Advanced Weapons And Equipment India Limited invites bids for WELD WHEEL AS PER DRG. NO. SP-181/804 under the Department of Defence Production. The tender includes a standard quantity option clause allowing up to 25% quantity variation during contract and extended delivery windows with a minimum extension of 30 days. Inspection is conducted by CGM or HIS authorised representative at consignee site. Bidder must align with warranty, PSD, and GST obligations, and provide PAN, GSTIN, canceled cheque, and EFT mandate for vendor code creation. This procurement emphasizes compliance with the specified drawing DRG SP-181/804 and proper warranty documentation. Key differentiators include the option quantity clause, post-receipt inspection, and mandatory certifications on upload. This tender is positioned for suppliers capable of meeting Defence Production standards and timely delivery.
WELD WHEEL as per DRG SP-181/804
Warranty: 1 year from final acceptance
Inspection: Post-receipt by CGM/HIS representative
PSD: Nil up to ₹10 lakhs; 5% above ₹10 lakhs
LD: 0.5% per week; max 10% of contract value
GST reimbursement as per actuals or applicable rate
Vendor code creation: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Quantity variation up to 25% with extension rules
Warranty and originality certificates mandatory
PSD and LD conditions with clear thresholds
GST reimbursement as per actuals or applicable rates; no explicit advance; post-acceptance payment terms
Delivery period based on original order; extension for increased quantity requires minimum 30 days
0.5% LD per week, up to 10% of contract value
Must meet warranty and documentation requirements
Must upload all ATC-mandated certificates
Must provide PAN, GSTIN, and EFT mandate for vendor code creation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
WELD WHEEL AS PER DRG. NO. SP-181/804
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Kanpur Nagar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Kanpur Nagar | Kanpur Nagar | - | - | 20 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by Bank
Warranty certificate
Originality/genuinity certificate
ATC certificates and technical compliance certificates
Key insights about UTTAR PRADESH tender market
Bidders should submit all mandatory documents (PAN, GSTIN, Cancelled Cheque, EFT Mandate) along with warranty and originality certificates. Ensure compliance with DRG SP-181/804, upload post-receipt inspection readiness, and factor 0.5% weekly LD up to a 10% cap. Verify GST applicability and option quantity clause before submission.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, warranty certificate, originality certificate, and any required certificates referenced in the ATC. Ensure bid is accompanied by these documents to avoid rejection; include vendor code creation documents as specified by the buyer.
Warranty: 1 year from final acceptance at consignee location; warranty certificate must be supplied with the goods. Payment terms follow GST provisions; no advance specified; reimbursement of GST as applicable, with vendor to quote accordingly and adhere to post-acceptance payment norms.
Option clause allows up to 25% quantity variation during contract and during the currency of the contract. Additional delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, unless original period exceeds it. Delivery starts from last date of original order.
Post-receipt inspection is conducted by CGM or HIS authorised representative at the consignee site. Pre-dispatch inspection is not mandatory unless the ATC specifies, ensuring conformity before acceptance.
PSD is Nil up to ₹10 lakhs; above ₹10 lakhs, PSD is 5% of total contract value. Late delivery incurs Liquidated Damages at 0.5% per week up to a maximum of 10% of contract value, ensuring bidders meet timelines and maintain quality.
Bidders must upload necessary certificates per ATC, ensure warranty and originality certificates, and align with DRG SP-181/804. RBI/DEFENCE sector alignment is implied; ensure GST compliance and ISO-like documentation as applicable to the defence procurement.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS