PD60/ED200, and OEM authorization if applicable. Prepare pre-bid inquiry responses for ATC clarifications.
Technical data is not fully disclosed in BOQ; bidders must refer to uploaded ATC and seek clarifications. Ensure PD60/ED200 compatibility with existing UPVUNL systems and confirm electrical and mechanical interfaces with the actuator sub-assembly.
Delivery periods commence from the last date of the original delivery order. If the option clause is exercised, extended time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.
EMD amount is not disclosed in the available data; bidders should consult the tender ATC and terms to determine the exact EMD value and instrument (DD/online) during bid submission.
Check for OEM authorization letters (Elomatic) in the technical bid submission. If required, provide current authorization, model-specific approvals for PD60/ED200, and any regional compliance certificates.
The purchaser may adjust quantities by up to 25% of bid quantity at contract award and during the currency of the contract, with delivery time recalculated accordingly and minimum 30 days extension when applicable.
The procurement is managed by Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) under the Energy Department, with activities centered in Jhansi, Uttar Pradesh.
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS